-
Data release [made at SA Director of Mines' discretion] : Manunda. Annual reports submitted until the commencement of joint reporting on the Razorback Ridge Iron Ore Project, for the period 10/12/2007 to 9/12/2009.
The banded iron formations associated with various tillite in South Australia have been recognised as being potential sources for iron however the low-grade nature of these bands has been one of the limiting factors in why they have not been...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Johns Outstation / Giffen Well. Annual reports for the period 8/10/2007 to 7/10/2018.
To date, land access restrictions imposed by the Commonwealth Department of Defence have prevented any field work from occurring on the subject tenement, taken up to cover the Giffen Well magnetite iron ore deposit and adjacent inferred prospective...-
Document
-
Mount Miccollo, Tin Hut Hill, Eurilla Dam, Wilcherry Hill, Uno, Peterlumbo and Mount Double (the Wilcherry Hill Project). Joint annual reports for the period 1/11/2002 to 31/10/2018.
During Year 6 of the project, Trafford Resources designed their drilling program to test the extent of the Pb/Zn/Ag/U mineralisation at the Telephone Dam Prospect, while JV partners Ironclad Mining’s drilling program was designed to define the Direct...-
Document
-
Bookabie. Annual reports to licence expiry/full surrender, for the period 8/10/2013 to 7/10/2016.
An area centred ~85 km west-northwest of Ceduna has ben explored for possible buried Ni±Cu±Co±Cr±PGE mineralisation of either Thomson Nickel Belt or Nova-Bollinger deposit styles, that may be associated with ultramafic–mafic rocks at four prospects...-
Document
Published: 07 Nov 1916
-
Data release [made at SA Director of Mines' discretion] : Lake Gilles. Annual reports submitted until the commencement of the Eurilla JV Project licences' joint reporting, for the period 30/1/2007 to 29/1/2010.
A sparsely drill-tested area centred about 10 km west of Lake Gilles is being explored for a variety of buried, possibly economic basement-hosted polymetallic mineralisation occurrences, including deposits of Menninnie Dam style Pb-Zn-Ag (Cu-Au),...-
Document
Published: 30 Mar 1910
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Data release [made at SA Director of Mines' discretion] : Bulgunnia (part of the Gawler JV Project). Annual reports for the period 19/11/1997 to 1/1/2013.
Within an area of the Wilgena and Christie Domains centred 40 km north of Tarcoola, exploration is continuing for Archaean to Proterozoic basement-hosted epithermal, hydrothermal and metamorphic type gold and base metal occurrences. Here an 841 square...-
Document
-
Davis Hill and Mount Wells (the Lake Gregory Project). Annual reports, joint annual reports and final report to licences' joint expiry/full surrender, for the period 5/11/2007 to 4/11/2012.
The two Lake Gregory project licences were located between the Birdsville Track and Lake Gregory, approximately 100 km north-northeast of Marree, and to the north of uranium exploration tenements held by Adavale Minerals. Regalpoint selected these...-
Document
Published: 03 Dec 1912
-
Data release [made at SA Director of Mines’ discretion] : Hawks Nest. Annual reports to licence expiry/renewal, for the period 12/3/1999 to 11/3/2004.
An area comprising two separate sub-blocks centred ~115 km south-southeast of Coober Pedy and located to the west of the Stuart Highway is being explored for Archaean to Palaeoproterozoic banded iron formation iron ore mineralisation of economic...-
Document
Published: 05 Feb 1904
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo (the Olary Creek Project). Annual reports for the period 15/11/2005 to 7/2/2019.
An area centred ~50 km south west of Cockburn is being explored for possible economic base and precious metal mineralisation that may have formed in buried Palaeoproterozoic basement rocks, as well as for any secondary uranium mineralisation that may...-
Document
-
Data release - as updated : Mount Grainger (part of the Flinders Ranges Diamond Project and the Nackara Arc Gold Project). Combined annual reports and annual reports to licence expiry/full surrender, for the period 6/2/2008 to 5/2/2017.
An area centred ~40 km east of Peterborough in the vicinity of Mount Grainger Goldfield has continued to be explored for possible small diamondiferous kimberlite bodies and for buried economic stratabound, structurally controlled and disseminated...-
Document
Published: 19 Sep 1916
-
Data release [made at SA Director of Mines' discretion] : Mount Davies (part of the Central Giles Nickel Project). Annual reports for the period 4/3/1999 to 23/9/2009.
A licence area located in South Australia's Far North-west Aboriginal Lands, and centred approximately 20 km to the south-east of the Surveyor Generals Corner at the borders of Western Australia, South Australia and the Northern Territory, has been...-
Document
-
Lake Gilles. Progress reports to licence expiry/full surrender, for the period 19/5/1969 to 18/5/1970.
Exploration for possible economic hypogene base metal sulphide deposits associated with poorly exposed iron-rich linear outcrops, overlying faulted Archaean to Palaeoproterozoic basement which is obscured by extensive Cainozoic sedimentary cover rocks...-
Document
Published: 01 Apr 1970
-
Mount Grainger (Oodla Wirra). Progress reports and final report to licence expiry/full surrender, for the period 8/10/1970 to 7/10/1971.
Extensive literature and geological and geochemical field investigations of historic mines and prospects at the Mount Grainger and Oodla Wirra Goldfields have failed to disclose any remaining economic gold occurrences. The sparse native gold occurs...-
Document
Published: 12 Oct 1971
-
Report on dolomite deposits at the Neales River, north-west of Lake Eyre North, SA.
Geological investigations have delineated a dolomite deposit extending at least 8 miles along the lower Neales River and exposed in its banks. An indicated resource of approximately 20 million tons is estimated to be present. It is considered that...-
Document
Published: 09 Jan 1970
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports for the period 1/9/2010 to 19/9/2018.
Due to catastrophic flood damage to Cosmo’s financial investments, no field work was undertaken during the twenty-first year of tenure under renewed EL 4565. In December 2010, Cosmo submitted to PIRSA a Declaration of Environmental Factors for its...-
Document
-
Bulgunnia Station (part of the Titan Base-Precious Metals Project). First annual report, plus final report to licence full surrender, for the period 10/4/2015 to 18/10/2016.
An area centred ~120 km south-west of Coober Pedy has been explored for possible economic buried gold and base metals mineralisation that may have formed within Proterozoic and older basement rocks. Mostly these are covered by the younger Jurassic...-
Document
Published: 15 Nov 1916
-
Bindyi South. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 24/11/2017.
An area located immediately south of Bindyi Homestead on Koonamore Station was taken up to explore for possible economic stratabound iron ore (magnetite) hosted by metamorphosed Adelaidean glacial sedimentary strata of the Yudnamutana Subgroup....-
Document
Published: 24 Nov 1917
-
Mount Hill - Koppio and Green Patch areas (part of the Southern Eyre Peninsula Project). Joint second and first respectively partial surrender report, for the period 6/8/2007 to 9/2/2017.
Five exploration licences on southern Eyre Peninsula have been explored by Centrex Metals for possible buried economic magnetite mineralisation. Portions of the two subject ELs were recently relinquished due to their perceived diminished prospectivity...-
Document
Published: 20 Jul 1917
-
Geological report no. 1 on the Cutana copper mine, Olary district, SA.
Secondary copper mineralisation at the Cutana copper mine appears to be limited to a length of about 30 feet at the surface, where historic workings have excavated a swell to 3 feet wide in a quartz-ironstone reef that otherwise narrows to 18 inches...-
Document
Published: 11 Feb 1971