The Eyre Peninsula Joint Venture Project. Joint annual reports for the period 19/9/2002 to 31/12/2008.
A number of tenements on central northern Eyre Peninsula are being explored by Adelaide Resources and its joint venture partner Newmont Mining for possible economic buried deposits of gold, copper and other base metals which may have formed in the...-
Document
Published: 27 Feb 2009
-
Murninnie. Annual reports and final report to licence expiry/full surrender, for the period 19/4/2006 to 14/11/2013.
During August 2006, Australasia Gold acquired a 45% interest in the historic abandoned Murninnie copper mine (Private Mine 156) and a surrounding small exploration licence (EL 3542), which are located ~30 km south-southwest of Whyalla. In July 2007,...-
Document
Published: 13 Oct 2014
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Frome. Annual reports for the period 18/10/2013 to 17/10/2016.
An area abutting the south-western edge of Lake Frome and the southern boundary of the Gammon Ranges National Park, that is centred ~60 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone...-
Document
Published: 09 Dec 2016
-
The Lake Torrens Project; plus the Olympic Domain Project. Joint annual reports for the period 1/1/2006 to 31/12/2010.
Licensee Copper Range originally took up a group of three tenements located in central South Australia covering areas within and west of Lake Torrens, with the intent, much reinforced following the Carrapateena deposit discovery made in 2005, of...-
Document
Published: 04 Mar 2011
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs (part of the Olary Project). Annual reports to licence expiry/renewal, for the period 22/10/2007 to 21/10/2012.
An area centred ~30 km south-east of Olary township is being explored for possible buried economic porphyry copper-gold deposits, as well as for any other substantial either Carlin-type, skarn-hosted, Telfer-style, or mesothermal gold mineralisation....-
Document
Published: 16 Nov 2012
-
Alford West. Final report, Project ADI RD03-386 [Accelerated Discovery Initiative Round 3, 2023].
“Defining Attributes for In-Situ Recoverable Cu Mineralisation by Geophysical Surveying” This Accelerated Discovery Initiative funded project sought to explore whether non invasive geophysical techniques can provide valuable insight into...-
Document
Published: 30 Jun 2023
-
Andamooka Ranges, Island Dam and Stuart Shelf (part of the Stuart Shelf Project). Joint third partial surrender report, for the period 16/1/1981 to 25/9/2018.
There is a long history of exploration on the subject three Stuart Shelf tenements, with first tenure originally taken up in 1981. A summary of significant exploration activities conducted on the three now relinquished ground portions is believed by...-
Document
Published: 22 Nov 2018
-
Data release - as updated [made at SA Director of Mines' discretion] : Port Augusta Project. Joint annual reports for the period 8/5/2013 to 7/5/2018 and subsequent expiry/full surrender reports to 6/10/2023.
Two small adjacent areas located 25 km north of Port Augusta, on the south-eastern Stuart Shelf close to the Torrens Hinge Zone, are being explored for possible buried economic IOCG style mineralisation which could have formed within inferred deep and...-
Document
Published: 14 Jul 2018
-
Data release - as updated : Reaphook Hill. Licence-specific annual reports to the commencement of Frome Basin Project joint reporting, plus final report to licence expiry/full surrender, for the overall period 24/7/2013 to 11/1/2022.
An area on the south-western edge of the Frome Embayment, that is centred ~100 km south of the Beverley uranium mine, has been taken up to explore for possible buried palaeochannel and sandstone hosted roll front style secondary uranium mineralisation...-
Document
Published: 06 Jul 2021
-
Netley Gap. Annual reports and final report to licence expiry/full surrender, for the period 6/7/2016 to 5/7/2019.
A small licence comprising two separate sub-blocks located 4 km and 22 km south-east of Winnininnie on the Barrier Highway has been explored for possible buried economic, epithermal/hydrothermal structurally controlled copper-gold mineralisation that...-
Document
Published: 04 Sep 2019
-
Warriner Creek and Trumpeter (part of the Lake Eyre Joint Venture Project). Annual reports plus later combined annual reports to licences' joint full surrender, for the period 20/12/1999 to 22/9/2010.
Exploration for possible economic buried iron oxide - associated copper-gold (IOCG) deposits in two areas located approximately 100 km south-east of Coober Pedy has sought to delineate and test a number of linear and elliptical geophysical anomalies...-
Document
Published: 05 Aug 2010
-
Pyramid Bore. Annual reports and final report to licence full surrender, for the period 8/7/2005 to 5/1/2010.
An area located approximately 10 km north of Glendambo has been explored for possible economic buried uranium deposits which might be indicated by aerial radiometric anomalies associated with playa lakes in the region, since these latter mark zones of...-
Document
Published: 20 May 2010
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-31 - Peterlumbo Hill area, Eyre Peninsula, skarn and/or porphyry type Mesoproterozoic epithermal Cu-Au and Ag-base metal prospects. Drilling final report.
Investigator Resources (IVR) applied on 30/1/2015 to participate in the PACE Initiative Year 8 (2015) collaborative drilling grant program between industry and government being administered by DSD. The application for subsidy funds submitted by IVR...-
Document
Published: 20 Jan 2016
-
Peltabinna Hill. Annual reports, plus final report to licence expiry/full surrender, for the period 2/5/2013 to 1/5/2017.
An area located along the south-south-western margin of the Gawler Ranges volcanic province has been explored for possible economic buried copper-gold and/or base metal mineralisation which might have been emplaced during the early stages of the...-
Document
Published: 29 May 2017
-
Data release - as updated [made at SA Director of Mines’ discretion] : Mount Yerila. Annual reports for the period 27/8/2009 to 26/8/2015.
During the 2009-2010 licence year, 8 vertical open rotary mud drillholes, YR035 to YR042, were completed along two drill traverses for a total penetration of 1614 m. They were designed to intersect the Eyre Formation adjacent to interpreted faults in...-
Document
Published: 10 Sep 2013
-
Commonwealth Hill Station - Central (part of the Commonwealth Hill Project). Second partial surrender report, for the period 11/5/2007 to 10/5/2017.
Six separate portions of the subject licence, with a combined total area of 35 square km, have been surrendered due to their now perceived diminished prospectivity for iron ore, gold, uranium, PGEs and base metals. During the period of their tenure,...-
Document
Published: 04 Dec 2017
-
Data release - as updated [made at SA Director of Mines' discretion] : the Tarcoola and Theseus Projects. Joint annual reports for the period 1/1/2015 to 31/12/2018.
During the fourth year of project licences' joint reporting, for the Theseus Project, Endeavour undertook further RC and diamond core drilling at the Minos prospect on EL 5280, and did detailed auger calcrete geochemical sampling over the Lake...-
Document
Published: 21 Feb 2019
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-19 - Golden Cross Operations Pty Ltd, Coober Pedy Project, G2 Lineament Corridor gravity/magnetic anomaly IOCG targets. Drilling project final report.
Golden Cross Operations Pty Ltd ('Golden Cross') commenced mineral exploration activities in South Australia with the objective of discovering significant IOCG deposits with the potential to support a major mining operation. In mid-2009, four tenement...-
Document
Published: 25 Nov 2013
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-05 - Areva Resources Australia Pty Ltd, Denison Range Project, eastern flank Mesozoic sandstone-hosted uranium targets. Drilling project final report.
Areva's Denison Range Project is targeting possible economic sandstone-hosted uranium mineralisation that may have formed within the Mesozoic sandstones located to the east of exposed uranium-rich basement rock sequences of the Palaeo- to...-
Document
Published: 29 Aug 2013
-
Data release - as updated : Mount Irwin (part of the Alcurra Project). Annual reports plus final report to licence expiry/full surrender, for the period 25/6/2013 to 24/6/2021.
An area in the eastern Mugrave Ranges centred ~75 km south-east of Kulgera is being explored for possible buried economic magmatic Ni-Cu-PGE mineralisation hosted by inferred Proterozoic Giles Complex layered ultramafic intrusions, and also for...-
Document
Published: 22 Jul 2021