-
Anabama Hill. Progress reports and final report to licence expiry/full surrender, for the period 7/11/1980 to 6/11/1982.
In order to further test a large Delamerian granite pluton for its potential to host an economic porphyry molybdenum deposit of the Climax, Colorado type (following initial exploratory drilling and IP surveys that had been carried out by the SA...-
Document
-
RB 59/00126 Sir Joseph Banks Islands, Spencer Gulf. Geological reconnaissance (appendices not published).
There is no abstract created for this record-
Document
Published: 01 Jan 1967
-
RB 60/00063 Geological reconnaissance of the coastal areas of southern Eyre Peninsula for molybdenite and scheelite.
Rocks in the Flinders and Hutchinson groups are exposed sporadically around the coast of Eyre Peninsula. Reported occurrences of molybdenite and scheelite in these rock types were investigated. No significant rare metal minerals were found in the...-
Document
Published: 23 Mar 1965
-
RB 60/00101 Reconnaissance for scheelite deposits in the Sir Joseph Banks Group of islands (undertaken during January and March 1964).
In the Sir Joseph Banks Group of southern Spencer Gulf offshore islands, outcropping Archaean arenaceous, arkosic and calcareous sedimentary rocks appear to have been folded and granitised prior to the deposition of the Adelaidean System sedimentary...-
Document
Published: 21 May 1965
-
RB 77/00051;Env 03054 Porphyry style copper/molybdenum mineralization at Anabama Hill and the Cronje Dam copper prospect.
For a project to determine the base metal potential of known copper-mineralised igneous rocks which outcrop in an area located approximately 59 km south-west of Olary, the South Australian Government has completed detailed mapping, geochemical...-
Document
Published: 17 May 1977
-
Parabarana copper prospect. Progress reports on rotary percussion and diamond drilling campaigns, for the period February 1970 to January 1971.
An area of 7 square miles surrounding the historic shallowly worked Parabarana copper deposit in the far north-eastern Flinders Ranges, which outcrops at Copper Hill as vein-type disseminated secondary ore over a width of around 1200 feet, was...-
Document
-
Glenloth. Progress reports and final report to licence full surrender, for the period 1/8/1965 to 31/2/1967.
TARGET: Economic tin mineralisation. EXPLORATION: 1:32,000 scale detailed geological mapping, diamond drilling (9 shallow vertical holes - deepest 57 feet) in the Mount Mitchell area near Glenloth Goldfield, bulk sampling of greisen and vein quartz,...-
Document
Published: 14 Feb 1967
-
MR 003 Review of mining operations in the State of South Australia during the half-year ended December 31st, 1904
Articles and summaries are provided for the following: Copper: Wallaroo and Moonta, Paramatta and Yelta, Hamley, Moonta, Blinman, Burra Burra, Kapunda, Sweet Nell (North-West), Mount Gunson (North-West), Prince Alfred, Lynda Mines Gold: Mount...-
Document
-
Data release [made at SA Director of Mines' discretion] : Wadnaminga, Manna Hill, Mount Victor, Yunta and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 3/4/1997 to 18/7/2008.
A group of five adjoining exploration licences covering ~3300 square km situated along the southern flank of the Proterozoic Curnamona Craton (Olary Block) and the adjoining Nackara Arc of the Adelaide Geosyncline is being explored for possible...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Curnamona JV Project area (including Benagerie and Kalkaroo). Combined annual reports for the period 10/5/2003 to 31/12/2007.
Ongoing exploration carried out by project operator Havilah Resources under its newly ratified, twelve exploration licence Curnamona Project Amalgamated Expenditure Agreement, for the period 15/10/2003 to 31/12/2004, consisted mainly of drilling done...-
Document
-
RB 2012/00012 PACE Geochronology: Results of collaborative geochronology projects, 2011-2012.
This report presents the results of geochronology from projects completed during 2011 and 2012, which addressed rock samples collected from a number of different geological provinces within South Australia. The Musgrave Province in northern South...-
Document
Published: 01 Sep 2012
-
Anabama Hill. Progress reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1970.
After its initial stream sediment sampling and rock chip sampling had revealed that significant base metal anomalism (Mo to 600 ppm and Cu to 300 ppm) exists on and near granitic rock outcrops at Anabama Hill, Asarco undertook detailed 1:1200 scale...-
Document
-
Coonalpyn. Progress reports and final report to licence full surrender, for the period 29/3/1982 to 6/9/1985.
Cambrian rocks lying beneath relatively thin Phanerozoic cover on the western edge of the Murray Basin were targeted by CSR principally for stratiform volcanogenic massive copper sulphide deposits, and for epigenetic Palaeozoic gold occurrences...-
Document
-
Netley Hill. Progress and final reports to licence expiry/full surrender for the period 1/12/1968 to 30/11/1969.
A rotary percussion drilling programme (8 vertical holes for a total penetration of 1920 feet) was undertaken at Netley Hill to look for economic copper and molbdenum mineralisation in a greisen (hydrothermally altered granite) body which has an...-
Document
Published: 19 Nov 1970
-
Sir Joseph Banks [Island Group]. Progress reports to licence expiry/renewal, for the period 1/8/1965 to 31/7/1966.
As soon as the SA Government restored public access to the subject ground within Spencer Gulf that it had temporarily reserved from the provisions of the State's Mining Act, Kennecott Explorations (Kennecott) took up SML 85 there to evaluate an...-
Document
Published: 06 Sep 1966
-
Spilsby Island. Progress and final reports to licence expiry/full surrender for the period 18/6/1970 to 17/6/1971.
SML 434 was taken out to enable making a re-assessment of the economic potential of exposed molybdenite-scheelite mineralisation first identified along the southern shores of Spilsby Island during 1963. There, outcropping equigranular Lower...-
Document
-
RB 2015/00003 PACE Geochronology: Results of collaborative geochronology projects, 2013–2015.
The PACE Geochronology program fosters collaboration on projects of geological and metallogenic significance with focus on dating rocks and minerals from samples suggested by companies through a competitive proposal-based selection process. Successful...-
Document
Published: 01 Aug 2017