-
RB 37/00143 Report on the geological reconnaissance survey of the southern portion of the Eucla Basin and of part of the Warburton Ranges.
The Eucla Basin (or Nullarbor Plains Basin) is the name that has been given to that sedimentary basin which corresponds to much the same area as the geographical region, the Nullarbor Plains of Australia. Since one of the major rock-types of the basin...-
Document
Published: 01 Jan 1954
-
RB 96/00011 Assessment of the Tertiary sand aquifer, County Musgrave Proclaimed Wells Area, Eyre Peninsula.
The groundwater resources of the Tertiary sand aquifer in the County Musgrave Proclaimed Wells Area (PWA) have been reviewed in order to assess the potential for their use to augment groundwater currently extracted from the unconfined Quaternary...-
Document
Published: 01 Apr 1996
-
Port Lincoln - Coffin Bay area. Progress report to licence surrender for the period 1/5/1969 to 28/11/1970.
Shallow pattern drilling on a two-mile grid (49 percussion holes for a total penetration of 2694 feet) has been carried out by BHP in the area between Port Linclon and Coffin Bay to assess the possible reserves and quality of aeolianite limestone rock...-
Document
-
Report on gravity survey Cook area, South Australia, on behalf of Minplex.
There is no abstract created for this record-
Document
Published: 01 Jan 1980
-
SADME / Amdel Project 1/1/232 : Officer Basin [South Australian portion] stratigraphic drilling project - petrographic sampling and analyses. Progress reports 3, 5 and 7 re. Wilkinson 1 drillhole.
32 rock samples, of unknown age, taken from the carbonate sequence intersected above the salt diapir section in SADME Wilkinson 1 stratigraphic drillhole, were examined petrographically to determine their possible depositional environment. Another 21...-
Document
Published: 24 May 1979
-
RB 66/00100 Limestone for railway ballast, Nullarbor Plain.
Ballast of moderate quality is won from an indurated fragmental limestone capping on the Nullarbor Plain. The assumption that ballast is available all over the Plain is valid, but the thickness of the cap rock zone varies from place to place. There is...-
Document
Published: 01 Jan 1968
-
RB 66/00118 Limestone for railway ballast on the Nullarbor Plain (with appendix on palaeontology).
Samples obtained from five quarry faces and one outcrop on the Transcontinental Railway are classified into 6 types of material, probably representing at least four generations ranging from Nullarbor Limestone to superficial material from the surface.-
Document
Published: 01 Jan 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports to licence expiry/renewal, for the period 1/9/2005 to 31/8/2010.
An area centred ~230 km north-west of Ceduna, in the far north-eastern corner of the Nullarbor Plain, and lying just south of the Ooldea railway siding on the Trans Australian Railway line, is being explored for possible economic buried deposits of...-
Document
-
Ifould Lake - Pidinga Lakes area. First partial surrender report at licence expiry/renewal, for the period 21/9/1972 to 20/9/1974.
As part of a search for possible economic sedimentary uranium mineralisation in the vicinity of Ifould Lake, an airborne radiometric survey of 700 line miles was flown at 2 mile line spacings, and 13 rotary holes with a total penetration of 464.8 m...-
Document
-
Chundie Swamps. Progress reports and final report to licence full surrender, for the period 29/11/1974 to 7/7/1976.
As part of a continued search for possible Proterozoic - Cainozoic unconformity - related, concealed sedimentary uranium deposits in an area of the Eucla Basin located 60 km north of Fowlers Bay, Pechiney conducted geological reconnaissance, ground...-
Document
-
Ifould Lake. Progress and final reports for the period 29/11/1974 to 4/8/1976.
10 reverse circulation holes were drilled, totalling 311 m. Surface radiometric effects were attributed to groundwater Ra and/or Rn, or to evaporitic concentrations of uranium daughter products. Results from drilling and from track etch (alpha)...-
Document
-
OEL 33. Technical reports and quarterly progress reports for the period 20/1/1964 to 19/1/1969.
There is no abstract created for this record-
Document