Alberga. Final relinquishment report for the period 24/9/1973 to March 1974.
Results of water bore sampling (7 samples) and drilling of 6 holes totalling 614 metres were disappointing. The drill holes intersected Adelaidean and Cretaceous sediments underlying Tertiary ? - Quaternary fluviatile sediments, without encountering...-
Document
-
Yarramba. Progress reports to licence expiry/renewal, for the period 13/5/1971 to 12/5/1972.
Continuing intensive exploration for economic sedimentary uranium deposits within buried Tertiary palaeochannel sediments in the Yarramba Homestead area, 50 km north-west of Cockburn, which had been invigorated by the recent discovery of strongly...-
Document
-
South Eagle [part of a joint licence area with Kalabity]. Uranium exploration progress and technical reports to licence expiry/renewal, for the period 15/5/1974 to 14/2/1976.
During the EL 132 tenure, work has consisted of a mineability evaluation of the Honeymoon uranium deposit, plus additional U exploration over the South Eagle farmout. Initially, 5 rotary holes (total 594.9 m) were drilled to the north of the...-
Document
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Millers Creek Homestead. Progress reports and final report to licence expiry/full surrender, for the period 13/3/1980 to 28/3/1986.
Following a review of existing regional geophysical and geological data for the north-western Stuart Shelf, grid-based gravity and ground magnetic surveys were run to further outline two broad gravity highs associated with discrete magnetic anomalies,...-
Document
-
Ungalootanna Hill (part of the Musgrave Project). Annual and final reports to licence surrender, for the period 24/9/1997 to 1/10/2008.
Exploration of an area in the eastern Musgrave Ranges located 70 km north-east of Marla, 10 km south of Mount Irwin Homestead, and 22 km east of the Stuart Highway, has sought to find possible Giles Complex - hosted magmatic nickel sulphide and...-
Document
Published: 26 Jun 1908
-
Mundowdna, Wilpoorinna and Dalarinna Hill (part of the Marree Project). Combined final report at licences' joint surrender, for the period 21/6/2006 to 20/3/2009.
Three areas located along the southern margin of the Eromanga Basin, east and south-east of Marree and adjacent to the Strzelecki Track, have been explored for possible economic sedimentary uranium accumulations in porous Mesozoic sandstones, as it...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-15, Peake and Denison Inliers western flank Mesozoic sedimentary uranium mineral prospects. Project final report.
Approved PACE Initiative Year 3 drilling proposal DPY3-15 aimed to discover a roll-front style uranium deposit hosted in Mesozoic sandstones flanking the exposed radiogenic Peake and Denison Inliers, that is amenable to mining by in-situ leach...-
Document
Published: 13 Apr 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-29, Mount Woods area sandstone-hosted uranium mineral prospects. Project final report.
As part of the PACE Initiative Year 3 collaborative drilling projects between PIRSA and the minerals industry, Goldstream carried out an approved programme of reverse circulation drilling on its Mount Woods area exploration tenements, into selected...-
Document
Published: 18 Dec 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-07 - northern Gawler Craton - Welbourn Hill and Nicholson Hill magnetic/gravity anomalies IOCG-U mineral prospects. Project final report.
As part of a search for possible high crustal level, Olympic Dam - type IOCG deposits hosted by Mesoproterozoic basement rocks, Eromanga Uranium undertook deep diamond drill testing of two large, semi-coincident magnetic/gravity anomalies recognised...-
Document
-
Peake Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 70 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Edward Creek. Annual reports and final report to licence expiry/full surrender, for the period 16/9/2005 to 15/9/2009.
An area located immediately west of the Denison Inlier of the Proterozoic Peake and Denison Ranges, approximately 90 km south-east of Oodnadatta, was explored for possible roll-front style sedimentary uranium deposits that may have formed within...-
Document
Published: 20 Oct 1909
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 1910
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ethiudna. Annual reports to licence expiry/renewal, for the period 22/2/2004 to 22/2/2015.
An area centred ~50 km north-west of Olary is continuing to be explored for possible buried economic Prominent Hill or Olympic Dam type iron oxide associated copper-gold (IOCG) breccia style mineralisation. The area is considered highly prospective...-
Document
-
ELs 4678 - 4689 (the Oodnadatta Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 22/2/2011 to 9/9/2014.
The Oodnadatta Project consisted originally of twelve exploration licenses covering 7125 square km in far northern South Australia, this mainly being ground situated to the south and south-east of Oodnadatta. Uranium Equities Limited (UEQ) believed...-
Document
Published: 28 Oct 1914
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
ELs 4653 - 4661 (the Marla Project). Joint annual reports, plus final reports at licences' individual or joint full surrenders, for the period 25/1/2011 to 9/9/2014.
Nine licence areas occupying a 70 km x 30 km region overlying a west-northwest trending structural corridor situated along the northern margin of the Gawler Craton, have been explored for possible buried large-scale deposits of iron oxide - associated...-
Document
Published: 23 Oct 1914