-
Mount Mitchell. Progress reports and final report to licence full surrender, for the period 20/10/1980 to 19/10/1982.
Exploration was undertaken for lode and alluvial tin mineralisation which might exist within ground adjacent to the abandoned Mount Mitchell tin mine, and also for reef gold in altered granite and dolerites outcropping adjacent to the numerous small...-
Document
-
Anabama Hill. Progress reports and final report to licence expiry/full surrender, for the period 7/11/1980 to 6/11/1982.
In order to further test a large Delamerian granite pluton for its potential to host an economic porphyry molybdenum deposit of the Climax, Colorado type (following initial exploratory drilling and IP surveys that had been carried out by the SA...-
Document
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
PACE Copper Discovery Drilling (drilling partnerships with DSD and industry): Year 9 partnership DPY9-25 - Pidinga and Fig Tree Corner, western Gawler Craton, orogenic gold prospects. Drilling project final report.
An area centred ~70 km north-east of Yalata and lying ~30 km to the east of the Jacinth and Ambrosia heavy mineral deposits is being explored by Doray Minerals Limited under a joint venture agreement it has made with grant licensee Iluka Resources...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 1916
-
Moonta-Wallaroo Joint Venture. History of exploration activities.
The Moonta project was initiated in 1959 and has been worked as a joint venture since the early 1960s. A large body of geological information has been accumulated, with factual input given by data obtained from geochemical exploratory drilling of ~...-
Document
-
RB 72/00039 North Flinders Mines Ltd - Parabarana prospect appraisal and report, Callabonna, Moolawatana.
There is no abstract created for this record-
Document
Published: 01 Jan 1972
-
Economic assessment of molybdenite and scheelite mineralisation, Spilsby Island, SA.
There is no abstract created for this record-
Document
Published: 16 Jan 1967
-
RB 2021/00016 Delamerian Orogen mineral potential mapping : the Cu-Mo-Au mineral system. Interim report.
A mineral systems analysis for Cu-Mo-Au in the Delamerian Orogen has been conducted to assess the orogen's potential for containing this type of mineral occurrence. A conceptual model was delineated, and prospectivity maps were created. These maps can...-
Document
Published: 01 Nov 2021
-
Bute. Data release at the full surrender of a subsequent licence : Progress reports to licence expiry/renewal, for the period 10/6/1978 to 28/9/1979.
As part of ongoing base metal exploration of the area surrounding Bute, initial work done after the expiry of EL 248 comprised the completion of one diamond drillhole to TD 411.2 m within Carpentarian basement, targeting a magnetic anomaly thought to...-
Document
Published: 20 Nov 1979