-
Coffin Bay (originally part of the Wanilla JV Project). Annual reports plus final report to licence expiry/full surrender, for the period 3/3/2005 to 2/3/2010.
A tenement in the Coulta district of south-western Eyre Peninsula has lately been explored by International Metals, after its prior research had outlined seven areas there as being of prime interest in a search for Archaean greenstone units which...-
Document
Published: 20 May 1910
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Kapinnie (part of the Brimpton Lake Project). Annual reports for the period 17/9/2003 to 4/3/2010.
An area extending to the north of Kapinnie on western Eyre Peninsula area is being explored by grant licensee Anglo American and (since March 2003) its joint venture partner Lynch Mining, looking for possible buried economic Archaean volcanic or...-
Document
-
Kimba. Third partial surrender report submitted at licence expiry/renewal, for the period 6/11/2006 to 5/11/2016.
63 square km or 23% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
-
Kimba. Second partial surrender report, for the period 6/11/2006 to 5/11/2015.
112.3 square km or 29% of the former area of EL 4938, in two separate blocks, has recently been relinquished due to a lack of encouraging results, and difficulty with land access onto certain private properties located therein due to some farmers’...-
Document
Published: 07 Dec 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Brimpton Lake. Annual reports for the period 9/2/2005 to 8/8/2018.
An area of the southern Gawler Craton, which is located on Eyre Peninsula east of Elliston, is continuing to be explored for possible economic buried Archaean to Proterozoic bedrock-hosted primary base and precious metal deposits of inferred...-
Document
-
Wilcherry Hill. Drilling at the Weednanna Au-Fe deposit, an exploration model for gold deposits formed in the southern Gawler Craton. Collaborative drilling and research final report, Project ADI RD02-265 [Accelerated Discovery Initiative Round 2, 2022].
Between 8 August and 6 October 2021, six inclined, rotary mud precollared diamond cored holes (21WDDH001 to 006) totalling 1560.6 m were drilled at the Weednanna gold and iron deposit located ~40 km north of Kimba on northern Eyre Peninsula, as part...-
Document
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 2 of 2].
The Telephone Dam lead-zinc-silver prospect is located in the north-eastern part of the now renewed Wilcherry Hill EL 4162. During the 1980s and 1990s, diamond, RC and RAB drilling done on this prospect by Aberfoyle Resources had identified a...-
Document
Published: 31 Dec 1908
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 1908
-
Mount Hope, Moorlands and Brimpton Lake (the Mount Hope Project). Joint annual reports and joint final report to licences' respective expiry/full surrender, for the period 24/5/2005 to 4/6/2010.
Monax Mining has been exploring the subsurface geology of three licences in the Mount Hope region of south-western Eyre Peninsula, seeking possible economic komatiite - hosted nickel deposits and also any felsic volcanic sediment - hosted massive...-
Document
Published: 27 Oct 1910
-
Karanda. First annual report plus final report to licence expiry/full surrender, for the period 13/6/2013 to 12/6/2015.
A small area centred ~50 km west-southwest of Kimba has been explored for possible buried base metal mineralisation, including BIF type iron ore, and also for gold and perhaps palaeochannel style uranium, that may have formed within or close to...-
Document
Published: 12 Aug 1915
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-52, Oakdale Project area Archaean VHMS mineral prospects. Project final report.
Five rotary precollared, NQ2 diamond drillholes were completed as a PACE Year 4 subsidised drilling project (DPY4-52) between January 2007 and June 2007, during a regional diamond drilling programme on the licensee's ELs (involving overall ~ 6000 m of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-24, Greenly Project nickel and base metals mineral prospects. Project final report.
A high-resolution 100 m line spaced aeromagnetic/radiometric survey conducted in October 2006 by UTS Geophysics for InterMet Resources over its EL 3314, located immediately north of Coffin Bay, revealed prominent N-S trending linear magnetic features...-
Document