-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine, Bonython Hill, Mutooroo West, Oratan [Rock] and Cutana (the Curnamona South Project). Joint annual reports for the period 1/1/2014 to 31/12/2015.
Several separate areas that cover ground straddling the major tectonic boundary between the Olary and Broken Hill domains of the southern Curnamona Province are being explored for possible economic buried stratabound Proterozoic iron ore, epithermal...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Weekeroo Hill. Progress reports and final report to licence full surrender, for the period 18/4/1974 to 21/12/1974.
In a search for possible economic epithermal / stratiform / metamorphic base metals and gold within the Weekeroo Inlier, detailed geological mapping, rock chip sampling and an office evaluation of previous exploration were carried out for the Weekeroo...-
Document