-
Mount Misery. Progress reports and final report to licence expiry/full surrender, for the period 30/11/1981 to 29/11/1985.
Stratabound, chemically precipitated Telfer - type replacement style vein gold was the target of exploration undertaken over an area 25 km north-west of Yunta, which contains good exposures of Neoproterozoic Umberatana Group clastic metasediments that...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
RB 80/00006 Re-assessment of the age of the Beda Volcanics on the Stuart Shelf, South Australia.
Geochronological analyses of samples of the Willochra Subgroup and the Tapley Hill Formation, which unconformably overlie the Beda Volcanics, give ages of 724±40 Ma and 750±53 Ma respectively, thereby indicating that the original age determination of...-
Document
Published: 01 Jan 1980
-
RB 93/00019 Geology of the Upalinna Diapir, central Flinders Ranges.
Investigation of the Upalinna Diapir, located 20 km east of Wilpena Pound in the Adelaide Geosyncline, has identified a number of structural and sedimentary features normally associated with evaporite diapirs. The Upalinna Diapir is a small,...-
Document
Published: 01 Feb 1993
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-31 - Bute township area mineral prospect. Project interim and final reports.
The licensee, Peter Forwood, has been involved in mineral exploration at Bute for many years, initially with North Broken Hill Ltd in ELs 248, 420, 577 and 972, and has pursued the exploration of the area through many phases. Two important features...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-03, Marathon South mineral prospect. Project interim and final reports.
During exploration of Exploration Licence 3209 situated on the northern Stuart Shelf, gravity and magnetic modelling performed in early 2004 highlighted several anomaly source bodies, which immediately became of much interest as potential iron-oxide...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-13, evaluation of the Marathon South mineral occurrence. Project interim and final reports.
Following further detailed ground gravity surveying and data processing carried out to better understand the gravity response of relatively dense and weakly magnetic basement rocks at the Marathon South prospect, located within EL 3209 and lying...-
Document
Published: 10 May 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports to licence expiry/renewal, for the period 13/10/2000 to 12/10/2005.
The Woocalla licence area is continuing to be explored for buried Neoproterozoic stratiform copper mineralisation of the various styles known to be present near Mount Gunson, whilst in addition, the underlying Mesoproterozoic basement is regarded as...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Mount Gunson, Woocalla, Bernard Hill, Mount Moseley and Emmie Bluff (the Mount Gunson Project). Respective second to fourth partial surrender reports, for the overall period 15/7/1994 to 12/10/2004.
No work has been undertaken on the currently relinquished portions of ELs 3112, 2639, 3008 and 3022. However, as an attachment to the current EL 3112 relinquishment report, all technical data for Stuart Metals' recent diamond drillhole MGD24 (to...-
Document
-
Intercept Hill. Annual and final surrender reports for the period 23/1/2001 to 22/1/2003.
The Intercept Hill area, located between the mining centres of Olympic Dam and Mount Gunson, and geographically coincident with the trans-continental G2 gravity corridor, was considered to have potential for Olympic Dam style deposits in...-
Document
Published: 09 Sep 1903
-
Mount Gunson. Progress reports and technical reports to licence expiry/re-issue over a larger area, for the period 25/10/1979 to 20/12/1985.
As part of an ongoing search for extensions to the Cattlegrid orebody style of stratiform Cu-Fe-Mn mineralisation within its exploration licences on the Stuart Shelf, besides testing for any indications of Olympic Dam type Cu-U-Au deposits in the...-
Document
-
Data release - as updated : One Tree Hill (part of the Manna Hill Project). Annual reports and final report to licence expiry/full surrender, for the period 5/11/2007 to 4/11/2017.
Exploration for possible economic vein-style and structurally controlled gold with Adelaidean bedrock sediments in an area located between the towns of Yunta and Manna Hill was conducted using low cost remote sensing, geochemical and geophysical...-
Document
Published: 15 Dec 1917
-
Data release - as updated : Kapunda North / Bagot Well North (part of the Eudunda Project). Licence-specific annual reports and final report submitted to licence expiry/full surrender, for the period 15/11/2005 to 12/12/2015.
Exploration for copper mineralisation within an area centred immediately north-northeast of Kapunda has as its initial objective to find shallow deposits of oxide and carbonate ores similar to those mined historically at Burra and Kapunda, focussing...-
Document
-
Data release [made at SA Director of Mines' discretion] : Yeltacowie (part of the Mount Gunson Project). Technical reports and annual reports to licence expiry/renewal, for the period 4/5/1998 to 3/5/2003.
Stuart Metals took up EL 2516 covering ground in the Elizabeth Creek - Yeltacowie Homestead area primarily to explore it for stratiform copper mineralisation of the various styles present in the Mount Gunson area. In addition, it was thought that the...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 4 of 4 ].
During licence Year 12, following encouraging results made by its continuing exploratory drilling, Gunson Resources was able to negotiate a joint venture over the Mount Gunson Project tenements with Falconbridge Limited through its subsidiary Noranda...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1998 to 17/10/2008 [ Index Part 2 of 4 ].
Stuart Metals is primarily exploring EL 1946 for stratiform copper mineralisation of the various styles known to be present in the Mount Gunson district. In addition, the company regards the largely unknown Mesoproterozoic basement to have strong...-
Document