Nuckulla Hill. Annual and final reports to licence expiry/full surrender for the period 12/7/2004 to 11/7/2009.
As part of a search for possible Tunkillia type structurally-controlled buried gold deposits within an area located approximately 120 km north-east of Ceduna, licensee Southern Gold targeted geochemical and geophysical anomalies that had previously...-
Document
Published: 27 Oct 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-45, Old Well and New Well shear-associated gold mineral prospects. Project final report.
The Yarlbrinda and Yerda Shear Zones of the central Gawler Craton, partly present within EL 3107 in the Tarcoola-Glenloth-Lake Harris region, were the target for a number of mineral exploratory drillholes put down there by by licence farminee Minotaur...-
Document
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 1909
-
Nuckulla Hill. Partial surrender report for the period 6/12/1994 to 5/12/1998.
Regional stream sediment, rock chip and calcrete sampling in the western and north-eastern parts of the Nuckulla Hill licence returned weakly anomalous values. The prospectivity of the surrendered ground for base and precious metals was considered to...-
Document
-
Poochera. Annual reports to licence full surrender, for the period 8/1/1996 to 15/1/2000.
As part of a search for structurally related Ernest Henry - style Cu-Au mineralisation and other possible polymetallic deposits, analysis of aeromagnetic data obtained from an area 60-100 km east to north-east of Streaky Bay indicated the presence of...-
Document
-
Yumbarra (part of Gawler Joint Venture Project). Annual reports to licence expiry/full surrender, for the period 5/1/2000 to 4/1/2003.
A prominent (> 7000 nT), multi-featured, and also geomorphically expressed aeromagnetic anomaly of undoubted prime exploration potential was discovered within the Yumbarra Conservation Park as a result of detailed low level aeromagnetic surveys...-
Document
-
Smoky Bay. Progress and surrender reports for the period 1/5/1997 to 1/9/2000.
Exploration in an area centred on Smoky Bay, 40 km south-east of Ceduna, targeted shear - hosted mineralisation associated with granitoids of the Hiltaba and St Peter Suites. Several lineaments were identified from aeromagnetic data. Undertaking...-
Document
Published: 01 Sep 1900
-
Ceduna. Annual reports and final report to licence full surrender, for the period 31/8/1996 to 17/7/2000.
Joint venture exploration over an area extending for 40, 35 and 50 km respectively west, north and east of Ceduna targeted Archaean and Proterozoic Yarlbrinda - style Au and Ernest Henry / Olympic Dam style Cu-Au associated with shear zones and...-
Document
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 1912
-
Penong B area and Yumbarra (part of the Eucla Basin Project tenement Group 2). Joint final report at licences' joint expiry/full surrender, for the period 16/11/2012 to 15/11/2017.
Two adjoining areas located north of Koonibba were taken up to explore this part of the south-eastern Eucla Basin for possible buried economic marine placer deposits of heavy mineral sands (HM), because they were believed to contain shallow or exposed...-
Document
Published: 12 Sep 1917
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Everard. Annual reports to licence expiry/renewal, for the period 8/11/1999 to 24/8/2010.
During licence Year 6, on renewed EL 2697, AngloGold drilled a total of 177 vertical RAB holes (LER2508 – LER2679) for 9975 m plus 20 inclined RC holes (LRC360 – LRC379) for 2964 m. The drilling of 97 RAB holes at the Smith prospect revealed a 300 m x...-
Document
-
Data release - as updated [made at SA Director of Mines discretion]: the Eyre Peninsula Project. Joint annual reports for the period 29/12/2013 to 28/12/2018.
During the 2014 project reporting year, licensee Adelaide Resources undertook a research and development phase surface-based biogeochemical and field portable X ray fluorescence (FPXRF) spectrometric sampling programme over its Baggy Green gold...-
Document
Published: 22 Apr 1919
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 1919
-
Data release [made at SA Director of Mines' discretion] : Lake Everard West (part of the Gawler Craton Joint Venture, and latterly part of the Tunkillia JV Project). Annual & surrender reports for the period 7/6/1996 to 18/05/2021.
An area with poor basement outcrop located approximately 60 km south of Tarcoola, which largely lies within the north-eastern corner of the Yellabinna Regional Reserve, is being explored primarily for possible economic fault or breccia-hosted...-
Document
-
Kulliparu. Annual reports and final report to licence expiry/full surrender, for the period 21/1/2010 to 20/1/2013.
An area located approximately 60 km east of Streaky Bay was taken up primarily because of old reports of gold prospectivity in the north of the tenement area at and near the historic Kattata mine. Marmota Energy considered that regional geological...-
Document
Published: 19 Feb 1913
-
Deception Hill. Annual reports and final report to licence full surrender, for the period 26/10/2004 to 9/10/2013.
The iron oxide - associated copper-gold (IOCG) mineralisation potential of an area centred ~20 km south of Tarcoola, which appeared to contain untested but interesting gravity and soil geochemical anomalies, was investigated by Minotaur to try to...-
Document
Published: 28 Oct 1913
-
Data release [made at SA Director of Mines’ discretion] : Pinkawillinie (part of the Eyre Peninsula Project). Annual reports to licence expiry/renewal, for the period 26/5/1997 to 25/5/2002.
A small licence area forming part of a contiguous set of project tenements in the central Eyre Peninsula region is being explored primarily for gold and base metals, that it is thought may occur in buried deposits conforming to the following...-
Document
Published: 05 Sep 1902
-
Toondulya Bluff. Annual reports to licence expiry/full surrender, for the period 14/1/2004 to 14/7/2013.
A licence area centred about 100 km north-east of Streaky Bay township, on the south-western perimeter of the Gawler Ranges, was taken up to explore for possible economic buried IOCG mineralisation or Tunkillia stye fracture controlled lode gold...-
Document
Published: 06 Nov 1913
-
Wudinna Hill. Annual reports submitted until the commencement of joint reporting for the nine licences comprising the Adelaide Resources - Newmont Australia Eyre Peninsula JV Project, for the period 11/11/1999 to 10/11/2002.
Reconnaissance surface calcrete sampling (13 samples), combined with the results of similar sampling conducted by other companies on earlier tenements that were held in the Wudinna area, disclosed four locations which are anomalous in gold and...-
Document
Published: 04 Jun 1903