-
Cleve Central area. Progress and final reports to licence expiry for the period 7/6/1979 to 11/10/1985.
Exploration for Broken Hill or Aggeneys type Proterozoic stratiform base metal massive sulphides within the Hutchison Group in the Mount Shannan area, north of Cleve, has included the acquisition, processing and interpretation of airborne magnetic,...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Data release [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 17/10/2003 to 19/2/2010.
Paleoproterozoic metasediments of the Hutchison Group, and Lincoln Complex granitoids, were the targets of exploration for gold, base metals, and granite dimension stone in an area 40 km south of Kimba. In reporting year 3 for EL 2858, no field work...-
Document
Published: 04 Mar 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Middleback Range and Moonabie Hills. Joint annual reports for the period 1/2/2007 to 30/1/2019, plus surrender reports to 9/7/2023.
Project Connelly is designed to target haematite mineralisation on OneSteel's mining and exploration leases, including EL 3516 Middleback Range, with the aim of adding to the haematite reserve. In addition to the exploration programme, reserve...-
Document
Published: 29 Mar 1918
-
Cleve West. Progress reports and final report to licence full surrender, for the period 25/9/1979 to 27/1/1985.
The target within an area centred ~35 km north-west of Cleve was massive stratiform Broken Hill and Aggenys style base metals mineralisation associated with the Lower and Upper Middleback Jaspilite units of the Hutchison Group. A world class sized...-
Document
-
Elbow Hill. Annual reports to licence expiry/full surrender, for the period 20/11/2006 to 19/11/2011.
Exploration of a small licence area located in the Cleve Hills approximately 100 km south-west of Whyalla and 10 km west of Cowell has primarily targeted structurally controlled high grade vein type uranium mineralisation and unconformity style...-
Document
Published: 02 Dec 1911
-
PACE 2020 Initiative : PACE Targeting, Year 1 partnership no. 8 - Central Gawler Project area, Eurilla Dam, Uno, Peterlumbo and Mount Miccollo airborne magnetic/radiometric geophysical survey. Project PT1-08 final report.
Since late 2007, Trafford Resources has been exploring for possible buried economic IOCG or skarn style metallic mineral deposits within the four subject licences located in the southern Gawler Ranges, as part of the larger Wilcherry Hill Project...-
Document
Published: 21 Nov 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Kimba Gap, Ironstone Hut, Ironstone Hill, Stony Hill, Gilles Downs and Minbrie areas (the Northern Eyre Peninsula Project). Joint annual reports for the period 2/12/2005 to 31/1/2013.
Exploration for possible economic occurrences of magnetite and/or haematite iron ore formed in concealed Proterozoic basement to the west of the Middleback Range is being carried out by Northern Eyre Peninsula Project (NEPP) joint venturer Centrex...-
Document
-
Data release - as updated : Moonabie (part of the East Eyre Peninsula Project). Annual reports plus final report to licence expiry/full surrender, for the period 1/5/2006 to 13/3/2017.
A licence consisting of three separate sub-blocks that are centred approximately 60 km WSW of Whyalla is being explored for possible economic primary uranium mineralisation plus precious and base metals, in a structurally complex epithermal and...-
Document
Published: 29 Apr 1917
-
Data release - as updated : Botenella Gate (part of the East Eyre Peninsula Project). Annual reports to licence expiry/full surrender, for the period 20/4/2009 to 19/4/2018.
Exploration aimed primarily for economic buried Menninnie Dam - style base and precious metals mineralisation hosted by Palaeoproterozoic metasedimentary basement has been conducted on a licence located in the Lake Gilles district. There was also...-
Document
Published: 05 Jun 1918
-
Cleve Central. Progress reports to licence expiry/renewal for the period 17/2/1977 to 16/2/1979.
In a search for possible economic Palaeoproterozoic syngenetic/stratiform base metals within an area located just north of Cleve on central Eyre Peninsula, geological mapping (1:20,000 scale) and rock chip sampling was carried out over poor exposures...-
Document
Published: 28 Mar 1979