-
Yalarna. Progress reports and final report to licence expiry/full surrender, for the period 4/9/1980 to 3/9/1982.
In a search for East Alligator River - type metamorphic uranium deposits, a review of previous geophysical data plus the conduct of ground and airborne radiometric surveys disclosed a number of anomalies in an area on central Eyre Peninsula extending...-
Document
-
RB 90/00074 Explanatory Notes for the ELLISTON 1:250 000 map sheet.
There is no abstract created for this record-
Document
Published: 01 Nov 1990
-
RB 91/00041 Geology of the KINGOONYA 1:250 000 map sheet area.
Extensive field geological mapping, augmented by petrological and geochemical studies, reinterpretation of company drilling and water-bore logs and a nine-hole drilling programme has detailed the geology of the KINGOONYA area. The stratigraphy spans...-
Document
Published: 01 Apr 1991
-
RB 90/00065 Explanatory Notes for the STREAKY BAY 1:250 000 sheet.
There is no abstract created for this record-
Document
Published: 01 Oct 1990
-
RB 96/00024 Gawler Ranges drilling report 1994.
The Mesoproterozoic Gawler Range Volcanics - Hiltaba Granite Suite - related Olympic Dam style Cu-U-Au mineralisation, and Menninnie Dam replacement style Pb-Zn-Ag mineralisation, have served to raise the prospectivity of rocks in and underlying the...-
Document
Published: 12 Sep 1996
-
Tarcoola. Data release made in lieu of a 25% first partial relinquishment at licence renewal: [Part 1 of 2] progress reports for the period 7/6/1978 to 19/4/1984.
In 1978 exploratory rotary drilling (11 holes, total 629 m) for inferred sediment-hosted roll-front uranium orebodies buried beneath salt lake topographic depressions east of Tarcoola intersected low levels of uranium (max 14 ppm) at fresh water /...-
Document
-
Warrior. Progress reports to licence full surrender, for the period 28/7/1982 to 30/3/1987.
Continuing investigation of the sedimentary uranium potential of the Tertiary Warrior Palaeochannel, in an area 40 km west of Tarcoola, initially comprised undertaking a test radon emanometry survey over a site of known uraniferous roll-front...-
Document
-
Wirrida. Progress reports and final report to licence expiry/full surrender, for the period 21/4/1980 to 6/6/1983.
A large area centred ~95 km north of Tarcoola was explored initially by grant licensee Afmeco for possible buried economic epithermal / hydrothermal / fault controlled primary uranium mineralisation that may have formed in outcropping or shallowly...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Yarranna Hill (part of the Narlaby Palaeochannel Project). Data release made in lieu of submitting a first partial surrender report: progress reports for the period 25/10/1979 to 30/6/1981.
Drilling of 490 rotary drillholes (total 43,000 m) in EL 539, the majority being located on a 200 m grid spacing, has revealed the western end of a major Tertiary palaeochannel system, and has intersected significant and widespread subsurface uranium...-
Document
-
Ilkina, Acraman, Yarranna Hill, Poondana Rock, Waddikee Rocks, Mount Sturt, Yaninee, Nunjikompita, Poochera, Wandana and Smoky Bay (Narlaby Palaeochannel area). Combined progress and technical reports for the period 5/1/81 to 31/12/83.
Carpentaria's exploration for sandstone type uranium deposits in the West Coast region of SA over the period 1979-1982 has revealed a major Tertiary buried palaeochannel system. The main Narlaby Palaeochannel is 170 km long, up to 10 km wide and is...-
Document
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 22/5/1978 to 10/8/1981.
The base metal and uranium potential of a concealed Proterozoic basement high near Bulgunnia Homestead was evaluated using geological and hydrogeochemical reconnaissance and regional geophysical interpretation approaches. Seismic, ground magnetic and...-
Document
-
RB 2021/00001 Precise zircon U-Pb geochronology of Hiltaba Suite granites, Point Riley, Yorke Peninsula.
This report provides a summary of high precision chemical abrasion - isotope dilution thermal ionisation mass spectrometry (CA-IDTIMS) U-Pb geochronology which has been performed on zircons from three samples taken from the eastern Gawler Craton. The...-
Document
Published: 01 May 2021
-
Data release [made at SA Director of Mines' discretion] : Stuart Shelf. Progress reports, annual reports and final report to licence renewal / re-issue, for the period 17/6/1986 to 15/9/1996.
On 21/11/1986, Western Mining Corp. (WMC) signed a joint venture agreement with PNC Exploration (Australia) Pty Ltd [a subsidiary of the Power and Nuclear Fuels Corp. of Japan], whereby PNC can earn up to 25% equity in EL 1338 by funding exploration...-
Document
-
Tanner Dam North. Final report at licence full surrender, for the period 22/11/2012 to 26/2/2014.
An area centred approximately 130 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document
-
Tanner [Dam]. First annual report plus final report to licence expiry/full surrender, for the period 21/12/2011 to 20/12/2013.
An area centred approximately 120 km north-northwest of Kimba has been explored for possible economic primary uranium mineralisation, where the principal target is the igneous rock succession of Mesoproterozoic Gawler Range Volcanics (GRV) and...-
Document
-
Nalara Rockhole. Progress reports and final report to licence expiry/full surrender, for the period 20/7/1981 to 19/7/1982.
Over an area of small salinas located approximately 100 km south-west of Tarcoola, near the margin of the Gawler Block outcrop, 6 rotary air/mud holes totalling 231 m (part of a planned programme of 16 holes) were drilled to basement to test for coal...-
Document
Published: 20 Sep 1982
-
Bookabie. Annual report for the period 18/3/97 to 17/3/98.
Reconnaissance drilling undertaken between Bookabie and Coorabie on western Eyre Peninsula comprised 8 RAB holes totalling 259 m and 41 aircore holes totalling 2448 m. Many holes were abandoned before reaching basement due to running sands, water...-
Document
-
Wedge Hill (Mount Wedge Project). Annual and final reports for the period 26/5/1997 to 25/5/1999.
Groundwater sampling, aeromagnetic interpretation, shallow auger sampling and isotope studies were carried out over an area 30 km northeast of Elliston. Heavy mineral concentrates from composite auger samples contained zircon, galena and sphalerite,...-
Document
-
PACE Copper Gawler Craton Airborne Survey, Region 6, data package.
During fine weather intervals within the period 31 July 2018 to 23 January 2019, the southern half of the GAIRDNER 1:250k map sheet area and the northern half of the YARDEA 1:250k map sheet area were flown under contract to the SA Government and...-
Dataset
- PDF,
- ZIP