-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
RB 2001/00004 CHILDARA bedrock drilling program.
Fifty-eight shallow aircore holes totalling 2140.5 m were drilled by PIRSA's Mineral Resources Group in the Ceduna area during November 1999 to as part of a programme designed to assist regional mapping and geological interpretation of the CHILDARA...-
Document
Published: 01 Aug 2001
-
RB 2016/00025 Geology of the Peltabinna 1:75 000 Special Edition Map Sheet.
The Peltabinna 1:75 000 Map Sheet was produced as part of a mapping program integrated into the Mineral Systems Drilling Program (MSDP) along the southern margin of the Gawler Ranges. The objective of the mapping program was to provide a regional...-
Document
Published: 01 Sep 2017
-
Insights into tectonic evolution of the western Gawler Craton - Childara bedrock drilling.
The understanding of the tectonic evolution of the western Gawler Craton has been greatly enhanced by recent drilling in an area of poor basement exposure. Fifty-eight air-core holes (totalling 2140.5 m) were completed near Ceduna on the CHILDARA...-
Document
-
RB 2019/00013 Gawler Craton Airborne Geophysical Survey Region 4B, Fowler – Enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Jul 2019
- ZIP
-
RB 2020/00026 PACE Copper Gawler Craton Airborne Survey, Region 6, Gairdner - enhanced geophysical imagery and magnetic source depth models
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Oct 2020
- ZIP,
-
PACE Copper Gawler Craton Airborne Survey, Region 4B, data package.
During the period 19 January to 12 May 2017, near-coast onshore parts of the NULLARBOR and FOWLER 1:250k map sheet areas were flown under contract to the SA Government and Geoscience Australia as part of the PACE Copper Gawler Craton Airborne Survey....-
Dataset
- ZIP,
-
PACE Copper Gawler Craton Airborne Survey, Region 5, data package.
During fine weather intervals within the period 21 June to 30 September 2018, the southern half of the CHILDARA 1:250k map sheet area and the onshore two-thirds of the STREAKY BAY 1:250k map sheet area were flown under contract to the SA Government...-
Dataset
- PDF,
- ZIP
-
RB 2020/00020 Gawler Craton Airborne Geophysical Survey Region 5, Streaky Bay – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study jointly conducted by the Geological Survey of South Australia and CSIRO Mineral Resources which aimed to enhance the expression of geological structure in geophysical images and to derive depth to magnetic...-
Document
Published: 01 Aug 2020
- ZIP,
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
RB 2015/00029 What lies beneath the western Gawler Craton? [Eucla-Gawler Seismic Survey line] 13GA-EG1E Seismic and Magnetotelluric Workshop 2015. Extended abstracts [of technical presentations].
This compilation of written and associated oral papers that were presented for the “What lies beneath the western Gawler Craton? 13GA-EG1E Seismic and Magnetotelluric Workshop 2015” is an important step in building our geological understanding of one...-
Document
Published: 01 Dec 2015
-
RB 2022/00008 Zircon LA–ICP–MS geochronological and geochemical results from the central-western Gawler Craton.
This report presents the results from zircon LA–ICP–MS U–Pb geochronological age determinations, and both trace and rare earth element abundance geochemical analyses, performed on fifteen outcrop and drill core samples originating from the...-
Document
Published: 01 Nov 2022
-
RB 90/00059 Palaeoproterozoic St Peter Suite of the western Gawler Craton.
A suite of intrusives (St Peter Suite - new name) along western Eyre Peninsula displays a wide range in composition, texture and relationships. The features are typical for mingling and mixing of felsic and mafic magmas, with U-Pb geochronology...-
Document
Published: 01 Oct 1990
-
RB 90/00060 Palaeoproterozoic Nuyts Volcanics of the western Gawler Craton.
U-Pb zircon geochronology of the Nuyts Volcanics yielded an age of 1627 +/- 2 Ma, supporting a previous dating of 1631 +/- 3 Ma. The major and trace element compositions, as well as the presence of a tectonic fabric, suggest that the Nuyts Volcanics...-
Document
Published: 01 Oct 1990
-
RB 2007/00008 CHILDARA, South Australia, [geological map] sheet SH53-14. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The CHILDARA 1:250 000 map area is located on the western Gawler Craton, an ancient crystalline shield comprising Archaean, Palaeoproterozoic and Mesoproterozoic metasediments, volcanics and granites that has been tectonically stable since 1450 Ma...-
Document
Published: 01 May 2007
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 2009
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 2019