-
2008 Limestone Coast Geothermal Project. Technical Work Progress Post Scopenergy Prospectus (GELs 170,171, 172 & 173). Thermal conductivity and geothermal assessments (GEL 170 ).
Technical Work Progress Post Scopenergy Prospectus Graeme Beardsmore and Steven Sewell March 2008: In December 2005, Scopenergy Pty Ltd produced a Prospectus as part of a proposed listing on the Australian Stock Exchange. This included a detailed...-
Document
-
2014 PEL629 Otway Basin 2D Seismic Reprocessing.
in 2014, Ouro Preto Pty Ltd engaged the services of Dayboro Geophysical to undertake seismic reprocessing in tenement PEL629. In total 60 lines comprising some 1060 line km’s were reprocessed. The lines reprocessed were selected on the basis of their...-
Document
Published: 01 Jan 2014
-
Exploration opportunities, Otway Basin, South Australia.
Four areas (OT95-A to D) located in the South Australian sector of the onshore Otway Basin, are available for application until 30/6/95 as Petroleum Exploration Licences. The areas range in size from 255 sq km to 2 023 sq km, and seismic line...-
Document
-
Gambier Basin investigation.
There is no abstract created for this record-
Document
Published: 01 Jan 1966
-
Petroleum geochemistry of the Otway Basin, and the significance of coastal bitumen strandings on adjacent southern Australian beaches. Volumes 1 to 5 source rock studies.
The standing of crude oil on the beaches of southern Australia was first recorded approximately 150 years ago. This material, known locally as coastal bitumen, was used by the early maritime visitors and settlers to caulk their vessels and is the...-
Document
-
RB 58/00106 Report on reconnaissance seismic refraction surveys, Naracoorte to Paruna and Kingston to Meningie.
The purpose of this report is to present the results of a number of short, reconnaissance, seismic refraction lines shot in 1961 and 1963 between the Gambier and Murray Basins and northward into the latter. One series of lines was shot in 1961 between...-
Document
Published: 01 May 1964
-
RB 77/00080 Kalangadoo town water supply. Well completion report, Kalangadoo TWS no. 1 (MA 94).
Kalangdoo Town Water Supply (T.W.S.) No. 1 well was drilled cable tool during February - May, 1977, and subsequently production tested. The unconfined Gambier Limestone aquifer was encountered between 5.5 and 86m, and was later cemented off down to...-
Document
Published: 01 Jan 1977
-
RB 80/00053 Resistivity survey at Mil Lel, Mount Gambier, December 1979.
Schlumberger vertical electrical soundings have indicated that a plume of pollution within the shallow unconfined aquifer extends SW from the Kraft cheese factory for 1 600 metres. The plume is ovoid in shape and up to 650 metres wide. The polluted...-
Document
Published: 01 May 1980
-
RB 81/00093 South-East water resources. Coonawarra groundwater investigation, progress report no. 1.
Coonawarra is important viticultural area. Its establishment was possible because of low salinity groundwater and suitable soil. Since 1970 groundwater levels have shown no significant decline due to irrigation and no increase in salinity. A pollution...-
Document
Published: 01 Jan 1981
-
RB 82/00049 Kongorong resistivity survey.
A resistivity survey carried out at Kongorong, eighteen kilometres southwest of Mount Gambier has been used to trace groundwater pollution arising from an abandoned cheese factory. The high resistivity zone north of the old factory would appear to be...-
Document
Published: 01 Jul 1982
-
RB 86/00077 Review of the structure, geology and hydrocarbon potential of the Otway Basin in South Australia.
Highlights of the above 4 parts of the report include: 1) A brief review of the Palaeozoic, Mesozoic and Cainozoic tectonic history. 2) The limited amount of useable seismic, aeromagnetic and gravity data hampers structural definition of the basin....-
Document
Published: 01 Oct 1986
-
RB 83/00025 Beachport town water supply, well no. 4 completion report.
Well drilled to 363 metres to the Dilwyn Formation confined aquifer system and completed as production well.-
Document
Published: 01 Apr 1983
-
RB 85/00034 Otway Basin regional magnetic potential field study.
Based on compilation of basement depth interpretations from previous aerial magnetic surveys.-
Document
Published: 01 Jul 1985
-
RB 78/00034 Mount Gambier town water supply - Completion report for well no. 8.
Water well was drilled to 250 metres into the confined aquifer Dilwyn Formation.-
Document
Published: 01 Jan 1978
-
RB 86/00047 Honeysuckle Flat (Caroline) limestone deposit, sections 538, 539, Hundred Caroline, County Grey.
Geological mapping and drilling have proved 2 100 000 tonnes of high purity limestone. Large additional reserves are available to the south. The deposit is required to supplement depleted reserves in existing Marte quarry. The Gambier Limestone is...-
Document
Published: 01 Jul 1986
-
RB 86/00009 Seismic study of the Otway Basin, South Australia.
An interpretation of all seismic data in SA part of the Otway Basin is part of a joint geological and geophysical study with the Victorian and Tasmanian Department of Mines and the BMR to produce a basin - wide interpretation. The geometry and...-
Document
Published: 01 Apr 1986
-
RB 86/00010 Geophysics experiments over an anomalous depression - Mount Gambier - SA Housing Trust.
Geophysical surveys at the City Council Depot site, delineated the extent of large depression, used as rubbish dump. Abrupt lateral terminations of volcanic ash and tuff sequence were correlated with the boundary of the depression. No solution...-
Document
Published: 01 Apr 1986
-
RB 84/00084 Kongorong groundwater pollution investigation.
An SA government investigation has been undertaken to determine the extent of groundwater pollution resulting from the waste disposal practices used at the now abandoned Kongorong cheese factory. During the period 1924 to 1971, liquid effluent from...-
Document
Published: 01 Oct 1984
-
RB 88/00002 Review of Gambier Limestone - Geology, uses, specifications and production.
The Marte area, 10 km west of Mount Gambier is the largest producer of building stone in Australia. Reviews production of ashlars from Gambier Limestone with emphasis on the Mount Gambier area; coverage is incomplete for production of ashlars from the...-
Document
Published: 01 Jan 1988
-
RB 78/00009 EWS Department - Mount Gambier town water supply standby well no. 7.
The first of a series of high yielding standby wells exploring the confined aquifer was drilled to 208 metres using both rotary and cable tool. Production interval is from 184.6 to 205.3 metres in unconsolidated sands of Dilwyn Formation.-
Document
Published: 01 Jan 1978