-
RB 33/00082 Williamstown clay mine - report on a further inspection of the Warren refractory shale.
The mine was visited on Wednesday May 21st to select sites for drilling the cream clay shale known as the Warren Refractory Shale, so that a better estimation or reserves of this material might be calculated.-
Document
Published: 22 May 1952
-
Mount Gunson Project. Mount Gunson township - Surveying and engineering plans for proposed town services layout, plus miscellaneous mine plans.
There is no abstract created for this record-
Document
-
Mount Gunson Project. East Lagoon orebody - Intended mining plans.
There is no abstract created for this record-
Document
-
Northern Adelaide Plains groundwater review.
The availability of good quality groundwater from two Tertiary confined aquifers (T1 and T2) under the Northern Adelaide Plains (NAP) has encouraged the development of over 3000 hectares of horticulture in the area since the 1950s. At present,...-
Document
-
Improvement in groundwater supplies at the communities of Kalka, Amata, Mimili and Kenmore Park, Anangu Pitjantjatjara Lands, South Australia.
The community water supplies at Kalka, Mimili and Kenmore Park in recent times were insufficient for emergencies, while the wells at Amata were in poor condition. In this remedial work program, drilling of three new wells at Kalka has doubled the...-
Document
-
Curnamona (part of the Siccus JV Project). Annual reports and final report to licence surrender, for the period 4/8/1997 to 7/11/2001.
Sedimentary uranium orebodies within Tertiary palaeochannels were the target of exploration in the area of the Siccus River, south of Lake Frome. Extensive research into available open file past exploration data allowed the identification of both...-
Document
-
Beverley Uranium Project - Groundwater resources, management and monitoring.
The technical development and operational commencement stage of the Beverley in situ leach uranium mining project are herein discussed from the viewpoint of hydrogeological factors. The author summarises the uranium deposit's hydrogeological setting...-
Document
-
SA/Vic Border Groundwater Review Committee - Five-year technical review, 1996 - 2000.
The Groundwater (Border Agreement) Act of 1985 provides the legislative framework for the joint management of the groundwater resources along the South Australia/Victoria State border. The Act established a 40 km wide Designated Area along the...-
Document
-
Childara. Annual reports and final report to licence expiry/ full surrender, for the period 31/10/1995 to 30/10/2001.
Exploration over the licence area was severely restricted due to its being located entirely within the Yellabinna Regional Reserve, and because of unresolved Native Title claims. Initially, acquisition of a detailed aeromagnetic survey, comprising...-
Document
-
Domes and diapirs, mineral exploration, Central Flinders Zone, Adelaide Geosyncline.
This paper synthesizes the findings of Frontier's exploratory efforts over the past three years, and makes recommendations for an ongoing exploration programme following and consequent to the economically unsuccessful outcome of drilling Blinman nos 1...-
Document
-
Vertical groundwater recharge to the Tertiary confined sand aquifer, South-East, South Australia.
Groundwater flows mainly through two major aquifer systems: a regionally unconfined aquifer, and an underlying confined aquifer. The two aquifers are separated by a low permeability confining bed (or aquitard). Determining the degree of hydraulic...-
Document
-
Mount Ogilvie. Technical, annual and final reports to licence expiry for the period 14/2/97 to 22/5/2003.
Photo lineament analysis of an area centred on Mount Ogilvie, 30 km north-east of Leigh Creek, identified several targets considered to be potentially prospective for mineralisation. During a brief field visit seeking work clearance from native title...-
Document
Published: 23 Jul 1903
-
Impact of farm dams on streamflow in the Mount Lofty Ranges - A literature review.
The state of water resources in the Mount Lofty Ranges has been the subject of discussion for at least 10 years. As early as 1989, it was suggested that controls were necessary to restrict the development of specific activities where it could be...-
Document
-
Design and costing study for a proposed zinc silicate ore direct leaching plant to be built at Risdon, Tasmania, to treat Beltana mine concentrates.
Report details engineering designs, drawings and costings for a new commercial scale leaching plant intended by E-Z to treat 70,000 tons/year of its crushed Beltana willemite ore having an average feed grade of about 40% Zn. The enriched, dissolved...-
Document
-
E-Z Beltana Project feasibility study, 1972. Part 2A - Crushing and grinding.
The run-of-mine ore from Beltana requires size reduction prior to introduction to any further process, whether it be a beneficiating or extractive process. Two methods of extraction are being considered: namely, leaching, which requires beneficiation...-
Document
-
Willouran Hill. Annual reports and final report to licence expiry/full surrender, for the period 24/8/1998 to 23/8/2000.
A review of previous exploration indicated prospectivity for secondary Cu mineralisation near old workings in the Willouran Hill area, approximately 20 km south-west of Marree. A more systematic evaluation of anomalous Au was also considered to be...-
Document
-
Mount Gunson Project. Main Open Cut mine - Intended mining plans.
There is no abstract created for this record-
Document
-
Southern Fleurieu Water Resource Forum - Water resource assessments.
An assessment of the water resources of the southern Fleurieu Peninsula has been carried out in response to concerns raised by local government and the community regarding the use and management of water resources in the region. This report discusses...-
Document
-
Hydrogeological report on water well monitoring in Aboriginal Lands - April to October 2000.
Water well monitoring data from wells on Aboriginal lands (Pitjantjatjara, Yalata and Nepabunna) are summarised for the period April to October 2000. Equipment failure was high, with faults recorded at 17 wells, particularly of the 2100P standing...-
Document
-
Oodla Wirra. Progress and technical reports to licence expiry/renewal, for the period 19/2/1970 to 18/8/1970.
There is no abstract created for this record-
Document
Published: 20 Aug 1970