-
Data release [made at SA Director of Mines' discretion] : Lake Harris. First annual report for the period 31/5/2010 to 30/5/2011.
An area extending for ~10 to ~60 km westwards from Kingoonya, comprising three separate sub-blocks, is being explored for buried Archaean greenstone belt - hosted primary metallic mineralisation. Work undertaken during the first year of tenure...-
Document
-
Data release [made at SA Director of Mines' discretion] : Deception Hill. First annual report for the period 1/6/2010 to 31/5/2011.
EL 4496 (Deception Hill) is centred approximately 15 km due south of Tarcoola, and extends from west to east for about 60 km. It is regarded by the licensee as being highly prospective for a range of commodities including gold and silver, nickel, iron...-
Document
-
Penong B area and Yumbarra (part of the Eucla Basin Project tenement Group 2). Joint final report at licences' joint expiry/full surrender, for the period 16/11/2012 to 15/11/2017.
Two adjoining areas located north of Koonibba were taken up to explore this part of the south-eastern Eucla Basin for possible buried economic marine placer deposits of heavy mineral sands (HM), because they were believed to contain shallow or exposed...-
Document
Published: 12 Sep 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 31/5/2010 to 31/12/2014.
A large part of the Harris Greenstone Domain basement tectonostratigraphic block, extending from 10 km to 130 km west of Kingoonya, is being explored for possible buried economic gold, nickel and other base metal mineralisation which may be associated...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Warrior (part of the Central Gawler Project). Annual reports for the period 17/2/2010 to 20/6/2015.
During the sixth licence year, in February 2011, new licence owner Marmota Energy Limited ('Marmota') undertook a reconnaissance biogeochemical survey at the Pundinya prospect, collecting 54 x 30 g grab samples of vegetation of Mulga trees, in the...-
Document
Published: 06 Oct 1915
-
Glenloth (part of the Tarcoola Joint Venture Project). First partial surrender report, for the period 11/7/2003 to 2/11/2009.
When exploring for nickel sulphide mineralisation within buried ultramafic rocks of the Archaean Lake Harris Greenstone Belt, over TEMPEST aerial EM anomalies lying ~16 km north-west of Yerda Outstation, Mithril Resources carried out a ground EM...-
Document
-
Deception Hill. First partial surrender report, for the period 31/5/2010 to 30/5/2014.
245 square km or ~56.2% of the original area of EL 4496, in a single sub-block comprising its western part, has been relinquished because it lies within the Yellabinna Regional Reserve, a sensitive environmental conservation park located in sandy...-
Document
-
Malbooma. First partial surrender report, for the period 14/5/2012 to 13/5/2014.
The 23 square km southern sub-block portion of an area centred 30 km west of Tarcoola has been relinquished because it lies within the Yellabinna Regional Reserve, a sensitive environmental conservation park located in sandy desert wilderness country...-
Document