-
Data release [made at SA Director of Mines' discretion] : Bosworth (part of the Lake Torrens Project). Annual reports to licence expiry/renewal, for the period 13/7/1998 to 5/4/2009.
An area covering parts of west-central Lake Torrens and Andamooka Island was taken up by Pima Mining because it was considered a strategic acreage acquisition, since it adjoins the southern boundary of the company's EL 2528 Andamooka already issued to...-
Document
Published: 06 May 1909
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine. Annual reports for the period 13/3/2000 to 1/11/2013.
Exploration Licence 2704 covering 23 square km surrounding the historic abandoned Mutooroo copper mine, located ~55 km east of Olary, was granted to Havilah Resources NL so that the company could assess the economic potential of the remaining sulphide...-
Document
Published: 02 Dec 1913
-
Roopena. Annual reports plus final report to licence full surrender, for the period 23/8/2012 to 16/6/2016.
A small area centred ~10 km north-west of Whyalla, straddling the Iron Knob Road and extending northwards from there, has been explored for possible buried economic IOCG mineralisation that may have formed in Proterozoic basement rocks. During the...-
Document
Published: 17 Jun 1916
-
Proposed copper mining project. Statement of environmental factors.
Drilling near Leigh Creek had delineated sufficient reserves of oxidized copper ore, for 5 years chemical operations at Burra and Port Adelaide, in 7 separate deposits in 3 areas, namely : 1) Mountain of Light : Paltridge North (formerly Mountain of...-
Document
-
Environmental Base Statement, EL 160, Yudnamutana, South Australia.
There is no abstract created for this record-
Document
-
The Adelaide Hills Project (now including the former Fleurieu Project tenements). Annual reports for the period 1/10/2013 to 30/11/2018 plus expiry/full surrender reports to 7/10/2023.
During the twelfth, 2013-2014 project year, work on the now combined licence holdings of the Terramin Group focussed on prospect evaluation done at Bird-in-Hand (environmental and hydrological studies), Wheal Barton and Golden Slope, plus the ongoing...-
Document
-
Copley and Leigh Creek. Progress reports for the period 4/10/1982 to 27/1/1991.
TARGET: Exploration and evaluation of known secondary copper occurrences and exploration for gold and phosphates in the Lyndhurst-Copley region. EXPLORATION: Including the work done previously in EL 929, exploration activities undertaken since 1981...-
Document
Published: 01 Jan 1991
-
Mount Lyndhurst. Progress reports for the period 17/11/81 to 16/11/83.
TARGET: Evaluation of secondary copper occurrences around old workings including Lynda, Lorna Doone, White Lead and Mount Burr. EXPLORATION: Literature review and field examination of 65 known mines and prospects. Ground magnetic surveys, geological...-
Document
Published: 01 Jan 1983
-
RB 00562 Estimates of the cost of a plant for treating Copperfield (Qld) smelter slag.
The report includes a preliminary estimate of equipment sizes, capital and operating costs, together with a possible flowsheet of a treatment plant for treating slag at Copperfield Q'ld.-
Document
-
Prominent Hill Copper-Gold Project. Significant Environmental Benefit (SEB) Offset Area - Stage 1 Management Plan.
As part of the Mining and Rehabilitation Program (MARP) submission for the Prominent Hill Copper-Gold Project, a Native Vegetation Management Plan (NVMP) was developed in accordance with the MARP Guidelines prepared by PIRSA. The NVMP outlined how...-
Document