Mypolonga, Oakbank and Sturt Vale (part of CRA's Murray Basin Project). Final report at licences' joint full surrender, for the period 7/7/1980 to 20/6/1983.
As part of ongoing exploration of three areas in the western and northern Murray Basin, an open-file data review, in conjunction with the acquisition and interpretation of previous aeromagnetic and gravity data, provided a basis for CRAE's siting of 5...-
Document
Published: 04 Mar 1983
-
Chundie Swamps. Progress reports to licence expiry/renewal, for the period 13/3/1980 to 12/9/1981.
Drilling of 49 rotary mud and partially cored holes totalling 1443 m (of which only 20 holes penetrated into the top of the basement) has been undertaken at the eastern margin of the Eucla Basin to further outline an occurrence of Tertiary lignite...-
Document
Published: 05 Sep 1981
-
Ifould Lake, Eucla Basin, lignite exploration. Progress reports for the period 13/3/80 to 7/9/81.
14 rotary/cable tool holes were drilled to test for lignite and uranium.-
Document
Published: 01 Jan 1981
-
Warrior. Progress and final reports for the period 6/6/1975 to 10/7/1977.
The tenement was acquired to search for uranium contained within Tertiary palaeochannels. Uranium enriched zones were found in association with coaly or lignitic zones. Detail drilling is recommended to delineate the structure of the drainage system.-
Document
Published: 10 Jul 1977
-
Yarle Lakes and O'Malley Siding. Progress reports to licences' joint full surrender, for the period 20/6/1980 to 19/12/1981.
Two areas located approximately 45-55 km west of Ooldea were explored for possible buried Olympic Dam - type base metal deposits in poorly known Archaean to Early Proterozoic basement beneath the Eucla and Officer Basin sedimentary sequences. A...-
Document
-
Wombat Flat. Progress reports and final report to licence full surrender, for the period 19/2/1980 to July 1982.
The subject area, which covered the western onshore portion of the Polda Trough, was initially acquired to explore buried probable Carpentarian sediments for base metals and uranium, but a subsequent review of available information suggested that...-
Document
-
Bookabie. First partial surrender report, for the period 26/8/1994 to 25/8/1995.
Exploration for base and precious metals within an area 40-60 km north-west of Penong, now relinquished from the EL, comprised 5 km of ground magnetic surveys and aircore drilling of 4 resulting magnetic features (13 holes, total 626 m). The drilling...-
Document
-
Garford. Progress reports to licence expiry/full surrender, for the period 12/1/1981 to 11/1/1983.
Scout drilling of gravity low anomalies in the eastern half of the buried Permian Wallira Trough (11 rotary mud holes totalling 1135 m), in a search for possible economic Upper Permian coal seams which might extend westward from those discovered in...-
Document
Published: 07 Dec 1982
-
Coal in the Arckaringa Basin, South Australia. Appendix 2 to quarterly report for period ending 8/2/83.
This report reviews the evolution of depositional environments for the Australian Permian sequence, particularly in regard to the formation of coal, and describes the interpreted nature of sedimentation in the Arckaringa Basin. The depositional...-
Document
Published: 01 Jan 1982
-
Wilmington. Progress and final reports to licence expiry/full surrender for the period 23/8/1982 to 22/8/1983.
Exploration was carried out 50 km east of Port Augusta to try to locate possible concealed Triassic coal-bearing basins similar to the nearby Boolcunda and Springfield basins, and to assess the potential for economic Cainozoic lignite occurrences....-
Document
-
Drying of Wakefield coal in Monad Process.
Capital and operating costs of Monad process are estimated. Comparison with conventional drying processes is recommended.-
Document
-
Mount Igy. Progress reports to licence expiry/full surrender, for the period 13/3/1980 to 12/9/1981.
TARGET: To define lignite in the Wilkinson Lakes lignite deposit which is of a composition that would be suitable to undergo carbon beneficiation and/or coal liquefaction processes; also, any economic oil shale occurrences and/or sedimentary uranium...-
Document
Published: 02 Sep 1981
-
Wilkinson Lakes area. Relinquishment report, August 1975.
There is no abstract created for this record-
Document
-
Glencoe, County Grey. Progress reports for the period 13/3/80 to 30/9/81.
Drilling of 7 holes (total 330 metres) in the Mount Gambier area failed to intersect Tertiary brown coal.-
Document
Published: 01 Jan 1981
-
SAEI Triassic Coal Exploration Program. Phase 1 - Data review. Summary report.
This report documents the construction for MESA of a technical database on the potential for undiscovered Triassic coal within small intermontane basins of the north-central Flinders Ranges region, addressing all alluvium-covered areas that lie within...-
Document
-
Warrior. Progress reports for the period 27/9/78 to 25/6/80.
There is no abstract created for this record-
Document
Published: 01 Jan 1980
-
Moorlands coal [lignite] deposit. Progress reports to licence expiry/full surrender, for the period 16/4/1985 to 15/4/1986.
No field work was undertaken on the Moorlands Lignite Field. Work carried out consisted of letters written to Ariadne and to Coaltech requesting an evaluation of the Moorlands lignite for its suitability for use as a furnace feed. No offers were made...-
Document
-
Bulgunnia. Progress reports and final report to licence full surrender, for the period 12/2/1981 to 1/10/1982.
Initial bulk gravel sampling for diamond indicator minerals, and sampling of residual surface clays for base metals, returned negative results and only background values respectively. Subsequent rotary drilling of 3 holes (total 390 m), following...-
Document
Published: 26 Aug 1982
-
Solar drying of South Australian lignites.
Lignites were leached and dried to test feasibility for use as an auxiliary or start up fuel for a power station. Pilot plant tests indicate solar densified coal may be feasible for a production rate of 100 000 tonnes / annum.-
Document
-
Pyrolysis of Wakefield coal.
Products to be recovered from coal by pyrolysis are fuel gases, tar for conversion to liquid fuels, and char for gasification or direct combustion. Laboratory tests performed on Wakefield coal have determined the nature and yields of decomposition...-
Document