-
Report on the Shamrock uranium prospect.
Uranium mineralisation was first discovered at the old Shamrock Copper Mine during a systematic search of old mine dumps by the South Australian Department of Mines in 1955. Follow-up investigations located a small high-grade uranium lode (Valley...-
Document
-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
Frome Downs and Curnamona. Respective progress reports, annual reports and JV partner's final report to licences' joint expiry/renewal, for the period 11/2/1971 to 12/2/1973.
77 rotary / diamond holes drilled by Pacminex (total 9385 m, including 196 m cored) plus another 53 holes drilled within SML 544 by joint venturer Esso (total 7029 m) indicate that a highly prospective radioactive mineralised zone occurs within...-
Document
-
Mulyungarie. Progress reports to licence expiry/renewal for the period 13/5/1972 to 12/5/1973.
Ongoing exploration for possible economic sandstone-type uranium deposits formed in Tertiary palaeochannels in the Yarramba area, 50 km north-west of Cockburn, has included further open hole rotary drilling and downhole geophysical logging (176 holes...-
Document
-
Gunsight and Yudnamutana. Quarterly and annual reports for the period 25/5/79 to 30/8/83.
A sequence of exploration programs in the Mount Painter Province, undertaken on Special Mining Leases since 1965, have been previously released. Exploration for base metals, gold, uranium and REE since 1974, in an area extending 50 km southwest from...-
Document
-
Roopena Station. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 26/6/1985.
Exploration of an area situated between Whyalla, Iron Knob and The Bluff overlooking Myall Creek, 20 km south-west of Port Augusta, aimed to test for Olympic Dam - type Cu-U-Au mineralisation associated with products of igneous activity located in and...-
Document
Published: 09 Aug 1985
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-44, eastern Eyre Peninsula, Glensea & Franklin gravity targets representing inferred Proterozoic mesothermal/metamorphic basement uranium prospects. Final report.
PACE Initiative Year 5 funding for exploratory drilling was granted to Stellar Resources under its proposal DPY-5-44 for a project designed to test geophysical targets within EL 3978 which were interpreted / inferred to represent alaskite units...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-26 - south-western Cooper Basin district - Tertiary sedimentary uranium mineral prospects. Project interim and final reports.
As a PACE Initiative Year 5 drilling project that was approved for part-subsidy by PIRSA, a 16,777 m shallow rotary mud drilling programme was undertaken during the period August to November 2008 within five of the Sturt Joint Venture exploration...-
Document
Published: 31 Jan 1909
-
SADM/Amdel Project MP 1/1/172: In situ leaching of uranium (Honeymoon deposit, Frome Embayment). [Results of analytical, mineralogical and metallurgical testwork performed on diamond drill core samples]. Progress reports 1-6, May 1975 to November 1976.
At the request of Mines Administration and of the South Australian Mines Department, Amdel has undertaken a project designed to obtain data on the in situ leaching potential of the uranium ore in the Honeymoon deposit, located in the Lake Frome region...-
Document
Published: 05 Nov 1976
-
Verran and Fair View (the Corunna Project). Joint annual reports and final report to licences' joint expiry/full surrender, for the period 29/4/2005 to 28/4/2009.
A search for possible economic North/South Alligator Rivers or McArthur River (NT) style epicratonic, unconformity - related sedimentary uranium deposits was conducted across two licences taken up over areas located west and south of Cleve on central...-
Document
-
Yarramba. Annual reports submitted until the commencement of licences' joint reporting on the South Eagle / Honeymoon Project, for the period 10/4/2000 to 26/8/2009. [ Index Part 1 of 2 ].
Southern Cross Resources Australia Pty Ltd (Southern Cross) purchased Rio Tinto Exploration Limited’s share of the Northern Olary Joint Venture, including its interest in the subject EL 2310 Yarramba, in November 2000. Southern Cross has held the...-
Document
-
Data release - as updated : McDouall Peak. Annual reports and final report to licence expiry/full surrender, for the period 8/10/2007 to 7/10/2022.
Quasar Resources has been exploring a large licence area centred approximately 40 km south-west of the Prominent Hill mine for possible economic buried iron-oxide-copper-gold (IOCG) style mineralisation, epithermal base metal mineralisation of the...-
Document
Published: 27 Oct 1922
-
Tarcoola. Data release made in lieu of a 25% first partial relinquishment at licence renewal: [Part 1 of 2] progress reports for the period 7/6/1978 to 19/4/1984.
In 1978 exploratory rotary drilling (11 holes, total 629 m) for inferred sediment-hosted roll-front uranium orebodies buried beneath salt lake topographic depressions east of Tarcoola intersected low levels of uranium (max 14 ppm) at fresh water /...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Oak Dam North-east. Annual reports for the period 18/1/2006 to 17/1/2011.
A relatively large but little-explored area of the central-eastern Stuart Shelf, which is almost wholly covered by scrubby sand dunes and swampy salt lakes, thereby making surface access very difficult despite it being located only ~30 km to 50 km km...-
Document
Published: 16 Mar 1911
-
Data release - as updated [made at SA Director of Mines' discretion] : Mullaquana (part of the Mullaquana, later called Samphire, Uranium Project). Annual reports for the period 20/11/2009 to 19/11/2018.
During licence Year 4, UraniumSA undertook the following work on EL 3652: - pattern drilling of 232 rotary mud holes totalling 18,416 m, targeting the Blackbush and Plumbush prospects. - core drilling totalling 876 m in 8 holes, to characterise...-
Document
Published: 03 Dec 1918
-
Data release [made at SA Director of Mines' discretion] : North-western Eyre Peninsula (eastern Eucla Basin) heavy mineral sands exploration tenement group [Group 3]. Joint annual reports for the period 1/7/2004 to 31/5/2010. [Index part 2 of 2].
Within the subject south-eastern Eucla Basin tenements, Iluka's ongoing exploration has targeted the Tertiary-aged beach sands deposited during the five marine incursions that occurred from the Middle Eocene to the Pliocene, with a focus on exploring...-
Document
Published: 01 Sep 1910
-
Data release - as updated [made at SA Director of Mines' discretion] : Wartaka, Iron Knob, Reid Lookout and Old Wartaka (the Parkinson Dam Project). Annual reports and joint annual reports for the period 17/2/2005 to 26/4/2019.
Four small, adjacent licences located on the south-eastern, shallow subcrop margin of the Gawler Ranges, which together make up an area centred about 25 km north-east of Lake Gilles and 60 km west of Port Augusta, are being explored for possible...-
Document
Published: 30 Apr 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Yarramba and South Eagle (the South Eagle / Honeymoon Project). Joint annual reports for the period 27/8/2007 to 25/9/2015.
Continuing uranium exploration within the Honeymoon district of South Australia, under new project owner Uranium One Australia Pty Ltd (a subsidiary of Uranium One, Inc.) has continued to target sandstone-hosted uranium mineralisation, primarily...-
Document
Published: 22 Sep 1915
-
Lake Anthony. Quarterly reports, first joint annual report (with SML 711) and joint final report to licence full surrender, for the period 1/9/1971 to 31/5/1973.
An area located just to the east of the edge of the Nullarbor Plain, occupied by many scattered large and small salt lakes surrounded by sand dunes, with Precambrian basement [of the western Gawler Craton] subcropping near the surface, has been...-
Document
Published: 26 Jun 1973
-
Ilkina, Acraman, Yarranna Hill, Poondana Rock, Waddikee Rocks, Mount Sturt, Yaninee, Nunjikompita, Poochera, Wandana and Smoky Bay (Narlaby Palaeochannel area). Combined progress and technical reports for the period 5/1/81 to 31/12/83.
Carpentaria's exploration for sandstone type uranium deposits in the West Coast region of SA over the period 1979-1982 has revealed a major Tertiary buried palaeochannel system. The main Narlaby Palaeochannel is 170 km long, up to 10 km wide and is...-
Document