-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
RB 90/00077 Skeleton 2. Well completion report.
Skeleton 2 penetrated sediments of the eastern Lake Eyre Basin, the Frome Embayment, and granitic basement of the Mount Painter Ridge. The hole records the southernmost known occurrence of Cadna-owie Formation in the Frome Embayment. Unexpectedly,...-
Document
Published: 01 Dec 1990
-
Data release made at renewal of the Sturt Joint Venture Project ELs 4062 through 4090, in lieu of submitting a joint partial surrender report for them : joint annual reports, for the period 25/2/2008 to 24/2/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
-
Mulyungarie (part of the Yarramba Joint Venture Project). Data release upon first partial surrender and in consequence of a transfer of licence ownership : progress and technical reports for the period 4/7/1978 to 2/5/1991. [ Index Part 1&2 of 2 ].
Continuing exploration for sedimentary uranium occurrences in the buried Tertiary Yarramba Palaeochannel, undertaken between 1978 and 1982 by a Mines Administration (Minad) - led consortium, comprised reconnaissance and infill traverse- based open...-
Document
Published: 31 May 1992
-
RB 2018/00001 Regolith hand specimen atlas for South Australia
This regolith material hand specimen atlas displays 246 images of 212 regolith samples which have been collected over the last 30 years by the authors, present and past Geological Survey of South Australia (GSSA) staff and members of the Cooperative...-
Document
Published: 01 May 2018
-
Sturt Joint Venture Project. Final report at 14 (of 18) project licences' combined surrender, for the period 25/2/2008 to 31/12/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
Published: 30 Apr 1914
-
EL 4005 - EL 4011, Lake Blanche Project. Combined annual technical reports for the period 16/12/2007 to 16/12/2011.
The Lake Blanche Project lies on the western edge of the Eromanga Basin in South Australia to the north Frome Embayment. The Eromanga Basin of central Australia is a major oil-producing, sedimentary basin of Mesozoic age. Sediments in this basin...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Blanchewater Hill, Camp Hill, Murnpeowie and Ooloo Hill (the Marree Uranium Project). Joint annual reports for the period 10/8/2005 to 9/8/2016.
An extensive area of Tertiary Lake Eyre Basin and Mesozoic Eromanga Basin sediments lying immediately to the north of the uranium-rich Mount Babbage and Mount Painter inliers is being explored for possible economic roll-front style palaeochannel...-
Document
Published: 15 Dec 1916
-
RB 2015/00010 Geological field excursion guide — Arkaroola to Paralana Hot Springs.
The journey from Arkaroola Village to the Paralana Hot Springs presents the opportunity to view some amazing landscapes and associated geological aspects that the Arkaroola Pastoral Station has to offer, and the opportunity is open to the general...-
Document
Published: 01 May 2015
-
RB 2012/00004 MARREE, South Australia, [geological map] sheet SH54-5. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The MARREE mapsheet area includes the south-western portion of the Strzelecki Desert plus parts of the Tirari Desert, north-western Flinders Ranges and north-eastern Willouran Ranges, between latitudes 29 to 30 degrees S and longitudes 138 to 139...-
Document
Published: 01 Apr 2012
-
Honeymoon Uranium Project update.
The Honeymoon and East Kalkaroo sedimentary uranium deposits, located approximately 400 km north-east of Adelaide and 75 km north-west of Broken Hill, are natural concentrations of uranium minerals occurring in the Tertiary age Yarramba Palaeochannel,...-
Document
-
ExpNotes MARREE: Explanatory Notes MARREE
A new generation, second edition MARREE 1:250 000 scale geological map and its explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's latest geological mapping program (1993 to...-
Document