-
Mount Plantagenet. Progress reports, annual reports and final report to licence expiry/full surrender, for the period 8/1/1982 to 7/1/1986.
Detailed base and precious metals exploration undertaken by Utah Development Company in the area of the Worumba Anticline has targeted possible stratiform Zambian Copperbelt - type deposits. Exploratory work has included 72 geochemical vertical...-
Document
-
RB 37/00039 Report on the Copper King ochre deposits (near Beltana).
The Copper King orebody, located approximately 10 miles north-northeast of Beltana township, is a massive deposit of iron carbonate, the upper portion of which has been altered by oxidation and hydration to oxides of iron. The deposit was worked...-
Document
Published: 09 Mar 1954
-
RB 76/00148 Warrakimbo micaceous haematite deposit, secn 109, Hd Barnidoota, Co. Blachford. (ML 4521 - L. Morellato).
There is no abstract created for this record-
Document
Published: 18 Nov 1976
-
RB 99/00008 Burra miners 1860 - 1865 - An index to two Burra Burra mines' copper day books, July 1860 - November 1861, October 1863 - December 1865.
Burra was the largest metalliferous mine in Australia between 1845 and 1860, and employed up to 1,000 men and boys. The workforce was predominantly Cornish, Burra being the first significant concentration of Cornish immigrants in Australia. The...-
Document
Published: 01 May 1999
-
RB 99/00031 Assessment of zinc-lead prospectivity on the Murnaroo Platform and in the Manya Trough, eastern Officer Basin, South Australia.
The Neoproterozoic to Palaeozoic Officer Basin is located on and adjacent to the northwestern margin of the Gawler Craton. Deposition of the basin began in Adelaidean time, before and during the breakup of the supercontinent Rodinia. The...-
Document
Published: 01 Dec 1999
-
Archaeological survey of the Wallaroo copper smelters, Wallaroo, South Australia.
There is no abstract created for this record-
Document
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Mount Gunson ore controls as a basis for further exploration.
This report presents the geological setting and postulated ore controls for the Mount Gunson style of mineralisation, with an expansion on the inferred metal concentration mechanism and its quantitative feasibility. Recommendations for two optimal...-
Document
Published: 17 Aug 1971
-
The Bull engine, or direct- acting steam engine, in South Australia.
This technical report discusses the historical usage and the origin of a particular example of Cornish-invented steam powered engine technology, with reference to mining site remains and records of such engines used in South Australia, and those of...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Andamooka Creek, Willaroo Dam, Island Dam and Stuart Shelf / Andamooka Ranges (the Stuart Shelf Project). Joint annual reports on activities undertaken by the Joint Venture consortium, for the period 11/10/1996 to 10/10/2009 [ Index Part 2 of 2 ].
As a result of the BHP Billiton takeover of the Stuart Range Project, the mineral exploration strategy was changed. Formerly, WMC had been looking for economical targets of >500 Mt size containing on average more than 2.4% copper equivalent....-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Lake Torrens area. Annual reports for the period 6/4/2009 to 17/8/2018.
During the 2009-2010 reporting period, work completed by Straits included: • participation in Native Title and Land Access activities and negotiations, which have constituted the majority of the work undertaken; and • Holding numerous meetings and...-
Document
-
Area within Tallaringa Conservation Park. Biennial reports and final report to licence full surrender, for the period 25/10/196 to December 2001.
Proterozoic and Archaean rocks of the Gawler Craton were the target hosts for gold and base metal mineralisation in the area of the eastern Tallaringa Conservation Park, west of Coober Pedy. Following an assessment of geological and geophysical data,...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Kalabity. Annual reports for the period 25/2/2009 to 11/3/2019.
The main exploration activities undertaken during the first year of tenure of renewed EL 4239 (licence Year 6, 2009-2010) consisted of drill testing of uraniferous prospects defined by previous exploration, after the prior acquisition of an airborne...-
Document
-
Data release [made at SA Director of Mines' discretion] : Acropolis South and North Roxby. Joint annual reports for the period 26/4/2003 to 3/5/2009.
Exploration for possible economic deposits of buried, Mesoproterozoic basement-hosted IOCG-U style mineralisation is being conducted over two separate multiple-block licence areas in the Olympic Dam district, EL 2931 (Acropolis South) and EL 2932...-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Manners Well. Combined first annual/final report to licence expiry/full surrender, for the period 2/10/2018 to 1/10/2019.
An intensely faulted and folded area centred ~65 km north-east of Parachilna, where extensive hydrothermal alteration is evident in the Neoproterozoic bedrock, and where considerable past small-scale surface mining activity has occurred, but where no...-
Document
-
Lake Torrens South, Beda Arm and Carrapateena Arm (latterly the Lake Torrens Joint Venture Project). Annual reports (singular and combined) to licences' respective expiry/renewal, for the period 21/2/1996 to 7/1/2008.
Economic Olympic Dam style iron oxide - associated copper-gold (IOCG) mineralisation has been the target of exploration carried out in three adjoining areas which together extend for about 55 to 170 km north of Port Augusta, covering southern Lake...-
Document
-
Ruby Hill Project : Douglas Creek prospect drilling program. Final report, Project ADI RD02-288 [part of Accelerated Discovery Initiative Round 2, 2022].
Copper Search Australia Pty Ltd (a subsidiary of Copper Search Limited) was granted co-funding from the Department of Energy and Mining in July 2021 to a subsidy total of up to $228,000, to assist it with high risk exploration of remote parts of the...-
Document
-
Mount Gunson regional plans and reports.
Includes results of diamond drilling at Pernatty Lagoon to check reserves estimated from results of percussion drilling, and results of percussion drilling at the House workings to extend indicated reserves of run-of-mine grade sulphide ore....-
Document
Published: 01 Jan 1968