-
Bindarrah. Annual reports to licence forfeiture/cancellation, for the period 30/4/2015 to 16/7/2019.
A licence area which consists of two separate small sub-blocks located ~35 km NE of Olary township has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of the...-
Document
-
Mount Victor Station. Information status at licence expiry/cancellation, for the period 3/5/2017 to May 2019 : no work reported.
There is no abstract created for this record-
Document
-
Faraway Hill. Information status at licence expiry/cancellation, for the period 23/6/2017 to May 2019 : no work reported.
There is no abstract created for this record-
Document
-
Data release [made at SA Director of Mines' discretion] : Border JV Project. Joint annual reports for the period 1/1/2015 to 31/12/2016.
During the first year of joint reporting for the five licences which are now subject to an amalgamated exploration expenditure agreement, work commenced with the acquisition of 31 line km of ground magnetic survey data over 9 proposed drill sites for...-
Document
-
Netley Gap. Annual reports and final report to licence expiry/full surrender, for the period 6/7/2016 to 5/7/2019.
A small licence comprising two separate sub-blocks located 4 km and 22 km south-east of Winnininnie on the Barrier Highway has been explored for possible buried economic, epithermal/hydrothermal structurally controlled copper-gold mineralisation that...-
Document
Published: 04 Sep 1919
-
Data release - as updated [made at SA Director of Mines' discretion] : Mutooroo mine, Bonython Hill, Mutooroo West, Oratan [Rock] and Cutana (the Curnamona South Project). Joint annual reports for the period 1/1/2014 to 31/12/2015.
Several separate areas that cover ground straddling the major tectonic boundary between the Olary and Broken Hill domains of the southern Curnamona Province are being explored for possible economic buried stratabound Proterozoic iron ore, epithermal...-
Document
-
Mutooroo (latterly part of the Border JV Project). Second partial surrender report at licence expiry/renewal, for the period 16/1/1997 to 18/4/2017.
Four separate large portions of a long-held licence area abutting the SA/NSW state border in the vicinity of Mutooroo have been relinquished as part of statutory requirements. The following summary prepared by Minotaur Exploration describes work done...-
Document
-
Razorback Ridge. Annual reports to licence forfeiture/cancellation, for the period 7/5/2015 to 20/6/2019.
A small licence area centred ~ 28 km south-southeast of Yunta, which consists of two separate sub-blocks, has been explored for possible economic stratabound iron ore mineralisation that could occur within buried glacial tillitic/siltstone strata of...-
Document
-
Wharton Hill. Annual reports and final report to licence expiry/full surrender, for the period 14/4/2016 to 13/4/2020.
An area covering the western end of the historic Anabama copper prospect in the Benda Range, south-west of Manna Hill, has been explored for possible buried economic, epithermal/hydrothermal structurally controlled copper-gold mineralisation that may...-
Document
Published: 05 Jun 1920
-
Data release - as updated [made at SA Director of Mines' discretion] : Devonborough Downs and Olary (the Olary Project). Joint annual reports for the period 21/1/2012 to 20/1/2014.
Two adjacent licences together covering a large area located to the south of the Barrier Highway between Olary and Manna Hill are being explored for possible large tonnage, mainly buried low grade magnetite deposits that could have formed within the...-
Document
-
Braemar. Progress report and final report to licence full surrender, for the period 15/10/1986 to 2/4/1987.
The assay results from 15 x 5 kg bulk leach extractable gold (BLEG) stream sediment samples taken from the Braemar Iron Formation outcrop area near Braemar Homestead provided little encouragement for further gold exploration (the highest value...-
Document
Published: 01 Jan 1987
-
Cutana. Data release made in lieu of submitting a second partial surrender report, for the period 10/12/2009 to 9/12/2018.
52 square km or ~24.9% of the former area of EL 5585 has been relinquished.-
Document
Published: 20 Mar 1919
-
Iron Peak. Progress reports and final report to licence expiry/full surrender, for the period 12/3/1986 to 11/3/1987.
Stratabound gold in rocks of the Adelaidean metasedimentary sequence was the target of exploration undertaken on Manunda Station, about 45 km south-east of Yunta. No significant gold values were detected in a programme of stream sediment bulk...-
Document
-
Mount Victor. Progress report for the period 29/10/1970 to 28/10/1971.
9 rock chip, mine dump, tailings, and hand auger alluvium samples were collected from abandoned gold workings. No significant assays were returned, and the area has limited potential for either bedrock or alluvial gold.-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Wadnaminga and Outalpa (the Olary JV Project, later renamed the Blue Rose Project). Joint annual reports for the period 19/7/2008 to 18/7/2018.
During Year 12 of the Olary JV Project (2008-2009), field work was undertaken only on EL 3849 Outalpa to make up for the earlier underspending on that licence relative to commitments. In early 2009, a ground radioactivity survey was acquired using a...-
Document
Published: 27 Nov 1918
-
Florieton. Progress reports and final report to licence full surrender, for the period 3/10/1985 to 12/5/1987.
Exploration for possible hydrothermal/epithermal gold deposits in the Adelaidean or older basement underlying an area located 50 km east of Burra has included the reprocessing of airborne magnetic survey data (1980 CRA Exploration Pty Ltd, Florieton...-
Document
-
Data release - as updated : Mutooroo (part of the Border Project). Annual reports [but excluding three separately held joint annual reports] and final report to licence expiry/full surrender, for the period 3/4/2007 to 18/4/2020.
During licence Year 11 (2007-2008), exploration activities on renewed EL 3745 included: • acquiring 1.9 line km of TEM profiles at Dingo prospect; • acquiring 21.4 line km of ground magnetic survey coverage at 1-metre station spacing on three...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Mount Victor. Annual reports for the period 30/7/2012 to 29/7/2018.
A large area of the south-eastern Flinders Ranges piedmont plains lying ~50 km north-west of Manna Hill, and centred on Mount Victor, is being explored for possible economic buried Neoproterozoic stratabound iron ore of low grade but probable high...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Boolcoomata, Macdonald Hill, Mingary, Bulloo South / Bulloo Creek, Drew Hill and Wompinie (the Drew Hill Project). Joint annual reports for the period 10/1/2008 to 9/1/2019.
During Year 6 of the project, on 28/3/2008, Exco entered into a Heads of Agreement with PMS, whereby the latter would be allowed to acquire a 50% interest in the White Dam Gold Project by sole funding the first A$9.6 million of expenditure on the...-
Document
-
Trinity mine area. Progress reports to licence expiry/renewal, for the period 31/8/1977 to 30/8/1979.
Ongoing exploration for Broken Hill - type mineralisation, across an enlarged licence area extending south and south-west from Cockburn to the edge of the Murraylands, consisted of intensive shallow auger/RAB bedrock drilling of geochemical and...-
Document