PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
RB 2017/00046 Koongawa Grey dimension stone deposit geological investigations: evaluation of gneiss on ML 6426 for use as dimension stone.
The Resource Assessment and Advice (RAA) team of the Geological Survey of South Australia (GSSA) was approached by John Chesini of Chesini House Pty Ltd to provide feedback as to the suitability of stone within Mining Lease (ML) 6426 for the purpose...-
Document
Published: 01 Feb 2018
-
Kottata Well (latterly a part of the Yaninee Project). First partial surrender report, for the period 29/9/2003 to 28/9/2005.
This licence, located ~30 km north-east of Venus Bay on western Eyre Peninsula, was taken out to explore for possible iron oxide - associated copper-gold deposits hosted in Proterozoic igneous basement. Basement rock exposures are very scarce within...-
Document
-
Kimba. Progress and technical reports to licence expiry/renewal for the period 6/11/1969 to 5/11/1971.
Investigations previously carried out by Pechiney had indicated the presence of substantial reserves of kaolin clays in the Kelly Tank and Bunora - Balumbah areas located near and to the south of Kimba, which might have a potential for paper-coating...-
Document
Published: 17 Dec 1971
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
The Southern Eyre Peninsula JV Project. Joint annual reports for the reporting period 1/7/2006 to 31/1/2017, plus licence-specific final reports submitted at their later full surrenders.
During the first year of the project (2006-2007), no work was undertaken on ELs 3731, 3421 or 3611. On EL 3317 Wilgerup, at the Wilgerup North Pod, Centrex undertook 2 phases of RC drilling totalling 135 holes for 12,829 m to provide information to...-
Document
Published: 09 Apr 2019
-
Tooligie Hill (latterly part of the Southern Eyre Peninsula JV Project). Final report at licence full surrender, for the period 3/12/1999 to 18/4/2017.
For the period from 1/1/2013 until the date of licence full surrender, the following additional activities were undertaken: - 1/1/2013 to 31/1/2013 – magnetite ore characterisation analyses, and interpretation of 2012 ground gravity survey data,...-
Document
Published: 14 Jun 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : Uley. Annual reports for the period 16/9/2005 to 12/10/2018.
A licence area located 20 km west-southwest of Port Lincoln, which covers the historically worked Uley graphite deposit and environs, was taken up to try to delineate sufficient mineral resources and, eventually, ore reserves of graphite in the Mining...-
Document
Published: 25 Mar 2019
-
Data release - as updated [made at SA Director of Mines’ discretion] : Warramboo (the Central Eyre Project). Annual reports [but excluding four separately held joint annual reports] for the period 6/6/2001 to 8/2/2019.
During the sixth year of tenure of the Warramboo licence, now held by Adelaide Exploration Limited as renewed EL 2846 covering the same 1363 square km area as before, the only exploration-related activity which occurred was the acquisition during...-
Document
Published: 28 Mar 2018
-
Cocata and Palkagee Well. Annual reports and final reports to licences' joint expiry/full surrender, for the period 1/12/2005 to 30/11/2010.
Exploration carried out over two adjacent areas located 50 to 70 km south-west and south of Wudinna was progressed under the terms of two separate joint venture agreements made by the licensee in October 2006, firstly with GE Resources (a subsidiary...-
Document
Published: 27 Jan 2011
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 6 partnership DPY6-33 - Mount Hope district, south-western Eyre Peninsula, Archaean iron ore mineral prospects. Drilling project final report.
The south-western Eyre Peninsula regional iron ore targeting project has recently been initiated due to the success of Lynch Mining’s previous, in part PACE Initiative - subsidised, exploratory drilling programmes (DPY2-38, January-March 2006 and...-
Document
Published: 11 Nov 2011
-
Peterlumbo, Botenella Range, Lake Gilles [West], Eurilla Dam, Wilcherry Hill, Uno, Mount Miccollo and Tin Hut Hill (the Wilcherry Hill Project). Joint annual reports for the period 6/6/2002 to 31/10/2008. [Index Part 1 of 2].
Aquila Resources took up ownership of the much previously-explored ground comprising the Wilcherry Hill Project with the intent of exploring for the first time the iron oxide - associated copper-gold & uranium (IOCG-U) mineralisation potential of...-
Document
Published: 31 Dec 2008
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 2007