-
Mount Messenger. Progress reports and final report to licence expiry/renewal, for the period 25/5/1973 to 24/5/1975.
In a search for possible concealed stratiform base metal deposits associated with haematitic jaspilites and quartzites in the Cleve Uplands area, extensive rock chip, float and residual soil sampling traverses were followed by geochemical sampling of...-
Document
-
Yarrana Hill, Dunn Hill, Wallala Hill and Mount Centre (the Ceduna heavy minerals Project). Joint progress reports and joint final report to licences' joint expiry/full surrender, for the period 21/12/1989 to 20/6/1991.
TARGET: Possible Tertiary marine placer deposits of heavy mineral sands (ilmenite, rutile, zircon) on the south-eastern margin of the Eucla Basin in the Nunjikompita - Hiltaba area, 100 km east of Ceduna. EXPLORATION: A consultants' photogeological...-
Document
Published: 16 Oct 1991
-
Port Broughton. Progress reports, annual reports, technical reports, and final report to licence expiry/ surrender, for the period 15/7/1991 to 19/9/2001.
Exploration targetted Roxby Downs style and Ernest Henry style copper-gold mineralisation in an area of intensely magnetic, concealed Proterozoic metasedimentary and intrusive igneous basement terrain, characterised by complex regional geophysical...-
Document
Published: 12 Dec 2000