-
Peake and Malinong. Final report at licences' joint full surrender, for the period 7/7/1980 to 6/8/1982.
In a search for economic Tertiary brown coal in the south-eastern Murray Basin, a large reconnaissance drilling programme was undertaken during February-April 1981 to test known carbonaceous sediments reported as encountered by previous drillholes and...-
Document
Published: 06 Sep 1982
-
Petroleum geochemistry of the Otway Basin, and the significance of coastal bitumen strandings on adjacent southern Australian beaches. Volumes 1 to 5 source rock studies.
The standing of crude oil on the beaches of southern Australia was first recorded approximately 150 years ago. This material, known locally as coastal bitumen, was used by the early maritime visitors and settlers to caulk their vessels and is the...-
Document
-
RB 36/00077 Leigh Creek Coalfield. North Field, Lobe C.
Coal has been proved at Lobe C to a depth of 220 feet of overburden in an arcuate area along the southern and western margins of the basin. Within the suggested open cut area the coal seam averages 35 feet in thickness, has a weighted average ash...-
Document
Published: 26 Oct 1953
-
RB 37/00028 Leigh Creek Coalfield: Report on exploration of the north-eastern margin - Telford Basin area 'Telford Opencut, extension east'. (CONFIDENTIAL)
An area located on the north-eastern margin of the Telford Basin, to the east of the present extent of theTelford Open Cut mine main pit, which is known to contain potentially mineable buried coal seams, has been examined geologically and...-
Document
Published: 03 Mar 1954
-
RB 37/00068 Leigh Creek Coalfield, central area - Upper Coal Series. Report on scout drilling.
In the Triassic coal measures of Telford Basin occurring 1000 + (?) feet stratigraphically above the main (Telfod) seam are a number of coal seams - the "Upper coal series" - which further add to the opencut coal reserves at Leigh Creek Coalfield....-
Document
Published: 19 Mar 1954
-
RB 37/00157 Leigh Creek Coalfield - Exploration of the southeastern margin, Telford Basin area (Telford Main Seam eastern margin, southern extension).
The area under review is situated in the south-eastern section of Telford Basin between co-ordinates 8,000 and 34,000, and is a southern extension of the main (Telford) coal seam proved previously on the eastern margin. Coal has been proved by close...-
Document
Published: 14 Jul 1954
-
RB 56/00083 Pyrite-pyrhotite deposits at Nairne.
The Nairne Pyrite Deposit occurs at Drukunga, three and a half miles east of Nairne, and 29 miles from Adelaide on the eastern flank of the Mount Lofty Ranges. The deposit is being worked for iron sulphides. Operations commenced in 1955 as a joint...-
Document
Published: 01 Jan 1965
-
RB 60/00045 Report on overseas visit, April-July 1964. Part 2: Evaporites, brines, sulphur.
Whilst overseas during the period April to July, 1964, the writer visited, in addition to phosphate deposits, most of the major potash mines and a number of evaporated-salt, rock salt, brine and sulphur operations in North America, Europe and Israel,...-
Document
Published: 10 Mar 1965
-
RB 95/00029 Leigh Creek Coalfield, Lobe E coal deposit. Geological report.
In 1993 an exploration drilling program was undertaken jointly by The Department of Mines and Energy (MESA) and ETSA Corporation (ETSA) over areas considered prospective for coal within the vicinity of the existing infrastructure of the Leigh Creek...-
Document
Published: 01 Jun 1996
-
RB 96/00025 Exploration for coal in the Coober Pedy area, South Australia.
As part of the Government's South Australian Exploration Initiative (SAEI), and in support of the South Australian Steel and Energy (SASE) Project, a small coal exploration program was initiated by MESA to investigate a number of subtle magnetic lows...-
Document
Published: 01 Sep 1996
-
NERDDC Project 590 : [ Research into the feasibility of ] Underground gasification of [ mining inaccessible ] Leigh Creek coal. Reports on field investigations and geotechnical studies.
During the first few months of 1985, field investigations were undertaken at Leigh Creek by consultants Golder Associates to provide quantitative data on the strength and permeability characteristics of the geological profile of the Main Series coal...-
Document
-
Rehabilitation of the Nairne Pyrites Ltd quarry area and treatment of acidic effluent. Progress and final reports on investigations for the period March 1973 to June 1975.
A chemical survey of Dawesley Creek in the Brukunga Mine area has concluded that seepages from the southern mine waste dumps located alongside the creek contribute the greater proportion of pollutants (acidity, iron, aluminium, manganese, zinc,...-
Document
-
Report on 'S' seam from Lake Phillipson bore 3D, South Australia.
Consultant's report discusses the intrinsic and comparative nature of, plus possible causes for, the unique chemical composition of Lake Phillipson coal, when compared with coal from other low-rank Australian deposits such as Leigh Creek and the...-
Document
-
Arckaringa [North-east]. Annual reports to licence full surrender, for the period 13/4/2005 to 3/6/2014.
An area of 185 square km was taken up by SAPEX to allow it to evaluate afresh known sub-bituminous coal measures in the Permian Mount Toondina Formation that constitute the East Wintinna coal deposit. This deposit had been discovered by Meekatharra...-
Document
Published: 11 Jul 1914
-
Data release - as updated [made at SA Director of Mines' discretion] : Camel Lake. Annual reports to licence surrender for the period 16/11/2012 to 15/11/2023.
An area located ~ 70 km north-east of Ooldea Siding and 50 km east of Maralinga is being explored for the industrial mineral kaolin, and more particularly its crystallographic form halloysite, which typically occurs as microtubules or nanotubes which...-
Document
Published: 21 Nov 1923
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-14 - Mingary Station, Broken Hill Domain, Palaeoproterozoic lode style stratabound hydrothermal Au-Cu-Ag prospects. Drilling interim and final reports.
During 2014, Minotaur Exploration successfully applied for a PACE 2015 collaborative drilling subsidy grant to help it undertake drill testing of the inferred extension within its current tenement EL 4844 Mingary of the quartzite lode horizon present...-
Document
-
Moorlands. Progress reports and final report to licence full surrender, for the period 15/1/1979 to 30/11/1984.
Adelaide Brighton Cement took up tenure of the Moorlands lignite deposit during September 1976 in order to conduct confirmatory drilling of the published coal resource, to prepare a mining study for Lobe 'E', and overall, to assess the coal's...-
Document
Published: 23 Nov 1984
-
Mount Alberga. Progress reports for the period 21/4/86 to 20/4/87.
Native sulphur associated with salt domes was the target near Mount Todmorden. No field work was undertaken.-
Document
Published: 13 Jan 1988
-
Todmorden. Progress reports for the period 21/4/1986 to 20/11/1987.
TARGET: Native sulphur associated with possible salt dome structures, the locations of which were interpreted from past petroleum exploration seismic reflection surveys. EXPLORATION: A detailed gravity survey, and 2 rotary/core drillholes totalling...-
Document
Published: 13 Jan 1988
-
Wintinna Hill, Welbourn Hill Homestead, South Neales River and Mount Willoughby Homestead. Joint progress reports to licences' joint full surrender, for the period 11/11/1986 to 10/11/1987.
An extensive review was undertaken of the potential of the eastern Officer Basin area extending 50-150 km west of Oodnadatta for hosting buried native sulphur deposits in association with salt dome structures, but the recommended follow-up exploration...-
Document
Published: 20 Jan 1988