Bundulla. Progress reports for the period 24/5/79 to 19/10/82.
Airborne and ground magnetic surveys were conducted in the Bundulla area of the Nullarbor Plain (SA), prior to drilling a prominent circular aeromagnetic feature. 2 percussion/rotary mud holes, each drilled to TD 369.5 m, penetrated crystalline...-
Document
-
RB 84/00013 Wilgena 1. Well completion report.
Wilgena 1 (TD 973 m) penetrated 964 m into Tarcoola Formation within the Wilgena Sub-basin, without encountering magnetic basement. Thin dacitic to basaltic tuffs and basaltic flows, interbedded with carbonaceous siltstones, indicate contemporaneous...-
Document
Published: 01 Mar 1984
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Cambrian source rock geochemistry, Stansbury Basin, part 1. Preliminary evaluation of Mount McDonnell Formation in coastal exposures on northern Kangaroo Island.
17 samples of Early Cambrian Mount McDonnell Formation shallow marine mudstone outcropping on the northern coastline of Kangaroo Island near Hummocky Point were analysed geochemically to determine their source rock richness and thermal maturity, and...-
Document
-
Galaxy Tank (part of the Central Gawler Project). Annual reports to licence expiry/full surrender, for the period 22/3/2006 to 10/5/2013.
Tasman Resources' ("Tasman") Central Gawler Project tenement acreage, originally comprising seven exploration licences ELs 3339 to 3345, was initially applied for on the basis of perceived prospectivity for diamonds: however, following Tasman's...-
Document
Published: 16 Jul 1913
-
Muckanippie, Garford, Commonwealth Hill and Mulgathing Hill (part of the Central Gawler Project). Joint annual reports to licences' expiry/full surrender, for the period 20/5/2005 to 19/5/2010.
Tasman Resources' Central Gawler Project acreage, originally comprising seven exploration licences ELs 3339 to 3345, was initially applied for on the basis of perceived prospectivity for diamonds, however, further potential for discovering buried...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 1918
-
Mullaquana. Progress reports and final report to licence expiry/full surrender, for the period 8/12/1980 to 7/12/1982.
The target was lignite or oil shale hosted by Tertiary sediments possibly preserved on top of a series of tilted fault blocks bordering the western shoreline of Spencer Gulf, due south-west of Whyalla. 29 vertical rotary mud drillholes (total 2729...-
Document