-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
South Vivian [Homestead]. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2007 to 11/6/2009.
An area located on the northern Stuart Shelf between Olympic Dam and Prominent Hill, approx. 50 km south-southwest of the latter, has been explored for possible Olympic Dam type iron oxide - associated copper-gold (IOCG) deposits and for Canadian...-
Document
Published: 17 Oct 1909
-
Weetulta. Fourth partial surrender report for the period 16/9/2005 to 15/9/2009.
Exploration addressing a new style of copper-nickel-cobalt-rare earth element mineralisation has been conducted in part of the Copper Triangle region of northern Yorke Peninsula, where reported historical drilling had encountered such mineralisation...-
Document
Published: 20 Oct 1909
-
Port Broughton, Redhill and Mount Remarkable - Port Augusta areas (part of the Moonta North Project ELs combined reporting group). Annual reports and joint final report at licences' surrender, for the period 19/4/2002 to 22/5/2006.
Economic deposits of iron-oxide associated copper-gold mineralisation of the Moonta-Wallaroo or Olympic Dam style, hosted in Palaeoproterozoic basement rocks of the Moonta Sub-domain, were targeted by exploration in three now surrendered licences,...-
Document
-
Moonta - Wallaroo area. Second partial surrender report, for the period 10/1/2002 to 11/4/2009.
Work completed within the three now relinquished small portions of this licence (total 6.16%) has included regional and semi-detailed calcrete sampling (56 samples taken at 1 km spacing, plus 111 infill samples taken on 400 m grid centres), parts of...-
Document
-
Roxby Hill. Annual and final reports to licence surrender for the period 6/2/2006 to 13/11/2008.
In a search for possible economic iron oxide - associated copper-gold mineralisation buried under deep cover to the south-west of the Olympic Dam deposit, a semi-detailed gravity survey consisting of 302 stations was read at 800 m intervals on 1.6 km...-
Document
Published: 09 Mar 1909
-
Codna Hill, Pumper Dam, Welcome Bore and Beresford Hill (part of Curdimurka Project). Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 20/8/2007 to 26/8/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
Published: 28 Jan 1909
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 1 partnership no. DPY1-12, Chianti mineral prospect. Project final report.
The subject report describes the results of drilling two fully cored rotary holes totalling 1161.10 m at the Chianti prospect, an unusually-shaped residual gravity anomaly located in Gunson Resources' EL 3264, 20 km north-east of the Mount Gunson...-
Document
-
The Neales River Project. Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 17/5/2007 to 16/5/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
-
Point Lowly. Information status at licence surrender, for the period 13/1/2004 to 24/11/2004 : no work performed.
There is no abstract created for this record-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-19, Murninnie mine area (north-eastern Spencer Domain) IOCG mineral prospects. Project final report.
The Murninnie Cu-Bi-Au deposit and mine environs, located approximately 40 km south-west of Whyalla, have not been seriously explored in more than 50 years due to quarantining of the deposit under Private Mine title. The lode-style deposit is exposed...-
Document
-
Bopeechee, Cadnia Hill, Hedley Hill, Andamooka, Stuart Creek and Ferguson Hill (Lake Torrens Project). Third partial surrender report for the period 16/11/2000 to 31/12/2004.
Exploration for possible intra-basement iron oxide - associated copper-gold-uranium deposits and for stratabound Mississippi Valley style base metal deposits within the regolith on the now relinquished portions of the project's combined exploration...-
Document
Published: 20 Mar 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-56, northern Olympic Domain: Sloane Hill silver and IOCG mineral prospect. Project final report.
A PACE Initiative Year 4 subsidised drilling project carried out on Mount Eba Station, in an area located approximately 30 km south of the Prominent Hill mine, initially targeted a wide above background silver geochemical anomaly returned by sampling...-
Document
Published: 18 Dec 1907
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Mount Paisley (part of the Mount Woods Project). Fourth partial surrender report for the period 23/3/2000 to 8/8/2009.
Exploration Licence 3387 (Mt Paisley) is located about 110 km north-west of Woomera, 110 km west-northwest of Olympic Dam, and 45 km south-east of Prominent Hill. The EL lies within the Woomera Prohibited Area (WPA), and most of the tenement covers...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Mullaquana. Annual reports for the period 20/11/2006 to 19/11/2009.
A tenement area located close to and along the eastern seaboard of the Eyre Peninsula, and which extends from Whyalla southwards for approximately 60 km, has been taken up to explore for possible economic buried primary, hard rock hosted uranium and...-
Document
Published: 20 Jun 1910
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-14 - Monax Mining Ltd Punt Hill Project, IOCG-prospective Camel Dam prospect gravity anomaly. Drilling project final report.
Monax Mining's Punt Hill Project, comprising EL4642 (Punt Hill) and EL 4548 (Yeltacowie), is located within the Olympic iron oxide - associated copper-gold (IOCG) Province on the eastern margin of the Gawler Craton, South Australia. This has a highly...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Woocalla (part of the Mount Gunson Project). Annual reports to licence expiry/renewal, for the period 13/10/2000 to 12/10/2005.
The Woocalla licence area is continuing to be explored for buried Neoproterozoic stratiform copper mineralisation of the various styles known to be present near Mount Gunson, whilst in addition, the underlying Mesoproterozoic basement is regarded as...-
Document