RB 92/00039 Kingoonya bedrock drilling 1991.
36 reverse circulation drillholes totalling 1448 m (average depth 40.2 m) were drilled to determine the bedrock geology and geochemistry below sedimentary cover, in selected locations on the KINGOONYA 1:250,000 mapsheet area that had been recommended...-
Document
Published: 01 May 1992
-
Warrataddy Hill (part of the ABMINGA Diamond Project and the Tieyon Ni/PGM Project). Annual reports to licence expiry/full surrender, for the period 25/10/1993 to 16/3/2009.
Early work on the subject licence took place after 25/10/1993 as part of a regional search for possible shallowly buried diamondiferous kimberlites, conducted by Caldera Resources and Laura Holdings across a large tenement package which had been...-
Document
-
Mount Darling. Annual reports and final report to licence expiry/full surrender, for the period 3/8/2004 to 2/8/2008.
An area located 3 km south of the South Australia/Northern Territory border and 50 km east of the Stuart Highway, on the eastern margin of the Musgrave Block, was considered prospective for nickel and platinoid metal mineralisation hosted by layered...-
Document
Published: 20 Dec 1908
-
Commonwealth Hill, Perfection Well and Wirrida. Six-monthly progress, plus combined annual and final reports, to licence expiry/full surrender, for the period 7/12/1993 to 18/7/2006.
Exploration for possible economic deposits of epithermal/hydrothermal gold, plus precious metals and base metals, which might have formed in poorly outcropping Archaean and Proterozoic basement, commenced with a detailed interpretation of SAEI imaged...-
Document
Published: 10 Sep 1906
-
Coonalpyn (part of the Coonalpyn Joint Venture Project). Annual reports to licence expiry/full surrender for the period 16/10/2006 to 15/10/2008.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, as well as exploring for base metal mineralisation...-
Document
Published: 13 Nov 1908
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 1 of 2 - a very long abstract is split between these two parts].
Exploration of a long-held tenement package in the northern Gawler Craton was directed primarily at gold and also at platinum group metals, in specific work programmes executed under separate early joint venture arrangements made with Gawler Gold and...-
Document
Published: 10 Jan 1907
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-17, Mount Moulden and Mount Harcus mineral prospects. Project final report.
As part of the PACE Year 2 collaboration between PIRSA and the minerals industry, PepinNini Minerals proposed and was granted part subsidy funding for an extensive drilling programme in the western APY Aboriginal Lands of South Australia, to examine...-
Document
Published: 16 Jun 1906
-
Ki Ki (part of the Coonalpyn Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 14/10/1999 to 17/1/2009.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated within the Cambrian Kanmantoo Trough near Ki Ki in the upper South-East, the licensee and...-
Document
Published: 23 Feb 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-32, Ki Ki intrusion mafic/ultramafic - hosted mineral prospects. Project final report.
To further investigate the Cu-Ni-PGE mineral sulphide potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, the licensee of EL 3295 sought PACE Initiative funding to complete two...-
Document
-
Houghton. Annual reports and partial relinquishment report to licence expiry/full surrender, for the period 22/10/2001 to 21/10/2006.
Three potentially economic gold and platinum / palladium - bearing, known primary uranium-mineralised targets in the Palaeoproterozoic Houghton basement inlier have been evaluated through the conduct of office-based geological and geophysical studies,...-
Document
Published: 26 Apr 1907
-
Black Hill Intrusive Complex (northern [Bower - Florieton] and southern [Cambrai] areas). Joint annual report plus final report to licences' joint expiry/full surrender, for the period 17/2/2005 to 16/2/2007.
Inco Resources has been exploring the outcropping portion of the Ordovician Black Hill Intrusive Complex for possible Voisey's Bay style nickel, copper and platinum group element (PGE) mineralisation since 2004, when it signed a joint venture...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-18. Western Musgrave Province - Mount Caroline area magmatic nickel-copper-PGE and stratiform or epithermal / hydrothermal base metal mineral prospects. Final report.
In late 2008 PepinNini Minerals completed a stratigraphic drilling programme in the western Musgrave Province as an approved PACE Initiative Year 5 collaborative project with PIRSA. The programme was designed to investigate the Mount Caroline...-
Document
Published: 20 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-19. White Hill igneous complex Proterozoic magmatic PGE-Ni-Cu mineral prospects. Project final report.
Following a review of historic exploration data for the Mount Woods Inlier, OZ Minerals decided that the White Hill igneous complex, located 6 km north-west of the Prominent Hill mining lease, is comprised of mafic and ultramafic cumulate rocks having...-
Document
-
Wirrida (part of Minotaur's Commonwealth Hill joint venture project). Annual and final reports to licence expiry/full surrender for the period 29/9/1997 to 16/10/2006.[Index entry Part 2 of 2 - a very long abstract is split between these two parts].
Abstract (Continued from Part 1): Because of the presence of the highest gold concentration at the eastern end of the Target 14 aircore drill traverse, potential remains for delineating further mineralisation at this locality. In addition, the...-
Document
Published: 10 Jan 1907
-
PACE 2020 Discovery Drilling 2012: Year 7 Drilling Partnership DPY7-15 - NiCul Minerals Limited, Central Musgrave Project, Woodroffe and Cooperinna areas Proterozoic basement magmatic Ni-Cu-Co-PGE sulphide mineralisation targets. Drilling final report.
Early in 2012, explorer NiCul Minerals Limited (NiCul) sought PACE Initiative funding from the South Australian Government to help it undertake a programme of stratigraphic and targeted mineral exploration drilling within EL 3931 Woodroffe and EL 4587...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Claude Hills. Annual reports to licence expiry/re-issue over same area, for the period 4/12/2000 to 3/12/2005.
EL 2777 Claude Hills covers 1370 square km and is located at Surveyor General’s Corner (the SA, WA, NT State borders' triple point) and consists of 3 blocks. Early SADME work (1966) delineated 4.6 Mt of 1.5% Ni at the nearby Claude Hills/Mount Davies...-
Document
-
Data release [made at SA Director of Mines' discretion] : Kangaroo Dam (part of the Mount Woods JV Project). Annual reports to licence expiry/renewal, for the period 19/10/2000 to 6/11/2010. [ Index Part 1 of 2 ].
The large Kangaroo Dam exploration licence covers the mostly concealed western portion of the Palaeoproterozoic Mount Woods Inlier, a large block of variable magnetic intensity lying to the east and south-east of the Coober Pedy Ridge and the Mabel...-
Document
-
The Musgrave Project [Part]. Data release in lieu of submitting a final report for EL 5317: joint annual reports for the period 5/10/2010 - 31/1/2016, plus separate letters of advice of full surrenders the last being accepted on 10/11/2016.
There is no abstract created for this record-
Document
Published: 06 Oct 1916
-
Pine Ridge (part of the Central Giles Nickel Project). Annual reports and final report to licence surrender, for the period 30/3/2007 to 9/6/2015.
A licence area located in South Australia's Far North-west Aboriginal Lands, approximately 140 km north-west of Marla, has been explored primarily for massive magmatic nickel sulphide deposits possibly associated with the Proterozoic Giles Complex...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document