-
RB 2008/00011 Definition of the Cultana Subsuite, Gawler Craton: a high level felsic Hiltaba Suite age intrusive with hydrothermal alteration and brecciation.
This paper provides a formal definition of the Cultana Subsuite, outlining the igneous petrology of the intrusion, its geochemical characteristics, and the nature of hydrothermal alteration and brecciation affecting the rocks. The Cultana Subsuite is...-
Document
Published: 01 Sep 2008
-
North Well Creek area. Quarterly progress reports and final report for the period 7/3/90 to 6/3/94.
Exploration, initially looking for rare metal elements within beryl, tantalite and ilmenorutile suite mineral occurrences, was carried out in the vicinity of diapiric breccia structures intruded by leucogranite in the area between Arkaroola Village...-
Document
-
Krystal (part of Edward Creek Project). Annual reports to licence expiry/full surrender for the period 14/2/2002 to 13/2/2005.
Diamond exploration carried out within an area lying to the south-southwest of the Peake and Denison Ranges has aimed to find potential kimberlite sources for nine diamonds, previously recovered by De Beers from surface bulk samples, that were...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Joint annual reports for the period 1/1/2008 to 31/12/2010.
In an agreement with Oxiana, Toro Energy Limited has Uranium rights covering the Project area. In 2008, exploration activities within tenements comprising the Mount Woods Project targeted iron oxide copper gold (IOCG) style mineralisation. Drilling...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 3 of 4 ].
During July 2000, the Minotaur Resources Ltd / Billiton Exploration Australia Pty Ltd mineral exploration alliance entity agreed to farm into the four Coober Pedy Project tenements held by Normandy Exploration (80%), Sons of Gwalia (13%) and Sabatica...-
Document
-
Data release [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker and The Twins (the Mount Woods Project). Progress and combined annual reports for the period 27/11/1987 to 31/12/2007. [ Index Part 4 of 4 ].
In 2006, work completed on the Prominent Hill Project in the reporting period included drilling of 17 RC holes for 4,255 m and 46 mud/diamond holes at Prominent Hill prospect for 14,301.5 m. The drilling at Prominent Hill intersected wide zones of...-
Document
-
Bob Nob prospect, Mount Painter district. Progress and final reports to claim option relinquishment, for the period 2/6/1968 to 1/10/1969.
Investigation of reported radiometric anomalies associated with sub-economic iron mineralisation at the Bob Nob prospect, which is situated approximately 8 miles north-west of Arkaroola Homestead, has comprised ground magnetics and scintillometry with...-
Document
-
RB 79/00119 Relogging of diamond drillhole MM14, Mutooroo mines (with appendix of petrographic report by Pontifex and Associates Pty Ltd on Diamond Drill Holes MM15 and MM21A).
The deepest yet completed, diamond-cored base metal exploration hole in South Australia (DDH MM14 : total depth 5312 feet = 1619.1 m) was drilled on a moderately dipping trajectory at the historic Mutooroo mines, as part of copper exploration being...-
Document
Published: 16 Jul 1979
-
Examination of gossan samples from the Gunsight prospect, Mount Painter area, South Australia.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Report relating to follow-up work in Jubilee Fault and P-CV areas Nov 1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Plumbago - Glenorchy area [= Olary 'B' Farmin Block]. Progress and final reports to licence expiry/full surrender for the period 10/2/1972 to 9/2/1973.
In a search for possible remaining economic primary or secondary uranium deposits in an area of known such mineral occurrences located around Mount Victoria, a consultant was engaged by Esso Minerals to conduct detailed 1:12,000 scale geological...-
Document
-
Ethiudna [= Olary 'B' Farmin Block]. Progress reports to licence expiry/renewal for the period 14/1/1971 to 13/1/1972.
Exploration carried out mainly to look for possible large primary deposits of uranium ore in localities surrounding Ethiudna Hill initially addressed the potential of several hard rock showings of uranium mineralisation which had been found by...-
Document
-
Alberrie Creek (part of the Willouran Ranges Project). Annual reports plus final report to licence full surrender, for the period 9/7/2012 to 22/11/2019.
An area centred ~55 km west of Marree has been explored for possible buried economic stratiform copper and magnesite mineralisation. During the first licence year, no work occurred while Native Title land access negotiations were in progress. During...-
Document
Published: 26 Nov 2019
-
Harris Bluff. Annual reports plus final report to licence expiry/full surrender, for the period 21/6/2006 to 18/10/2015.
An area located immediately north of Lake Gilles and centred on Harris Bluff in the Uno Range was taken up to explore for possible buried unconformity style uranium mineralisation which could have formed at the base of the Corunna Conglomerate, and...-
Document
Published: 29 Sep 2015
-
Mount Craig (part of the Torrens Project). Annual report and final report to licence expiry/full surrender, for the period 1/8/2011 to 31 July 2013.
A search primarily directed at assessing the stratiform copper potential of a small area centred 16 km north-east of Cradock consisted only of office studies comprising the collection and review of open file geoscientific data.-
Document
Published: 17 Nov 2013
-
Yudnamutana Hill. Progress reports and annual reports to licence expiry/full surrender, for the period 20/5/1980 to 15/2/1995.
Base metal and gold exploration undertaken over a lengthy period since 1980 in the Yudnamutana Hill area, 20 km north-west of Arkaroola, has comprised detailed geological mapping of major basement and cover stratigraphic units and known mineral...-
Document
-
Wharton Hill (near Manna Hill). Progress reports and final report to licence full surrender, for the period 12/1/1981 to 11/7/1981.
As part of a regional search for diamondiferous kimberlite, stream sediment sampling of ?54 sites in the Wharton Hill area failed to reveal any kimberlite indicator minerals. However, heavy mineral concentrates from samples taken at four sites in the...-
Document
-
Mount Norwest. Annual reports and final report to licence full surrender, for the period 19/6/2014 to 14/12/2017.
An area located in the south and central Willouran Ranges, and centred ~45 km south-west of Marree, has been explored for possible buried economic Neoproterozoic stratiform copper mineralisation and inferred MVT, replacement or diapir-related other...-
Document
Published: 24 Jan 2018
-
Coober Pedy. Annual reports and final report to licence expiry/full surrender, for the period 20/10/2005 to 19/10/2009.
In a search conducted over an area lying beyond but near the southern edge of Coober Pedy township, looking primarily for possible economic buried Mesoproterozoic basement-hosted copper-gold deposits of predominantly IOCG type, the licensee Nova...-
Document
Published: 31 Jan 2010
-
Data release - as updated : Nuckulla Hill, Lake Gairdner and Kondoolka (the Nuckulla Hill Gold Project). Joint annual reports and final report to licences' joint full surrender, for the period 25/8/2009 to 23/3/2018.
The Nuckulla Hill Au-Ag Project, originally consisting of three exploration licences covering 640 square km, is located approximately 115 km north-east of Ceduna in South Australia, and covers approximately 60 km strike length of the mineralised...-
Document
Published: 16 Oct 2017