RB 55/00006;Amdel 00126 Accessory minerals of South Australian granites.
The purpose of the work described was to compare and contrast the petrography, accessory minerals, and absolute ages of 25 granitic and allied rock samples collected from widely scattered localities in South Australia. The processes that are...-
Document
Published: 01 Aug 1961
-
RB 76/00122 Geology of the Kitticoola mine (with appendix on Palmer granite).
37 000 tonnes of gold-copper ore have been produced from the Kitticoola Mine in five phases of mining during its 150 year history. 30 000 tonnes were mined as gold ore, yielding 162 560 grams of gold at an average grade of 5.4 grams/tonne. 7 000...-
Document
Published: 01 Jan 1979
-
RB 92/00037 Review of mineral exploration, KINGOONYA 1:250 000 map area.
This report was prepared as a summary of all open file mineral exploration data from the KINGOONYA 1:250000 mapsheet area that are held in the SADME records management Envelope system. The aim of the holdings review was to describe past exploration,...-
Document
Published: 29 Nov 1991
-
Mabel Creek. Annual reports submitted until the commencement of joint licence reporting on the Mabel Creek JV Project tenements, for the period 20/12/1999 to 23/3/2006.
Exploration currently underway for possible economic buried iron oxide - associated copper-gold (IOCG) mineralisation within Proterozoic basement on the Mabel Creek High, in one of two joint venture group project licence areas located approximately 50...-
Document
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release made upon the expiry/full surrender of subsequent licences : respective annual and joint annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 1 of 2 ].
[ Note - here is only Part 1 of an abstract relating to 2 separately indexed parts ]. The subject two areas covering the northern outcropping Peake and Denison Ranges basement inliers were taken up by Pancontinental Mining to test for possible...-
Document
-
Tarcoola. Data release in lieu of a 25% second partial surrender at licence renewal : progress and annual reports for the period 7/12/1990 to 20/4/2003. [ Index Part 1 of 4 ].
The abstract for this Envelope is contained (in three parts) as separately indexed records, due to SAMREF database system individual record data size limits presently applicable.-
Document
-
Codna Hill, Pumper Dam, Welcome Bore and Beresford Hill (part of Curdimurka Project). Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 20/8/2007 to 26/8/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
Published: 28 Jan 1909
-
The Neales River Project. Data release at licences' joint surrender on 1/12/2008: combined first annual report for the period 17/5/2007 to 16/5/2008.
As part of a regional search for possible economic buried Olympic Dam type IOCG-U deposits emplaced along the north-eastern margin of the Gawler Craton, adjacent to the Peake and Denison Inliers, Barrick Gold has acquired infill helicopter-borne...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 2 partnership DPY2-21, Yarlbrinda Shear Zone, subsidiary fault plays, Tunkillia - style gold prospects. Project final report.
It has lately been recognised by explorers that subsidiary fault splays developed adjacent to the main Yarlbrinda Shear Zone may be more prospective for hydrothermal gold deposits than the main zone. In an approved PACE Initiative Year 2 drilling...-
Document
-
Margaret Creek (part of the G2 Lineament Project). First and second partial relinquishments' combined report, for the period 13/10/2000 to 12/10/2004.
Diamond exploration undertaken within the relinquished portions of EL 2759, which are located immediately south of William Creek and near the Oodnadatta Track, was focussed on the margin of the Gawler Craton where it is cut by the NNW-trending G2...-
Document
-
Aurora Tank. Annual reports and final report to licence expiry/full surrender, for the period 26/3/1998 to 3/8/2006.
Exploration for Challenger - style vein gold deposits within concealed Archaean basement has been carried out in two licence subareas located on the northern part of the Commonwealth Hill pastoral lease, under a joint venture between the principal...-
Document
Published: 31 Jul 1907
-
Giles Nob. Progress reports to licence expiry/full surrender, for the period 8/7/1983 to 7/7/1988.
Exploration for possible economic gold deposits in an area located approximately 25 km south of Olary addressed three principal objectives: . hydrothermally-sourced gold within quartz-albite-dolomite vein stockworks formed in phyllitic siltstones of...-
Document
-
Peake and Denison Ranges. Data release made at subsequent licences' expiry/full surrender : annual reports for the period 12/7/1993 to 11/7/1995.
An area covering most of the northern outcropping Peake and Denison Ranges basement inliers was taken up by Pancontinental Mining to test for possible economic occurrences of lead-zinc and copper-gold mineralisation (broadly matching Mount Isa Block,...-
Document
-
Tallaringa and Mount Igy (the Tallaringa JV Project). Joint annual reports to licences' joint full surrender, for the period 18/1/2009 to 6/2/2015.
During the 2009-2010 project joint reporting year, the following activities occurred: - the conduct of an Aboriginal heritage work area clearance survey in the northern part of EL 3485 Tallaringa by the Antakarinja Land Management Council Native...-
Document
-
Data release - as updated [made at SA Director of Mines’ discretion] : Tarcoola. Annual reports for the period 2/6/2008 to 29/7/2018.
During the first year of renewed EL 4167, in October and November 2008, Stellar Resources Ltd ("Stellar") completed a 5 hole, 1286.9 m RC and 2 hole, 157.1 m diamond cored inclined drilling programme at the Coolybring prospect which is located...-
Document
Published: 11 Sep 1918
-
Data release - as updated [made at SA Director of Mines’ discretion] : Aurora Tank. First annual report for the period 2/2/2010 to 1/2/2012, plus the next submitted licence-specific annual reports for the period 21/3/2013 to 1/2/2016.
No field work was done on the subject licence during its first year, while land access permissions were being organised with the required authorities. The licence area is located approximately 100 km south-west of Coober Pedy and lies within the...-
Document
-
PACE Discovery Drilling (drilling partnerships with DSD and industry): Year 8 partnership DPY8-06 - Intercept Hill, Stuart Shelf, Mesoproterozoic IOCGU mineral prospects. Drilling project final report.
EL 5372 Intercept Hill is centrally located in the world class Olympic Dam Iron Oxide Cu-Au-U Province, at the centre of a cluster of iron oxide copper occurrences including Emmie Bluff, Oak Dam and Winjabbie. The Intercept Hill area has available...-
Document
Published: 19 Jan 1916
-
Giddi Giddina Creek, Leonard Rise, Mabel Creek and Cotton Bush (the Coober Pedy IOCG Project). Joint annual reports and final report to licences' joint full surrender, for the period 01/5/2013 to 12/1/2017.
Two separate grouped licence areas located to the north and the south-southwest of Coober Pedy have been explored for possible large buried economic basement-hosted IOCG deposits that would be of interest to new SA mineral explorer Vale (the...-
Document
Published: 15 Dec 1916
-
Curnamona Province.
CURNAMONA PROVINCE SUMMARY Age: Sedimentation - late Palaeoproterozoic to early Mesoproterozoic. Felsic and mafic volcanism - late Palaeoproterozoic to early Mesoproterozoic. Granitic intrusion - late Palaeoproterozoic to early...-
Document
Published: 01 Jan 2003
-
Data release - as updated [made at SA Director of Mines’ discretion] : Bimbowrie. Annual reports for the period 4/11/2009 to 11/11/2018.
During licence Year 6 (2009-2010), the first year of tenure of renewed EL 4375, the main exploration activities undertaken by Sinosteel-PepinNini Curnamona Management Pty Ltd (SPCM) were to conduct two drilling campaigns, the first designed to...-
Document