-
Data release - as updated : Crystal Brook and Port Pirie (the Wandearah Project). Joint annual reports to licences' respective full surrenders, for the period 2/8/2008 to 26/4/2018.
Buried basement-hosted iron oxide - associated copper-gold (IOCG) mineralisation of either Moonta-Wallaroo or Olympic Dam style is the target of ongoing exploration on the two adjacent subject tenements. In addition, the current holder considers that...-
Document
Published: 29 May 1918
-
The Hummocks. Annual reports and final report to licence full surrender, for the period 30/6/2009 to 17/8/2017.
EL 4278 was Southern Uranium's first mineral exploration foray into the northern Yorke Peninsula. The subject tenement was pegged in January 2009 in order to secure ground surrounding the northern reaches of the Pine Point Fault. This particular...-
Document
Published: 31 Aug 1917
-
Bute - Port Broughton area. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 7/6/1979 to 18/1/1991.
TARGET: Uranium and base metal deposits associated with Early to Middle Proterozoic basement geological structures and rock units in Spencer Gulf coastal areas east and south of Port Broughton. EXPLORATION: Aerial magnetic and radiometric surveys,...-
Document
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 5 - Wauraltee airborne electromagnetic (AEM) geophysical survey. Project PT1-05 final report.
EL 4177, made up of three disjoint parts, is located on the central-western side of Yorke Peninsula near the towns of Port Victoria, Maitland and Arthurton, and covers a total area of 243 square km. The underlying basement rocks there are part of the...-
Document
Published: 05 Aug 1912
-
Port Pirie district (part of the G2 [Lineament] Project). Annual reports plus final report to licence expiry/full surrender, for the period 29/3/1996 to 28/3/2000.
An airborne magnetic/radiometric survey to infill recent SAEI regional survey coverage was carried out within the G2 structural corridor, south-east of Port Pirie. Six bullseye magnetic highs, consistent with kimberlite emplacement, and one having...-
Document
Published: 20 Mar 1997
-
Crystal Brook area (part of G2 [Lineament] Project). Annual and final reports for the period 29/3/1996 to 28/3/2000.
An aeromagnetic / radiometric survey was carried out within the G2 structural corridor, south-east of Port Pirie, as part of a search for possible Moonta, Olympic Dam or Ernest Henry type gold - copper mineralisation, and for any diamond-bearing...-
Document
-
Cultana basement regional geology 3D Model.
The Cultana basement 3D Geological Model covers a region which includes the Roopena, and western half of the Cultana, 1:100,000 mapsheet areas. The subsurface geology that has been modelled comprises a succession of deformed Palaeoproterozoic...-
Model
- PDF,
- ZIP