Rudall. Progress and final reports to licence surrender for the period 10/9/1971 to 9/9/1972.
In a search for possible economic primary or secondary uranium deposits in the Rudall area, five streambed mud samples and 2 springwater samples from the Driver River drainage basin were analysed for Central Pacific Minerals by the Australian Atomic...-
Document
Published: 02 Nov 1972
-
Kalabity. First annual report for the period 22/7/1968 to 21/7/1969.
Exploration for possible economic primary and secondary uranium deposits, within an area extending for 50 miles north-westwards from Cockburn and Mingary, has consisted of the first-time (for this locality) acquisition by the licence operator of an...-
Document
-
RB 78/00073 Land use conflicts. Plumbago pastoral lease and historic reserve.
Discusses impact of mineral exploration on Aboriginal historic sites with pictorial record of principal areas of concern.-
Document
Published: 01 Jan 1978
-
Beverley Uranium Project - Environmental Impact Statement, June 1998, and related reports.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Kainton, Melton and Paskeville (the Melton Project). Joint annual reports for the period 27/8/2007 to 26/8/2019.
Exploration for possible buried sandstone-hosted uranium mineralisation which could have formed within early Tertiary palaeochannel sediments of the northern Saint Vincent Basin is being carried out in a small area near Kainton on north-eastern Yorke...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Ooldea. Annual reports for the period 1/9/2010 to 19/9/2018.
Due to catastrophic flood damage to Cosmo’s financial investments, no field work was undertaken during the twenty-first year of tenure under renewed EL 4565. In December 2010, Cosmo submitted to PIRSA a Declaration of Environmental Factors for its...-
Document
-
Frome Downs Homestead. Progress and technical reports to licence expiry/renewal, for the period 1/1/1969 to 31/12/1970.
Reconnaissance shallow stratigraphic drilling with subsequent borehole geophysical electric and radioactivity logging in the south-western Frome Embayment (21 rotary mud partly cored holes, total 8841 feet), over areas lying adjacent to outcropping...-
Document
Published: 31 Dec 1970
-
Honeymoon project - hydrological report on the HC 9 pumping test conducted February-March, 1980.
Regional and site-specific geological and hydrological factors are discussed, and a groundwater model is proposed for the Honeymoon uranium deposit, based on the results of the HC 9 drilling and testing programme, and on other existing data. A...-
Document
-
Preliminary [mining] feasibility study [for the] Lake Frome uranium orebodies. Final report.
Report presents the results of a preliminary study of the commercial feasibility of producing yellowcake from the Beverley sedimentary uranium deposit located near Lake Frome. All of the available drillhole data for this deposit was examined and...-
Document
-
Mount Chandler (Musgrave Ranges Project). Annual and final reports for the period 11/11/1996 to 10/11/1999.
Cu-Au-U prospects associated with shear zones and Kulgeran age granites have been identified in an area approximately 60 km north-west of Marla. Best assay results were obtained from the Indulkana Shear Zone, where rock chip sampling returned up to...-
Document
-
A preliminary assessment of the Four Mile uranium prospect.
In June 2005, Lindsay Curtis was engaged by Quasar Resources and Alliance Development to prepare an expert preliminary report on the prospectivity of the so-called "Beverley 4-Mile" sedimentary uranium mineralisation occurrence, which the joint...-
Document
-
Cootanoorina Hill. Data release made in lieu of submitting a partial surrender report at licence expiry/renewal : annual reports for the period 6/4/2010 to 5/4/2015.
No work took place on the subject licence area, located ~ 60 km south of Oodnadatta on the western side of the Peake and Denison Ranges, during its first four years of tenure. It had been taken up originally to explore for possible undercover roll...-
Document
-
Mount Darling. First annual report plus final report to licence expiry/full surrender, for the period 8/12/2014 to 7/12/2016.
An area located in the far north of South Australia, abutting the Northern Territory border, and centred ~30 km east of the Stuart Highway on Tieyon Station, has been explored for possible economic buried secondary uranium deposits, which it was...-
Document
-
Interpretation of geophysical data from EL 923 area.
5 prospective areas delineated from qualitative appraisal of available geophysical data, include basement base metal targets, Cambrian carbonate areas and 1 Tertiary palaeochannel target for uranium.-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium for the period 11/10/1996 to 10/10/2009 [ Index Part 1 of 2 ].
The four Stuart Shelf Joint Venture Project exploration licences collectively cover approximately 2668 square km of semi-arid pastoral land surrounding the Olympic Dam mine and extending east and south-eastwards as far as Lake Torrens [the Olympic Dam...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : North Roxby and Acropolis South. Joint annual reports, plus EL 3762 fifth annual report to licence sale, for the period 4/5/2009 to 3/5/2012.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 3761 (North Roxby) and EL 3762...-
Document
-
Preliminary report on the re-appraisal of the Crocker Well Original prospect, SML 210.
As part of a company re-appraisal of previous, South Australian Department of Mines' 1951-1959 uranium exploration data for the Crocker Well Original uranium deposit, E-Z has re-assessed the geological parameters of this deposit in order to confirm...-
Document
Published: 14 Jul 1969
-
Culberta Bore. Progress and final reports to licence expiry/renewal for the period 26/1/1978 to 25/1/1980.
The potential for finding economic Olympic Dam style copper-uranium mineralisation beneath the Strzelecki Desert cover in an area located 30 km east of Lake Frome was investigated by a review of prospectivity factors, and by the acquisition of...-
Document
Published: 11 Apr 1980
-
RB 00063 The Radium Hill Mining Field.
Uraniferous lodes at Radium Hill occur as shear replacements and infillings along overthrust type fractures developed within a domed anticline (northeast-southwest major axis) in granitised metasediments. At least three major shear zones have...-
Document
-
RB 00275 Wild Dog uranium prospect. 9th progress report.
During the period reported, underground excavation of an inclined heading was commenced on the No. 1 lode, and 64 wagon (percussion) drill holes and three diamond drill holes were completed, with two diamond holes still in progress. A ground...-
Document