-
Glenloth Well. Progress reports and final report to licence expiry/full surrender, for the period 30/3/1973 to 29/3/1974.
Two inclined percussion holes were drilled at the Mount Mitchell tin prospect for a total penetration of 504 feet. The aim was to test a discrepancy between subsurface sample negative tin assay results obtained by the Department of Mines, and good...-
Document
Published: 21 Feb 1974
-
RB 90/00078 South Australia - Exploration Towards 2000. Seminar, Adelaide, 13 December, 1990. Extended abstracts.
A seminar designed to heighten industry interest in South Australia as a place in which to search for minerals and petroleum was organised by the Department of Mines and Energy at the Australian Mineral Foundation on 13 December 1990. A number of data...-
Document
Published: 01 Dec 1990
-
Nuckulla Hill. Annual and final reports to licence expiry/full surrender for the period 12/7/2004 to 11/7/2009.
As part of a search for possible Tunkillia type structurally-controlled buried gold deposits within an area located approximately 120 km north-east of Ceduna, licensee Southern Gold targeted geochemical and geophysical anomalies that had previously...-
Document
Published: 27 Oct 1909
-
Lake Labyrinth (part of the Gawler Joint Venture Project). Data release made at the surrender of a subsequently renewed licence (EL 3252) : annual reports for the period 27/7/1994 to 26/7/1999.
Exploration for possible economic buried magmatic/epithermal/hydrothermal/metamorphic gold and copper deposits, which may have formed within Archaean and Proterozoic basement rocks in an area located approximately 24 km north-west of Kingoonya,...-
Document
-
Bopeechee. Final report at licence expiry/full surrender, for the period 16/11/2000 to 27/7/2008.
In on-ground exploration of an area on the Stuart Shelf located 18-46 km north-east of Olympic Dam, possible economic sedex - style, Mount Isa / Nifty type stratabound copper was targeted within Neoproterozoic carbonate rocks as part of multiple...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Commonwealth Hill, Perfection Well, Wirrida North, Nelson Bore and Ingomar (the Commonwealth Hill Joint Venture Project). Joint annual reports and final report to licences' respective expiry/renewal, for the period 6/10/1995 to 6/12/1998.
Exploration for Challenger - type primary gold deposits that may possibly have formed within buried Archaean basement rocks in the Commonwealth Hill area, which is the purpose of one of two joint venture agreements currently in force between Minotaur...-
Document
Published: 06 Jan 1999
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 1 of 2 - a very long abstract is split between these two parts].
Exploration of a long-held tenement package in the northern Gawler Craton was directed primarily at gold and also at platinum group metals, in specific work programmes executed under separate early joint venture arrangements made with Gawler Gold and...-
Document
Published: 10 Jan 1907
-
Summary of the structural setting of the Perseverance mine area, Tarcoola.
There is no abstract created for this record-
Document
Published: 31 Jul 1993
-
Mulgathing and Jumbuck areas (part of the Gawler Project Central Tenement Block). Data release at licences' joint partial surrender: project joint venture - specific annual reports for the period 1/7/2009 to 22/9/2010.
As part of the ongoing Challenger Area Joint Venture with Southern Gold intended to complete brownfields exploration near the mine and to expedite greenfields exploration of the Christie Domain for Archaean metamorphic/hydrothermal gold, work carried...-
Document
Published: 05 Jan 1911
-
Gosse and Kingoonya (part of the Mentor Project, and later the Kingoonya Project). Data release made at joint partial relinquishment upon licences' expiry/renewal: annual reports for the period 3/12/1997 to 28/9/2008. [Index Part 2 of 2].
In continuing exploration carried out by Mount Isa Mines Exploration (MIM) during 1998 on EL 1792 / 2467 Gosse and EL 1798 / 2466 Kingoonya, additional calcrete sampling and RC drilling (25 holes for 1590 m total penetration) took place at four...-
Document
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 2 of 2 - a very long abstract is split between these two parts].
Abstract (Continued from Part 1): Because of the presence of the highest gold concentration at the eastern end of the Target 14 aircore drill traverse, potential remains for delineating further mineralisation at this locality. In addition, the...-
Document
Published: 10 Jan 1907
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Cedric Bore. Annual reports plus final report to licence expiry/full surrender, for the period 2/4/2002 to 17/6/2008.
An area centred ~ 80 km north of Tarcoola was taken under licence to explore for possible economic buried precious and base metallic mineralisation hosted by Archaean and Proterozoic basement rocks. The area was selected on the basis of it having...-
Document
Published: 16 Sep 1908
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Heartbreak Hill. Annual reports to licence expiry/full surrender, for the period 27/9/1996 to 26/9/1997.
Mulgathing Complex and Hiltaba Suite rocks were interpreted from aeromagnetic data obtained in areas located 10 km north of, 70 km south-east of, and 35 km south of Tarcoola. Calcrete sampling was followed by RAB drilling (178 holes, total 5047 m)...-
Document