Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 1910
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 1907
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 3 partnership no. DPY3-28, Mount Woods IOCG Project mineral prospect. Project final report.
PACE Initiative Year 3 drilling project funds were secured by Goldstream Mining to explore for base metals and gold within two licence areas taken out over concealed Proterozoic basement of the Mt Woods Inlier, and which also cover parts of the Coober...-
Document
Published: 12 Dec 1906
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-40 - western Middleback Range region - Stony Hill area Archaean to Proterozoic stratabound iron ore mineral prospects. Project final report.
Banded iron formation (BIF) rock outcrops and an associated 15 km long aeromagnetic anomaly located about 20 km west of Iron Baron were chosen by Centrex Metals as high quality targets deserving of exploration for economic iron mineralisation...-
Document
Published: 28 Nov 1908
-
Bulgunnia, Gosse and Kingoonya (the Mentor Project). Data release made at the surrender of subsequent licences : annual reports for the period 27/10/1992 to 15/11/1997. [Index entry Part 1 of 2 - a very long abstract is split between these two parts].
The Gawler Joint Venture partners (Dominion Mining and Resolute Resources) have been exploring three near-contiguous areas located in the north of the Tarcoola - Kingoonya district, seeking possible economic concealed epithermal/mesothermal...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [ Index Part 2 of 2 ].
During the 2006 reporting period for renewed Mount Woods EL 3518 (i.e. for licence Year 6), Goldstream conducted ongoing exploration that included campaigns of diamond, RC, RAB and AC drilling, plus, in relation to the possible iron ore / copper-gold...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Bindyi South. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 24/11/2017.
An area located immediately south of Bindyi Homestead on Koonamore Station was taken up to explore for possible economic stratabound iron ore (magnetite) hosted by metamorphosed Adelaidean glacial sedimentary strata of the Yudnamutana Subgroup....-
Document
Published: 24 Nov 1917
-
Safari, Lake Woorong, Leonard Rise, Thunderstorm Creek and Brumby Creek areas (Coober Pedy Ridge Project). Quarterly and six-monthly progress, plus annual and final, joint activity reports for the period 22/4/1991 to 22/3/2000.
The Coober Pedy Ridge / Mount Woods Inlier project investigated a 170 km long east-west belt of medium to high grade Proterozoic metamophics and syn- and post tectonic granites, centred 25 km south of Coober Pedy, for Broken Hill type stratiform...-
Document
-
Woomera Project. Joint annual reports for the period 29/9/2008 to 15/6/2017. Includes information status for EL 6085 at licence expiry, for period 16/06/2017 to 01/01/2023: no work performed.
No field work was performed on the three subject licences during the period 2008-2010 inclusive. During 2010, Dominion Gold Operations undertook a desktop evaluation of the possible iron ore potential of the licences. During 2011, the licensee...-
Document
Published: 01 Jan 1923
-
Data release [made at SA Director of Mines' discretion] : Mount Hill - Tod River area. Annual reports [to the commencement of the Northern Eyre Peninsula Project licences' combined reporting status] for the period 13/3/2002 to 12/3/2005.
An area which has had little exploration for iron ore done previously was taken up by Centrex Metals Ltd to cover potentially magnetite-rich Early Proterozoic banded iron formation (BIF) strata outcrops and subcrop located within the Lincoln Uplands...-
Document
-
Data release [made at SA Director of Mines' discretion] : Mount Woods (part of the Mount Woods Joint Venture Project). Annual reports for the period 19/12/2000 to 30/1/2011. [Index Part 1 of 2 ].
An area centred approximately 50 km south-east of Coober Pedy has been taken up after it was surrendered early in 2000 by the BHP Minerals / Western Mining Corp. joint venture consortium (cf. Env 8434). The main mineral commodities now being sought by...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 1907
-
Data release [made at SA Director of Mines' discretion] : Tumby Bay. Annual reports [to the 24/11/2006 commencement of the Eyre Peninsula Project licences' combined reporting status] for the period 18/1/2002 to 17/1/2007.
Exploration Licence 2887 Tumby Bay was taken out to cover prospective magnetite rich Banded Iron Formations (BIF) close to the eastern coast of the Eyre Peninsula. Potential was seen for a magnetite concentrate export operation taking advantage of...-
Document
Published: 05 Mar 1907
-
Olary (part of the Braemar Iron Project). Annual reports to licence expiry/cancellation, for the period 20/9/2010 to 19/9/2015.
A licence area in the Olary district comprising three separate sub-blocks has been explored for possible economic stratabound iron ore occurrences within partly concealed Neoproterozoic bedrock. The subject ground was taken up by Wentworth Metals...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Outalpa (part of the Curnamona Project). Annual reports for the period 10/6/2012 to 9/6/2018.
The Outalpa (EL 3472) licence area, comprised of two separate sub-blocks respectively centred ~30 km north-northeast and ~45 km north-northwest of Manna Hill, is one of five adjacent tenements held by PepinNini Minerals within the eastern Adelaide...-
Document
-
Pondooma / Ironstone Hut (part of the Northern Eyre Peninsula Project). Final report at licence full surrender, for the period 3/12/2002 to 24/9/2015.
An area originally granted as Exploration Licence 3048 Pondooma, which consisted of two separate sub-blocks centred ~60 km south-west of Whyalla, was applied for to cover a poorly exposed belt of banded iron formation (BIF) strata identified on...-
Document
-
Cronje Dam and Oak Bank Outstation (the Cronje Dam Sedimentary Uranium Project). Annual and joint annual reports, plus final report at remaining licence's expiry/full surrender, for the period 20/10/2005 to 1/11/2014.
An area comprised of three separate sub-blocks generally located ~60 km south of Manna Hill and ~70 km south-southeast of Olary has been explored for Tertiary sedimentary uranium which may have formed in buried north to south trending palaeochannels...-
Document