South Puttapa. Progress and final summary reports for the period 15/7/1970 to 16/7/1971.
Appraisal of the Beltana zinc deposit continued during the current licence period, principally by diamond drilling (6 holes, total 2570 feet) aimed at delineating blind extensions to the main orebody on its southern side. The drilling was very...-
Document
-
Beltana mine and Aroona zinc mine mining leases and retention leases (part of the Flinders Ranges Project). Option period first annual report, for the period 1/1/2000 to 30/12/2000.
During the first year of its evaluation of the Beltana and Aroona mining properties on which it has taken out an option, Perilya undertook the following intensive work programme aimed at locating buried extensions and repetitions of the willemite...-
Document
-
Beltana - Aroona region. Progress reports and technical reports to licence expiry/renewal, for the period 16/7/1971 to 15/7/1972.
Continuing prospect exploration work at the Beltana zinc orebody discovery has consisted of detailed geological mapping at 1:4 800 scale, rock chip sampling of outcropping Adelaidean and Cambrian sediments, field investigation of microgravity...-
Document
-
Special Mining Leases nos 153, 153A and 153B; Mineral Claim nos 5092 and 5350. Summary report for the period 10/7/1967 to 16/7/1971.
This report summarises, in categoric fashion, all of the various exploratory and mine development activities carried out over the past four years on the broader Puttapa area exploration licence (as renewed), and within the mineral claims taken out...-
Document