-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
Botenella Range (now part of the Wilcherry Hill JV Project). Progress, annual and final reports to the commencement of the project licences' combined reporting status, for the period 14/2/1991 to 18/9/2002.
Exploration of an area lying west of Lake Gilles concentrated initially on assessing its potential for hosting syngenetic Palaeoproterozoic stratiform base metal deposits along perceived stratigraphic extensions of the beds containing the recently...-
Document
Published: 16 Oct 1903
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Heartbreak north and south [Talia and Jennet] areas. Progress reports for the periods 30/8/1993 to 29/8/1998, and 26/10/1998 to 25/4/2001.
Archaean to Proterozoic ultramafic igneous intrusions and granite masses associated with the Yarlbrinda Shear Zone, which are interpreted as being potential hosts for gold, nickel, chromium and platinum group elements, were the targets of exploration...-
Document
Published: 03 Nov 1900
-
Lake Gilles (latterly part of the Northern Eyre Peninsula Project). Annual reports until the commencement of project licences' joint reporting, plus the final report, for the respective periods 13/2/2007 to 31/5/2010 and 1/6/2014 to 31/5/2015.
A licence area originally comprising three separate sub-blocks located along the northern and southern sides of the Lake Gilles Conservation Park has been explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 19 Jun 1915
-
Data release [made at SA Director of Mines' discretion] : Deception Hill. First annual report for the period 1/6/2010 to 31/5/2011.
EL 4496 (Deception Hill) is centred approximately 15 km due south of Tarcoola, and extends from west to east for about 60 km. It is regarded by the licensee as being highly prospective for a range of commodities including gold and silver, nickel, iron...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Deception Hill, Lake Everard West, Yellabinna, Cooritta Hill and Lake Everard (the Tunkillia Project). Joint annual reports for the period 1/1/2012 to 31/12/2018.
In 2012, the first year after the project's acquisition, TGL spent A$6.4M on gold exploration and on doing mining feasibility studies. The work program was mainly an ongoing evaluation of development opportunities for the Area 223 gold resource. Some...-
Document
Published: 29 Jan 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Nullarbor, Yalata North and Yalata East (the Western Gawler Craton Project). Joint annual reports for the period 24/10/2012 to 2/4/2018.
A cluster of adjoining licence sub-blocks taken up in the Yalata region are being explored for possible buried Thompson Belt style magmatic copper-nickel mineralisation which could be associated with large strike-slip fault structures transecting the...-
Document
-
ExpNotes GILES: Explanatory Notes GILES
Concealed basement on GILES comprises ?Archaean to Palaeoproterozoic metamorphic rocks belonging to the Nawa Subdomain of the Gawler Craton. These are intruded by Mesoproterozoic Hiltaba Suite granitic bodies and Mesoproterozoic or Neoproterozoic...-
Document
-
Yalymboo, Dingo Hill and Black Oak Hill (the Cariewerloo Project). Joint annual reports and separate final reports to licence's respective expiry/full surrender, for the period 5/6/2006 to 20/6/2009.
Possible Mesoproterozoic unconformity-related uranium deposits within the Cariewerloo Basin, involving an inferred structural preparation component whereby basic intrusive members of the Gairdner Dyke Swarm cut across this unconformity in a manner...-
Document
Published: 19 Nov 1909
-
Yalanda East (part of the Eyre Peninsula JV Project). Annual reports and final report to licence surrender, for the period 22/10/2009 to 7/5/2014.
A small licence area composed of three separate sub-blocks, which is centred approximately 80 km south-west of Whyalla, has been explored for possible economic buried base metal and/or gold and/or uranium mineralisation that may have formed in...-
Document
Published: 30 Jul 1914
-
Whiting. First partial surrender report for the period 15/2/2010 to 14/2/2013.
In the vicinity of Weetulta on northern Yorke Peninsula, as part of Minotaur's recent exploration for possible economic buried Moonta or Cloncurry-style IOCG - related base metal massive sulphide mineralisation, 60 line km of airborne VTEM survey data...-
Document
Published: 12 Aug 1913
-
Whiting. Annual reports to licence expiry/full surrender, for the period 15/2/2010 to 14/2/2014.
A number of small, disjoint parcels of available exploration ground in the Moonta-Wallaroo district were taken up by Minotaur early in 2010 to assess their basement IOCG mineralisation potential. A preliminary review done by Minotaur of historic...-
Document
Published: 21 Mar 1914
-
Parndana, Middle River and Yerda (part of the Kangaroo Island Project). Joint annual reports, plus EL 4581 third partial surrender report, to licences' joint full surrender, for the period 19/10/2012 to 18/10/2015.
Monax Mining has being exploring since May 2005 along a 40 km stretch of the hinterland to the central-northern coast of Kangaroo Island, searching mainly for possible economic gold, silver and Mississippi Valley type base metal sulphide...-
Document
Published: 09 Mar 1916
-
Data release - as updated [made at SA Director of Mines' discretion] : Glenloth area (the Tarcoola JV Project). Annual reports for the period 11/7/2008 to 2/11/2018.
A biogeochemical sampling survey consisting of 20 lines (407 samples) was undertaken by the JV partners during August 2009, targeting buried gold mineralisation. Black Oak and Pearl Bluebush were the dominant deep-rooted plant species sampled and, to...-
Document
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 1917