-
Lake Frome. Progress reports to licence expiry/full surrender, for the period 18/12/1979 to 17/12/1981.
Ongoing exploration for possible Tertiary sediment-hosted roll front uranium occurrences in an area abutting western Lake Frome has consisted of the drilling of 7 open rotary holes for a total of 1384 m, to test ground midway between previously...-
Document
-
Frome Downs. Progress reports and partial relinquishment reports to licence expiry/renewal, for the period 20/6/1978 to 14/9/1982.
153 rotary mud open holes (total 19,689 m) and 11 cored holes (total 1384 m) have been drilled during the reporting period to evaluate the Goulds Dam uranium deposit and to further explore the region to its north and south for sedimentary uranium...-
Document
-
Kalabity. Progress reports to licence expiry/renewal for the period 15/3/1971 to 17/6/1973, plus related technical reports about in situ leach uranium mining methods in Wyoming.
The recently completed drilling of 189 open rotary holes (total penetration 22,427 m), plus the redrilling and geophysical re-logging by joint venturer Minad-Teton of 19 previously completed Carpentaria Exploration Co. uranium exploration holes (for a...-
Document
Published: 02 Jan 1974
-
RB 78/00117 Bumbarlow 1 - Well completion report.
Bumbarlow 1 (TD 720.33 m) aimed to test the lithology and petroleum potential of the Cambrian section in the central part of the eastern Arrowie Basin. It continuously cored a sequence over 300 m thick of flat-lying Proterozoic sediments interbedded...-
Document
Published: 01 Sep 1978
-
RB 77/00037;RB 00802 Palynology of selected samples from the Poontana Structure, Frome Embayment.
18 drill cuttings samples taken from 4 mineral exploration holes were examined for making palynological age determinations. 11 samples were variously identified as being sediments of Middle Miocene freshwater or Early Cretaceous marine facies.-
Document
Published: 23 Mar 1977
-
RB 81/00032 Stratigraphy and depositional environment of some silcretes in South Australia.
The widespread extent of silcretes in SA is demonstrated through stratigraphic relationships with palynologically dated sequences, and erosion of silcretes. The late Tertiary silcrete dominates the duricrusted landscape. Silica type varies according...-
Document
Published: 01 Mar 1981
-
RB 82/00061 Late Tertiary grey billy, and the age and origin of surficial silicifications (silcrete) in South Australia.
Age demonstrated by stratigraphic relationships with palynologically dated sequences, and evidence of erosion of silcretes.-
Document
Published: 01 Jan 1982
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 5 partnership DPY5-26 - south-western Cooper Basin district - Tertiary sedimentary uranium mineral prospects. Project interim and final reports.
As a PACE Initiative Year 5 drilling project that was approved for part-subsidy by PIRSA, a 16,777 m shallow rotary mud drilling programme was undertaken during the period August to November 2008 within five of the Sturt Joint Venture exploration...-
Document
Published: 31 Jan 1909
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-09, Yarramba Palaeochannel uranium mineral prospects. Project final report.
A PACE Initiative Year 3 subsidised drilling programme has been undertaken by the EL 3482 licensees over part of the Yarramba Palaeochannel north of the Honeymoon U deposit, seeking similar, Tertiary sediment-hosted roll-front uranium deposits in an...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-18, Glencoe (Lake Frome East) area roll-front style uranium mineral prospects. Project interim and final reports.
The subject EL 3391 is located in the eastern Lake Frome region, and is prospective for roll-front type uranium mineralisation emplaced within sediments of the Tertiary Lake Eyre Basin. In December 2006, as part of the PACE Initiative Year 3...-
Document
Published: 02 Mar 1907
-
Mundaerno South. Annual reports plus final report to licence expiry/full surrender, for the period 23/7/2007 to 22/7/2014.
A small area centred ~33 km north-west of Cockburn and ~26 km south-southeast of the Honeymoon deposit has been explored for possible buried, calcrete hosted secondary uranium deposits that may have formed in Quaternary valley fill sediments, and also...-
Document
Published: 20 Feb 1914
-
Data release - as updated : Lake Frome North (latterly part of The Lakes Uranium JV Project). Annual reports to licence expiry/full surrender, for the period 15/8/2005 to 25/11/2014.
An area on and surrounding the northern third of the Lake Frome salina was taken up to explore for possible economic buried roll front style sedimentary or calcrete-hosted uranium deposits that may have formed within Quaternary and Tertiary sediments...-
Document
Published: 01 Dec 1914
-
Data release made at renewal of the Sturt Joint Venture Project ELs 4062 through 4090, in lieu of submitting a joint partial surrender report for them : joint annual reports, for the period 25/2/2008 to 24/2/2013.
A very large area of the remote far north-east of the State was taken up early in 2008 by the unlisted Thorne-Clarke family company, to explore for sediment-hosted secondary uranium mineralisation of the type found in intracratonic sedimentary basins...-
Document
-
Data release - as updated : Security Dam. Annual reports plus final report to licence expiry/full surrender, for the period 27/8/2007 to 26/8/2017.
A small licence area located ~30 km north of Cockburn has been being explored for possible economic shallowly buried sedimentary roll front style uranium mineralisation that may have formed within inferred Tertiary fluvial channel sands of the...-
Document
Published: 10 Oct 1917
-
Data release - as updated [made at SA Director of Mines’ discretion] : Paralana Creek (part of the Beverley Project). Annual reports for the period 29/9/2009 to 15/11/2015.
Work undertaken on EL 4378 during the 2009-2010 reporting year included the drilling of 478 vertical rotary mud holes totalling 132,960 m, and core drilling totalling 4117 m performed in 16 of these holes for stratigraphic unit / resource...-
Document
Published: 24 Dec 1915
-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003
-
Mount Frome and Curnamona (part of the Siccus Joint Venture Project). Partial surrender reports for the period 4/8/1997 to 3/8/2000.
Interpretation of historical drilling and mapping data from four separate small areas located from 40 to 90 km south-west of Lake Frome has indicated that these areas are shallowly underlain by Late Proterozoic basement. Such locations are deemed as...-
Document
-
Lake Callabonna area (part of the Lake Elder Project). First partial surrender report, for the period 19/3/1998 to 18/3/2001.
Exploration for sedimentary uranium consisted of research and compilation of previous drilling data, including lithological logs, gamma logs and redox interface distribution maps. Such information compiled from six historical drillholes located in...-
Document
-
Yarramba. Progress reports to licence expiry/renewal for the period 8/3/1976 to 7/3/1978.
Ongoing exploration for sedimentary uranium ore deposited in buried 1.5 - 6 km wide and 50 m thick Tertiary palaeochannels in the Yarramba area, located adjacent to the SA-NSW border 50 km northwest of Cockburn, included three detailed and...-
Document
Published: 17 Apr 1978
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-54, north Benagerie Dome copper-gold mineral prospects. Project interim and final reports.
In early 2005 Havilah Resources applied for and was successful in gaining PACE Initiative funding for part of the cost of certain exploration drilling on its Benagerie Dome acreage, to carry out a programme with these aims: 1). To confirm, better...-
Document