-
RB 98/00026 Partial leach geochemical survey, Monarto South, South Australia.
A partial leach soil geochemical survey has been conducted over shallowly buried Cambrian Kanmantoo Trough metasediments in the Monarto South area. The survey was designed to cover a aeromagnetic high anomaly, that is interpreted to be related to a...-
Document
Published: 01 Apr 1998
-
Parndana. Annual reports and final report to licence expiry/full surrender, for the period 27/10/2006 to 26/10/2008.
Exploration for possible economic stratiform/syngenetic base metal deposits and/or structurally controlled epithermal/hydrothermal gold and uranium occurrences within Lower Cambrian metasediments over the central section of Kangaroo Island included...-
Document
Published: 22 Apr 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Langhorne Creek, Bremer, Hartley and Currency Creek (the Fleurieu Project). Joint annual reports for the period 1/10/2008 to 30/9/2013.
In the sixth year of the project, the principal activity was the drilling of two inclined diamond holes for 633.5 m during October 2008 to investigate a possible northern buried extension of the known Rankine Trend mineralisation on EL 3641 ground...-
Document
-
Truro. Progress reports and annual reports to licence expiry/renewal, for the period 15/7/1991 to 14/7/1996.
CRA's acquisition and interpretation of aeromagnetic and ground magnetic surveys, plus its gravel and stream sediment sampling, have successfully located a few kimberlites in the Truro area, 70 km north-east of Adelaide, where a large number of...-
Document
-
Kangaroo Island. Progress reports to licence expiry/full surrender for the period 15/9/1971 to 14/9/1972.
Exploration for possible Kanmantoo mine style economic copper mineralisation on the Dudley Peninsula at the far eastern end of Kangaroo Island has consisted of a geological survey of coastal cliff exposures of known sulphide-rich bedrock strata, and...-
Document
-
EL 6920 Partial Surrender Report to period ending 15/08/2024
This report represents a partial surrender of EL 6920 "The Tapanappa Project" and covers work completed in the reporting period to 15th August 2024. The Tapanappa Project area is located approximately 60 km south of Adelaide on the Fleurieu Peninsula...-
Document
Published: 12 Oct 2024
- ZIP,