Permit EPP 26 - Duntroon Basin. Surrender report.
This EPP 26 surrender report has been furnished to the SA offshore Designated Authority as a result of the application made on 21/8/96 by BHP Petroleum for permission for the joint venture to surrender the permit, before committing to unwanted...-
Document
Published: 19 Feb 1997
-
Proposal to relinquish permit EPP 21, South Australia.
A complete re-evaluation of all known prospects and leads within EPP 21 was undertaken by the permittees in order to define any prospects worthy of drilling in permit Year 4, ending 28 June 1986, by which time a commitment to drill one well and...-
Document
-
1992 marine seismic survey, DH92, final report.
AIM: To confirm a number of prospects and leads outlined with the most recent interpretation of the existing seismic data over both permit areas. Due to the presence of shallow intrusives and difficulty in mapping the basement in certain areas,...-
Document
-
Vivonne 1. Test reports.
Contains the operator's pre-drill prospect evaluation file, the drilling contractor's FMS (Formation Micro Scanner) dipmeter log interpretation report and summary plots, and the well seismic processing (VSP velocity survey) report and GEOGRAM plots.-
Document
-
Greenly prospect file, EPP 26, Duntroon Basin, offshore South Australia.
BHPP's Greenly 1 well is herein proposed to test a faulted hanging wall anticline with minor crestal collapse faults, an estimated fault-dependent maximum closure area of 53.3 square km, and a closure height of 140 metres at the primary target. The...-
Document
-
Duntroon Basin. Upper Borda [Formation] petroleum system.
There is no abstract created for this record-
Document
Published: 05 Aug 1996
-
1991 marine seismic survey, DH91, final report.
AIM: The DH91 seismic survey programme was designed to provide new 2D coverage of potential prospects and leads in an offshore area with very little modern seismic data, especially in the southeastern part of the permit. Complementary 1983 and 1984...-
Document
-
Borda 1 Duntroon Basin regional geological study.
Report gives an analysis of the Schlumberger FMS (Formation Micro Scanner) well log data obtained from Borda 1, as part of a study of dipmeter logs derived from each of the three BHP Petroleum wells in the basin. The aim is to determine regional...-
Document
-
Borda Prospect file, EPP 25, Duntroon Basin, offshore South Australia.
BHPP's Borda 1 well is herein proposed to test a faulted four-way dip closure in permit EPP 25 with an estimated fault dependent closure area of 26.2 square kilometres and height of 125 metres. The trap formed during the Late Eocene to Early...-
Document
-
Greenly 001 EPP 26. Basic well completion report.
Greenly 1 wildcat was located in the southern part of EPP 26, approximately 10 km southeast of Platypus 1, 40 km west-northwest of Duntroon 1, and 150 km southwest of Port Lincoln. It was directionally drilled over the period 4 June to 14 August 1993...-
Document
-
Geochemical analysis of samples from Platypus 1 and Echidna 1, Duntroon Basin, offshore South Australia.
30 cuttings samples from Platypus 1 and 10 cuttings samples from Echidna 1 were analysed for total organic carbon (TOC), and appropriate samples then underwent Rock-Eval pyrolysis, if such pyrolysis data was not available from previous studies, to...-
Document