-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
Uno Station. Progress reports and final report to licence expiry/renewal, for the period 10/9/1970 to 9/9/1971.
The discovery in July 1970 of a strong surface radioactive thorium anomaly emanating from outcrop near Uno Homestead, 48 km north-west of Iron Knob, which was made by a Japanese company's geophysical prospecting party, prompted the leasing of the...-
Document
Published: 10 Sep 1971
-
Gilles Downs (part of the Northern Eyre Peninsula Project). First annual report (prior to start of joint reporting status) for the period 8/7/2005 to 7/7/2006: and final report submitted at licence full surrender, for the succeeding period to 30/7/2015.
A licence area consisting of two separate sub-blocks located on the plains extending to the west of the Middleback Range on north-eastern Eyre Peninsula was taken up to explore for possible economic buried deposits of stratabound magnetite iron ore...-
Document
-
Yalanda Hill. Annual reports and final report to licence full surrender, for the period 5/12/2005 to 20/3/2014.
Exploration for possible economic deposits of primary uranium mineralisation, undertaken within the subject licence which is centred approximately 90 km south-west of Whyalla, initially consisted of a field reconnaissance using a spectrometer, and...-
Document
-
RB 2006/00004 Crustal evolution of the Gawler Craton, South Australia: Application of the TerraneChron technique to detrital zircon from modern stream sediments.
This report presents the results of a Terranechron [registered brand name for this proprietary technique] study of detrital zircons from modern stream sediments of the Gawler Craton. The Terranechron approach involves obtaining uranium - lead decay...-
Document
Published: 01 Feb 2006
-
Elliston, western Eyre Peninsula. Annual reports and final report to licence full surrender, for the period 21/2/1996 to 23/12/1998.
Diamond, gold and platinum group element (PGE) exploration activities carried out within an area of known kimberlitic and lamproitic intrusive rocks east of Elliston comprised aircore drilling (23 holes, total 1188 metres), addressing 17 out of 36...-
Document
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
Iron Knob. Progress report to licence surrender for the period 20/4/1972 to 23/7/1972.
Uranium exploration in a known uraniferous area located immediately north of Iron Knob comprised numerous ground radiometric survey traverses made across outcropping Mesoproterozoic rocks, mainly the Corunna Conglomerate. A thin phosphatic basal bed...-
Document
Published: 18 Jul 1972
-
RB 2021/00002 High precision CA-TIMS dating of the Hiltaba Suite, Gawler Craton.
This report provides a summary of high-precision chemical abrasion-isotope dilution-thermal ionisation mass spectrometry (CA-IDTIMS) U-Pb geochronology performed on zircon grains from five samples of Hiltaba Suite granites collected at locations...-
Document
Published: 01 Sep 2021
-
The Venus Bay Project. Respective joint annual and subsequent individual [for Venus Bay] annual reports to that remaining licence's expiry/full surrender, for the period 26/4/2002 to 16/9/2012.
Renewed diamond exploration has been conducted in a part of the western Eyre Peninsula where numerous kimberlite indicator mineral (KIM) anomalies occur in surficial sediments, and where the four adjoining licence areas involved lie in close proximity...-
Document
Published: 26 Nov 2012
-
Commonwealth Hill Station - East (part of the Commonwealth Hill Project). First partial surrender report, for the period 2/7/2007 to 1/7/2017.
Five small portions of the subject licence, with a combined total area of 143 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 2017
-
Fig Tree Corner, Ooldea South, Barton, Colona North, Ooldea Range and Pidinga (the Eucla Basin HMS Project tenement Group One). Joint annual reports for the period 1/3/2011 to 31/12/2015.
During the 2011-2012 joint reporting year, Iluka undertook drilling on ELs 3638, 3742 and 4544 with three aims: to extend the Typhoon HM deposit resource, to follow-up results of brownfields drilling at the Sonoran prospect, and to do further infill...-
Document
Published: 28 Feb 2016
-
RB 2007/00021 Compilation of SHRIMP U-Pb geochronological data for the Gawler Craton, South Australia, 2007.
This Report Book contains zircon U-Pb geochronological data obtained between December 2006 and June 2007, for rock samples derived from the Gawler Craton of South Australia. The geochronological study was undertaken as part of the National Geoscience...-
Document
Published: 01 Nov 2007
-
RB 2006/00020 Compilation of SHRIMP U-Pb geochronological data for the Gawler Craton, South Australia, 2006
This report book contains zircon - derived U-Pb geochronological data, which was obtained between January 2005 and April 2006, for basement rock samples taken from the Gawler Craton of South Australia. The data has been generated as part of the...-
Document
Published: 01 Nov 2006
-
RB 2008/00003 The Corunna Conglomerate, Gawler Craton: a review of the sedimentology and new U-Pb zircon geochronology.
The Corunna Conglomerate is a sequence of unmetamorphosed fluvial to shallow marine sediments, comprising conglomerates, sandstones and siltstones, which were deposited in active fault grabens in the eastern Gawler Craton. It is found on the...-
Document
Published: 01 Apr 2008
-
Poondinga, Jellabinna, Pureba North, Kalanbi, Penong, Chinta and Ceduna (the Eucla Basin Heavy Mineral Sands Project tenement Group 2). Joint annual reports for the period 2/11/2004 to 30/9/2015.
Iluka Resources’ Eucla Basin Heavy Mineral Sands Project tenement Group 2 consisted initially ELs 3268, 3283, 3322 and 3330, which spanned the south-eastern portion of the Eucla Basin, extending from 24 km to 140 km north of Ceduna. Regionally, the...-
Document
Published: 28 Feb 2016
-
Murat Bay (part of the Watraba Project). Annual reports and final report to licence full surrender, for the period 6/6/2005 to 3/4/2009.
Exploration of an onshore area located immediately north of Murat Bay aimed to discover beach or shallow marine placer concentrations of zircon-rich heavy mineral sands, possibly formed within significant thicknesses of prospective Upper Tertiary...-
Document
Published: 22 May 2009
-
Data release [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Annual, joint annual and combined annual reports for the period 4/1/1999 to 3/1/2009.
A renewed effort to determine the diamond mineral potential of the 15.6 square km of land comprising Flinders Island was instigated during January 1999, under tenure of EL 2577, by Orogenic Exploration Pty Ltd, a company related to the previous...-
Document
Published: 06 Jun 2009
-
Watraba (part of the Watraba Project). Annual reports and final report to licence full surrender, for the period 6/6/2005 to 3/4/2009.
Exploration of an onshore area located in the vicinity of Watraba aimed to discover beach or shallow marine placer concentrations of zircon-rich heavy mineral sands, possibly formed within significant thicknesses of prospective Upper Tertiary Ooldea...-
Document
Published: 20 May 2009
-
Data release - as updated [made at SA Director of Mines’ discretion] : Flinders Island and Flinders Island Coast. Joint annual reports for the period 4/1/2009 to 3/1/2019.
During licence Year 11, the lithological logs were digitised and are now presented for the remaining eight holes of the first drilling program (completed in 2002), together with the holes from the second (2003), and third (2004) drilling programs....-
Document
Published: 01 Mar 2019