-
Wallaroo and Moonta mines and smelters, Yorke's [sic] Peninsula, South Australia. History, nature and methods.
A detailed account of the large scale copper mining and processing operations occurring in the 'Copper Triangle' region of South Australia in the few years following the end of the First World War. The included metrics and pictorial coverage of many...-
Document
Published: 01 Jan 1921
-
Lake Everard. Annual and final reports to licence expiry/full surrender for the period 29/8/2006 to 28/8/2009.
A planned reconnaissance soil geochemical sampling survey in an area to the east of Lake Everard was not carried out due to the need to obtain an access agreement from local native title claimants and after making a negative re-assessment of the...-
Document
Published: 14 Sep 1909
-
Whyalla. Annual reports and final report to licence expiry/full surrender, for the period 12/6/2003 to 11/6/2008.
Evaluation of the perceived Olympic Dam style copper-gold and Stuart Shelf type stratabound copper potential of, respectively, the Proterozoic basement and the Adelaidean cover rocks in an area lying immediately to the west of the Cultana Inlier was...-
Document
Published: 01 Oct 1908
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-25, eastern Mabel Creek High: Big North-West Proterozoic epithermal / hydrothermal IOCG mineral prospect. Project interim and final reports.
In its successful application to PIRSA for a grant of PACE Initiative Year 4 drilling project funding, Alliance Craton Explorer announced that it had generated an extremely attractive geophysical target with potential for Mesoproterozoic basement -...-
Document
Published: 25 Nov 1907
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Ki Ki (part of the Coonalpyn Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 14/10/1999 to 17/1/2009.
To investigate the possible Cu-Ni-PGE mineral sulphide mineralisation potential of a known buried mafic / ultramafic layered igneous intrusive complex situated within the Cambrian Kanmantoo Trough near Ki Ki in the upper South-East, the licensee and...-
Document
Published: 23 Feb 1909
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 1911
-
Oak Dam North-east, Lake Torrens, Glenside, Winjabbie and Trimmer Inlet; plus Shore Hill and Red Swamp (initially the UXA Stuart Shelf South JV Project; then OZ Minerals' Stuart Shelf Project). Joint annual reports for the period 1/11/2010 to 6/1/2017.
In continued exploration for possible economic buried Olympic Dam or Prominent Hill type IOCG style mineralisation that may exist within Proterozoic bedrock, joint venture operator Straits Resources undertook the following work on the project...-
Document
Published: 06 Mar 1918
-
Data release - as updated [made at SA Director of Mines' discretion] : [south-western] Lake Torrens area. Annual reports for the period 13/10/2010 to 12/10/2012.
An area centred ~30 km north-east of Bookaloo, which is mostly located within the Lake Torrens National Park, is being explored primarily for possible buried economic IOCG style mineralisation of the type exemplified by major deposits occurring at...-
Document
Published: 05 Nov 1912
-
Area within Tallaringa Conservation Park. Biennial reports and final report to licence full surrender, for the period 25/10/196 to December 2001.
Proterozoic and Archaean rocks of the Gawler Craton were the target hosts for gold and base metal mineralisation in the area of the eastern Tallaringa Conservation Park, west of Coober Pedy. Following an assessment of geological and geophysical data,...-
Document
-
Data release - as updated : Bulgunnia. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
An area centred approximately 70 km north-northeast of Tarcoola has been explored for possible economic buried basement-hosted IOCG style or other (e.g. Menninnie Dam and/or Mount Gunson type) altered rock facies - hosted metallic mineralisation,...-
Document
Published: 27 Oct 1922
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release - as updated : Mount Lyndhurst and Mount Lyndhurst South. Annual reports and joint annual reports to licences' joint expiry/full surrender, for the period 23/2/2006 to 18/10/2015.
A large area covered by two adjoining tenements that together are centred ~ 50 km north-east of Leigh Creek has been explored for possible buried economic copper oxide and sulphide mineralisation that may be associated with diapirs of the Adelaide...-
Document
Published: 20 Oct 1915
-
Moseley Nobs (part of the East Eyre Peninsula Project). Third partial surrender report, for the period 5/7/2006 to 4/7/2015.
EL 4860 has been part of the Investigator Resources Ltd tenement holding since that company was spun-off from Southern Gold in 2007 (as Sunthe Uranium Ltd). The Eastern Eyre Peninsula project group of licences, which lie along and just beyond the...-
Document
Published: 08 Oct 1915
-
Data release - as updated [made at SA Director of Mines' discretion] : Island Dam, Stuart Shelf and Andamooka Ranges (the Stuart Shelf Project). Joint annual reports for the period 11/10/2009 to 30/6/2018.
Exploratory drilling carried out by BHP Billiton (BHPB) during the 2009-10 project reporting year took place at six prospects thought to have good IOCG mineralisation potential, based in part on earlier drilling results and also on refined target...-
Document
Published: 30 Aug 1918
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document