-
Annual report on exploration activities, Mount Neill and Mount Fitton areas, EL 871, 1982.
A reassessment of Marathon Petroleum's 1979 regional stream sediment sampling programme led to the decision to resample a number of areas within EL 871. The Mt Neill and Mt Fitton areas were chosen, as a result of possible similarities with the...-
Document
-
Report on the Shamrock uranium prospect.
Uranium mineralisation was first discovered at the old Shamrock Copper Mine during a systematic search of old mine dumps by the South Australian Department of Mines in 1955. Follow-up investigations located a small high-grade uranium lode (Valley...-
Document
-
Emu Hill. Progress and annual reports plus final report to licence expiry/full surrender, for the period 22/4/1991 to 21/4/1996.
Diamond exploration undertaken north-west of Moolawatana included the acquisition of airborne magnetic / radiometric and ground magnetic surveys, plus soil, stream sediment, gravel, loam and rock chip sampling, and aircore/diamond drilling (25 holes,...-
Document
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
SADME/Amdel Project 1/1/209 : [petrographic] comparison of some Archaean and Proterozoic iron formations in SA. Progress reports 1 to 4, for the period December 1977 to July 1979.
A project to compare Gawler Craton iron formations of unknown age with those of known Archaean age (from geochronology) and with the Proterozoic, Lake Superior - type Middleback Range iron deposits has concentrated on characterising each formation by...-
Document
Published: 30 Jul 1979
-
RB 2007/00015 Geochronology of the Gawler Craton, South Australia.
Geochronology enables us to determine the age of rocks and minerals. The variety of isotopic geochronological techniques give complementary information on, for example, the timing of igneous or metamorphic crystallisation, as is often the case for the...-
Document
Published: 01 Sep 2007
-
Yudnamutana Hill. Progress reports and annual reports to licence expiry/full surrender, for the period 20/5/1980 to 15/2/1995.
Base metal and gold exploration undertaken over a lengthy period since 1980 in the Yudnamutana Hill area, 20 km north-west of Arkaroola, has comprised detailed geological mapping of major basement and cover stratigraphic units and known mineral...-
Document
-
Mount Woods. Combined first progress/final report at licence full surrender, for the period 6/9/1979 to 5/12/1979.
Following an evaluation of existing subsurface data, 9 vertical percussion holes totalling 670 m were drilled to test discrete gravity anomalies in the Mount Woods area, in a search for Olympic Dam type mineralisation. The holes encountered...-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017