-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 4 partnership DPY4-50, Mount Hope Project area stratigraphic drilling on potential Archaean VHMS mineral prospects. Project final report.
The PACE Initiative Year 4 subsidised auger drilling programme undertaken on the Mount Hope (EL 3355) / Brimpton Lake (EL 3561) mineral exploration tenements was a trial to test the application of a new low cost drilling technique to exploring under...-
Document
-
[ Report on drilling ] Evaluation of the East Lagoon orebody, Mount Gunson, South Australia.
This report presents the results of ore definition drilling derived from 60 percussion and diamond drill holes put down over the central and southern parts of the East Lagoon orebody, and gives the methodology for calculating currently mineable ore...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-59, Kalkaroo Dome fault-hosted gold mineral prospects. Project final report.
The main aim of Havilah Exploration's PACE Initiative Year 3 approved drilling programme was to test the east-west trending, quartz-veined breccia zone that passes through the central Kalkaroo Dome, specifically in the footwall of the Kalkaroo Cu-Au...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-06, Mingary area stratiform, Broken Hill type base metal mineral prospects. Project final report.
Historic drilling undertaken on the NSW side of the state border with SA, adjacent to EL 2820, has encountered quartz-gahnite, meta-iron formation and meta-amphibolite rock types that have been correlated with the highly base metal - prospective...-
Document
-
Kalabity (part of the Strathearn Joint Venture Project). Data release at licence expiry/full surrender : progress reports and annual reports for the period 4/7/1988 to 15/10/2003.
The initial manager of the joint venture, CRA Exploration Pty Ltd (CRAE), targeted a range of copper, gold and uranium mineralisation styles, including vein-style uranium associated with carbonate rocks (Kintyre model), Olympic Dam style...-
Document
-
Lobethal (part of the Adelaide Hills Project). Data release made upon the commencement of project licences' joint reporting] : annual reports for the period 29/9/1993 to 3/3/2003.
A large, 722 square km area of the central Adelaide Hills extending between Jupiter Creek and the Warren Conservation Park is being explored for diamonds, gold and base metals, in host geological structures that appeared to be associated with...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-24, M1 oreshoot deep exploratory diamond drilling, Challenger mine area. Project final report.
Dominion Gold Operations applied for PACE Initiative Year 2 funding from PIRSA in 2005 to assist with the drilling of a deep diamond hole at its Challenger gold mine. The hole 'Wildcat 2' (05CDDH0072) aimed to test for the continuation of the M1 ore...-
Document
-
Summary of the structural setting of the Perseverance mine area, Tarcoola.
There is no abstract created for this record-
Document
Published: 31 Jul 1993
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 2 partnership no. DPY2-14, Willow IOCG mineral prospect. Project interim and final reports.
Bimbowrie EL 3278 is located within the Palaeoproterozoic Olary Domain of the Curnamona Province, South Australia. The property is prospective for a variety of mineralisation styles including granite batholith primary (hard-rock) uranium, Broken Hill...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Mount Toodla. Data release made at licence expiry/renewal as a reduced area : annual reports for the period 12/4/2000 to 11/4/2005.
Exploration for possible buried Olympic Dam style Cu-Au-U-REE deposits in Proterozoic basement on the eastern flanks of the Peake and Denison Ranges, in an area located approximately 65 km south-east of Oodnadatta, has concentrated on a very large...-
Document
-
Mines in Burnside - their historical significance.
This report on the history and condition of the abandoned pioneer silver-lead mines at Glen Osmond on Adelaide's eastern outskirts was prepared for the Burnside suburban council to allow it to make an informed discussion about the possibility of...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-38, Central Gawler Gold Province, Barns West and Baggy Green North gold prospects. [8 x RC drillholes] Project final report.
PACE Initiative Year 3 drilling project funds were secured by Adelaide Resources to evaluate a number of previously detected IP anomalies inferred to originate from sources in the Mesoproterozoic basement and saprolitic cover in the vicinity of the...-
Document
-
Screech-Owl Creek (part of Lake Torrens Project). Final report at licence surrender for the period 14/6/2000 to 20/4/2006.
Possible economic Neoproterozoic stratiform / hydrothermal copper mineralisation hidden under Mesozoic and Recent sedimentary cover was targeted in an area located approximately 95 km north-east of Andamooka. Aeromagnetic data interpretation of some...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 1 partnership DPY1-32, Ki Ki intrusion mafic/ultramafic - hosted mineral prospects. Project final report.
To further investigate the Cu-Ni-PGE mineral sulphide potential of a known buried mafic / ultramafic layered igneous intrusive complex situated near Ki Ki in the upper South-East, the licensee of EL 3295 sought PACE Initiative funding to complete two...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Crozier Hill (part of the Fleurieu Joint Venture Project). Data release : final report at licence expiry/full surrender, for the period 8/5/1995 to 30/11/2001.
Exploration for possible buried economic stratiform base metal deposits that may have formed within metamorphosed Cambrian volcanogenic sediments, which was carried out over an area extending between Port Elliot and Carrickalinga Head on the southern...-
Document
-
Wilkawillina [Gorge]. Information status at licence second partial relinquishment, for the period 2/11/2004 to 24/3/2005 : no work performed on the relinquished area.
There is no abstract created for this record-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. Theme 2 (drilling partnerships with PIRSA and industry) : Year 4 partnership no. DPY4-65, Chianti mineral prospect. Project completion dataset.
The subject set of reports describes the results of PACE Initiative Year 4 partly-subsidised drilling work conducted in the vicinity of the Chianti prospect, which lies approx. 20 km north of the old Mount Gunson mining camp. The aim of this work,...-
Document
-
Morialpa. Progress, annual and final reports to licence expiry/full surrender for the period 9/2/2003 to 8/2/2006.
Subsequent to a partial relinquishment of ground and related data release made in August 2003, ongoing exploration conducted over a small area located about 25 km north-northwest of Manna Hill township, looking for possible Zambian type stratiform...-
Document