-
RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-05 - Mount Sarah Project, Oodnadatta district, Proterozoic basement inferred epithermal/hydrothermal IOCG mineral prospect. Drilling final report.
A small licence area centred approximately 70 km north-northwest of Oodnadatta is being explored for possible economic buried IOCG type mineralisation that may have formed in the wholly concealed, almost unknown basement rocks there. Interest is...-
Document
Published: 28 Sep 1917
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-24 - Nankivel Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources Limited (IVR) is continuing to explore its contiguous tenement package in the Southern Gawler Ranges for economic precious and base metals, following its discovery of the Paris silver deposit in 2011. A prospective region called...-
Document
Published: 20 Jun 1917
-
RB 2014/00005 WINTINNA, South Australia, [geological map] sheet SG53-14. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The WINTINNA 1:250 000 mapsheet area lies between latitudes 27° to 28° South and longitudes 133°30’ to 135°00’ East. This ~16 400 square km area includes the Marla and Cadney Park settlements, and is crossed by the Stuart Highway and Adelaide to...-
Document
Published: 01 Mar 2015
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
RB 2022/00010 Multi-isotopic apatite and zircon SHRIMP U–Pb geochronological results from the central-western Gawler Craton.
This report presents the results from multi-isotopic apatite and zircon SHRIMP U–Pb geochronology on thirteen samples from the central-western Gawler Craton. Eleven drill core samples are interpreted ultramafic to mafic intrusive rocks, with most...-
Document
Published: 01 Sep 2023
-
ExpNotes COOBER PEDY: Explanatory Notes COOBER PEDY
There is no abstract created for this record-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
RB 2011/00003 PACE Geochronology: Results of collaborative geochronology projects [performed during] 2009-2010.
This report book presents the results of seven geochronology research projects completed during 2009 and 2010 as a new part of the ongoing PACE Initiative geoscientific data gathering activity underwritten by the South Australian Government. It has...-
Document
Published: 01 Apr 2011
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017