-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-44, Wilgerup (southern Gawler Craton) haematitic iron ore prospect. Project final report.
Centrex Metals commenced reverse circulation exploration and resource definition drilling at the Wilgerup iron ore deposit on 6/9/2006, which was partly funded by the PACE Initiative as a Year 3 approved project, with funds allocated for 1000 m of RC...-
Document
Published: 20 Apr 2007
-
Data release [made at SA Director of Mines’ discretion] : Gum Flat. Annual reports submitted prior to the commencement of joint reporting on the Gum Flat Iron Ore Project, for the period 27/9/2005 to 26/9/2008.
An area lying immediately west of Port Lincoln and extending for ~10 km inland is being explored for buried occurrences of multiple metallic mineral commodities that may have been deposited within faulted, folded and metamorphosed Archaean basement...-
Document
Published: 20 Nov 2007
-
Balta Baltana Creek. Annual reports to licence expiry/full surrender, for the period 21/1/2010 to 20/1/2015.
An area located within the Mount Woods Inlier in the north of the Gawler Craton, which is centred ~70 km east-southeast of Coober Pedy, has been explored for possible economic buried Prominent Hill type IOCG mineralisation. No past mineral exploratory...-
Document
Published: 02 Feb 2015
-
Roopena. Annual reports plus final report to licence full surrender, for the period 23/8/2012 to 16/6/2016.
A small area centred ~10 km north-west of Whyalla, straddling the Iron Knob Road and extending northwards from there, has been explored for possible buried economic IOCG mineralisation that may have formed in Proterozoic basement rocks. During the...-
Document
Published: 17 Jun 2016
-
Data release - as updated : Lake Woorong. Annual reports to licence expiry/full surrender, for the period 8/6/2012 to 7/6/2019.
A large area centred ~80 km south-west of Coober Pedy has been explored for possible buried economic iron ore, including inferred DSO haematite mineralisation, and for base metal massive sulphide deposits that may have formed in Proterozoic basement...-
Document
Published: 30 Jul 2019
-
Data release - as updated [made at SA Director of Mines' discretion] : Painted Hill, Birthday Hill, White Hill, Mount Hawker, The Twins and Balta Baltana (the Mount Woods Project). Joint annual reports for the period 1/1/2011 to 31/12/2018.
Exploration activities undertaken on the Mount Woods Project during 2011 comprised: - ongoing target generation and geological interpretation - continued geological and structural interpretation of the Mount Woods Inlier - drilling of 80 rotary...-
Document
Published: 28 Feb 2019
-
Data release - as updated [made at SA Director of Mines’ discretion] : Carappee Hill. Annual reports for the period 20/2/2010 to 19/2/2019.
The continuation during 2010 of exploration of the Palaeoproterozoic bedrock in a small area located 60 km west-northwest of Cowell has mainly consisted of the conduct of three shallow drilling campaigns and the examination and analysis of downhole...-
Document
Published: 25 Feb 2019
-
Data release - as updated [made at SA Director of Mines’ discretion] : Windy Valley. Annual reports to licence expiry/renewal, for the period 25/1/2010 to 24/1/2015.
An area centred over the south-central Coober Pedy Ridge tectonic feature, 55 km south-southeast of Coober Pedy township, is being explored for possible economic buried massive haematite and magnetite within either Proterozoic banded iron formation...-
Document
Published: 17 Mar 2015
-
Data release - as updated [made at SA Director of Mines' discretion] : Eurilla, Lake Gilles, Moseley Nobs and Uno (the Northern Eyre Peninsula Project). Joint annual reports for the period 1/6/2010 to 31/5/2018.
Four tenements, which all lie within a 60 km radius to the north of the township of Kimba, and are mostly located around Lake Gilles, are continuing to be explored by grant licensee Lincoln Minerals Ltd (LML) and its joint venture partner IronClad...-
Document
Published: 30 Jul 2018
-
The Northern Gawler Project. Data release made in lieu of submitting partial surrender reports for ELs 5566 and 5567 upon renewal of those licences : joint annual reports for the period 1/2/2015 to 31/1/2020.
Portions of two tenements located to the south and south-east of Coober Pedy were relinquished at the start of 2020, and all mineral exploration data previously acquired by licensee Southern Iron on these tenements and on four others that now comprise...-
Document
Published: 28 May 2020
-
Data release - as updated [made at SA Director of Mines' discretion] : Eucolo Creek (also called the Churchill Dam Project). Annual reports for the period 31/1/2006 to 14/11/2018.
EL 3511 Eucolo Creek, of 528 square km, is situated near the eastern margin of the Gawler Craton within the Olympic Dam Domain, approximately 90 km south-west of the Olympic Dam IOCG-U deposit (3.98 billion tonnes at 1.1% Cu, 0.4 kg/t U3O8 and 0.5 g/t...-
Document
Published: 01 Dec 2018
-
Mineral Resource Potential Map Series - Willunga.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
Mineral Resource Potential Map Series - Wakefield.
There is no abstract created for this record-
Map
Published: 01 Jun 2015
-
Mulgathing (part of the Woomera Project). First partial surrender report for the period 22/6/2012 to 27/8/2015.
EL 4931, which is centred approximately 100 km north-east of Tarcoola, is being explored principally for potentially economic banded iron formation type iron ore occurrences, and for iron oxide - associated copper-gold mineralisation within the buried...-
Document
Published: 13 Aug 2015
-
Aston Hill (part of the Nawa Domain Project). Annual report and final report to licence surrender, for the period 25/6/2013 to 4/6/2015.
No work - reports only contain comments about the Project area's perceived prospectivity.-
Document
Published: 07 Sep 2015
-
Bindyi South. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 24/11/2017.
An area located immediately south of Bindyi Homestead on Koonamore Station was taken up to explore for possible economic stratabound iron ore (magnetite) hosted by metamorphosed Adelaidean glacial sedimentary strata of the Yudnamutana Subgroup....-
Document
Published: 24 Nov 2017
-
Mabel Creek [South-west]. Annual reports to licence expiry/full surrender, for the period 1/8/2014 to 31/7/2020.
A large area of ground surrounding the Paragon bore regional aeromagnetic anomaly complex was taken up to explore for possible buried economic occurrences of magnetite which could be hosted by Proterozoic BIF metasediments, as well as for possible...-
Document
Published: 18 Sep 2020
-
Data release - as updated : Gum Flat, Wanilla, Cummins, Tarlinga and Yeelanna (the Gum Flat Iron Ore Project). Joint annual reports submitted until the joint full surrender of remaining project licences, for the period 1/7/2010 to 18/01/2022.
During 2010-2011, the third year of the Gum Flat Iron Ore Project, owner Lincoln Minerals' exploration activities included: - Planning, site preparation and supervision of an RC and aircore drilling program; - Surveying and vegetation clearing for...-
Document
Published: 09 Jan 2020
-
Cockabidnie North (part of the Cockabidnie JV Project). Annual reports and final report to licence expiry/full surrender, for the period 23/8/2010 to 22/8/2015.
The subject very small licence area, located approximately 25 km north-west of Cleve, and which lies within the northern part of the NNE trending Kimban Campoona Syncline region located on central Eyre Peninsula, has been explored, in concert with...-
Document
Published: 06 Oct 2015
-
Mineral Resource Potential Map Series - Willochra.
There is no abstract created for this record-
Map
Published: 01 Sep 2016