-
RB 98/00022 Review of open file company exploration data from the early 1980s to mid-1997, over the Yunta, Winnininnie, Anabama and Oakvale 1:100 000 map sheets, OLARY 1:250 000 map sheet, South Australia.
Significant exploration focussed on: · stratabound 'Telfer-style' gold in Adelaidean metasediments in the Nackara Arc, using stratiform or stratabound structurally-controlled genetic models; and structurally controlled gold and base metal...-
Document
Published: 01 Jul 1997
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-21 - Mulyungarie area - Junction Dam Palaeoproterozoic metasedimentary/volcanogenic base metal and precious metal mineral prospects. Project interim and final reports.
In 2008, as part of work being performed for it to earn a 51% interest in the Mundi Mundi Plains joint venture exploration licences, Teck Cominco identified two geophysical targets within South Australia on Kalkaroo EL 3328 which it thought were...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-27, K1 mineral prospect. Project interim and final reports.
In 2005, EL 2776/3478 farminee Western Plains Gold, to help achieve its commitment towards earning a 60% interest in the subject licence, and as part of its exploration focus on finding iron oxide - associated copper-gold (IOCG) mineralisation within...-
Document
Published: 19 Jun 1906
-
Boolcoomata (part of the Drew Hill Project). Final report at licence expiry/full surrender for the period 30/9/2003 to 29/9/2008.
An area situated on Boolcoomata Station, ~35 km east-northeast of Olary, was explored both for possible epithermal/hydrothermal copper-gold-molybdenum deposits and for hydrothermal or stratiform/syngenetic base metal deposits that may have formed...-
Document
Published: 29 Apr 1909
-
Outalpa Hill. Data release made upon the full surrender of a subsequent licence : progress reports to licence expiry, for the period 15/7/1988 to 8/8/1994.
Exploration for possible economic gold occurrences in an area surrounding Outalpa Hill in the Olary Ranges, 25 km north of Manna Hill township, has been conducted initially by a private prospecting syndicate with the assistance of industry...-
Document
-
Benagerie Ridge. [BHEI consultant's] geological interpretation, 1996-1997.
As part of the Broken Hill Exploration Initiative, solid geology interpretation was carried out over a large area of concealed prospective Palaeoproterozoic and Mesoproterozoic basement within the Curnamona Craton, to derive stratigraphic / structural...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Bimbowrie. Annual reports for the period 4/11/2009 to 11/11/2018.
During licence Year 6 (2009-2010), the first year of tenure of renewed EL 4375, the main exploration activities undertaken by Sinosteel-PepinNini Curnamona Management Pty Ltd (SPCM) were to conduct two drilling campaigns, the first designed to...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mingary. Annual reports for the period 21/6/2001 to 5/7/2014.
An area located close to the SA-NSW State border, and centred ~55 km west-southwest of Broken Hill, covers part of the south-eastern corner of the Palaeoproterozoic Olary Domain of the Curnamona Province and the western portion of Broken Hill Domain,...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Outalpa (part of the Curnamona Project). Annual reports for the period 10/6/2012 to 9/6/2018.
The Outalpa (EL 3472) licence area, comprised of two separate sub-blocks respectively centred ~30 km north-northeast and ~45 km north-northwest of Manna Hill, is one of five adjacent tenements held by PepinNini Minerals within the eastern Adelaide...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kalkaroo. Annual reports submitted prior to licence sale and the commencement of the Curnamona Cu-Au Project, for the period 18/1/2000 to 9/5/2003.
During 2000-2001, the first year of renewed Kalkaroo EL 2720, joint venture operator Mount Isa Mines (MIM) continued with its geochemical and geophysical exploration of the Proterozoic basement which is concealed under 60-100 m depth of cover across...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kalabity. Annual reports to licence expiry/renewal, for the period 25/2/2004 to 24/2/2009.
A large area in the central-eastern Olary Domain surrounding Kalabity Homestead is thought to be prospective for Broken Hill type stratiform Pb-Zn-Ag deposits, Mt Isa - Century style stratiform Zn-Pb deposits, Cloncurry style strata bound Cu- Au...-
Document
Published: 21 Apr 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2005 to 20/4/2010.
An area of shallowly covered Curnamona Province metalliferous basement rocks abutting the South Australia / New South Wales border, approximately 80 km north-east of Olary, is believed to be prospective for Broken Hill and McArthur River style...-
Document
Published: 06 Oct 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : Cutana. Annual reports for the period 10/12/2009 to 9/12/2018.
An area consisting of three separate sub-blocks located ~20 to 35 km north-east of Olary and ~20 km east of Cutana is being explored for possible economic gold as basement shear and vein hosted style deposits, as well as for possible extensions of the...-
Document
-
EL 6484 - Weekeroo area. Annual technical reports and surrender report for the period 17/03/2020 to 12/04/2024.
Exploration Licence 6484 is located approximately 130 km northeast of Peterboroug, north of the Barrier Highway. The tenement covers an area of 195 square-km and is split across two areas. The area is being explored for IOCG type mineralisation...-
Document
Published: 17 May 1924
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-14 - Mingary Station, Broken Hill Domain, Palaeoproterozoic lode style stratabound hydrothermal Au-Cu-Ag prospects. Drilling interim and final reports.
During 2014, Minotaur Exploration successfully applied for a PACE 2015 collaborative drilling subsidy grant to help it undertake drill testing of the inferred extension within its current tenement EL 4844 Mingary of the quartzite lode horizon present...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kalkaroo (part of the Mundi Mundi Plains JV Project). Annual reports for the period 21/4/2010 to 1/6/2018.
During 2010-2011, the sixth year of the subject licence, as part of its continuing search for buried economic Tertiary sediment-hosted roll front style secondary uranium deposits, Marmota conducted the following work: • acquired a 58.6 line km moving...-
Document
Published: 17 Jul 1918
-
Jupiter and Kalkaroo Projects. Final report for geophysical definition studies of the Jupiter prospect magnetotelluric anomaly and the Kalkaroo Dome fault structure, Project ADI RD01-117 [part of Accelerated Discovery Initiative Round 1, 2021].
A new broadband (104 to 0.01 Hz) MT survey array, comprised of four profiles having 1 km site spacing and 5 km line spacing, was used in May-June 2021 for collecting data at 63 sites to build upon two previous models of the electrical resistivity...-
Document
-
Olary area. Progress reports to licence expiry for the period 1/7/1968 to 30/6/1970.
As part of a search for possible concealed stratiform base metal and precious metal deposits in the Olary district, induced polarisation surveys have located several significant anomalies in the Luxemberg mine area. A diamond drilling campaign (5...-
Document
Published: 30 Jun 1970