-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
RB 45/00118 Final report on iron ore prospecting, Corunna area, Iron Knob district.
In an area of limited basement outcrop located between 2 and 5 miles north-northwest of Iron Knob township, the Department's surface traverse channel sampling (969'), percussion boring (643’) and diamond drilling (1270’) tested a low grade...-
Document
Published: 04 Dec 1957
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Woordlemmie (aka the Mount Gunson South Project). First partial surrender report, for the period 22/6/2011 to 21/6/2018.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings is being explored for possible buried economic base metal deposits that may exist in a variety of geological settings and...-
Document
-
Data release - as updated : Woordlemmie. Annual reports to licence full surrender, for the period 22/6/2011 to 22/11/2019.
An area situated a short distance to the east and south-east of CSR's historic Mount Gunson open cut copper workings, covering ground adjacent to the south-western and southern margins of Pernatty Lagoon, has been explored for possible buried economic...-
Document
Published: 26 Nov 1919
-
Data release [made at SA Director of Mines' discretion] : Mount Gunson (part of the Mount Gunson Project). Annual reports for the period 15/7/1994 to 17/10/2008 [ Index Part 3 of 4 ].
During the eighth year of tenure, work done on EL 2639 included: - the conduct of infill ground gravity and CSAMT surveys; - geophysical modelling and interpretation of the new survey data; - geological interpretation and refinement of drilling...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Morgans (part of the East Eyre Peninsula Project). Annual reports for the period 17/1/2012 to 16/1/2019.
An area of mainly covered bedrock consisting of two separate sub-blocks bordering the south-eastern Gawler Ranges, which is considered prospective for finding buried hypogene IOCG mineralisation and possible stratiform and metamorphic base metals in a...-
Document
Published: 21 Mar 1918
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Kielpa. Progress reports for the period 1/11/1967 to 30/4/1968.
An occurrence of massive to gossanous secondary manganese and iron oxides, which is apparently stratabound within Lower Proterozoic graphitic schists and gneiss in an area 8 miles east-northeast of Darke Peake railway siding on Eyre Peninsula, was...-
Document
Published: 23 May 1969
-
Pinerow. Annual and final reports to licence expiry/full surrender for the period 2/10/2004 to 9/11/2008.
To continue the assessment of the dimension stone and ornamental stone potential of granitic basement outcrops present on EL 2851, a 5-year Retention Lease, RL 116, was taken out on 7/2/2006 to cover 5.9 ha of the Middle Camp granite pluton. Several...-
Document
Published: 08 Jan 1909
-
Middleback Range, SA. SMLs 204 and 205 1969 geochemical survey report.
Two separate orientation geochemical sampling programmes have been undertaken during 1969 over BHP's Special Mining Lease areas near Whyalla. In the Pandurra Station area, shallow residual soils over known mineralised Carpentarian bedrock were...-
Document
-
Lake Macfarlane - Lake Finniss area. Progress reports to licence expiry/full surrender, for the period 1/7/1967 to 31/12/1967.
Consultants were engaged by the licensee to conduct an extensive geological and geochemical investigation of a 2700 square mile area surrounding the Mount Gunson copper deposit, and to perform an interpretation of available regional aeromagnetic data....-
Document
-
ExpNotes WHYALLA: Explanatory Notes WHYALLA
There is no abstract created for this record-
Document