-
Gravity and magnetic analysis Lagoon Hill area, South Australia. Appendix 1 in progress report for the period ended 3/11/1973.
There is no abstract created for this record-
Document
Published: 01 Jan 1973
-
Mount Denison and Mount Charles (the Peake and Denison Project). Data release upon the expiry/full surrender of subsequent licences : respective annual and combined annual reports for the period 1/6/1994 to 31/5/1999. [ Index Part 2 of 2 ].
[ Note - here is only Part 2 of an abstract relating to 2 separately indexed parts ]. During the latter half of 1997, just before it transferred project management to BHP Minerals, Renison Gold Corp. carried out reconnaissance bedrock geochemical...-
Document
-
Data release - as updated : Edward Creek (part of the Edward Creek Joint Venture Project). Annual reports and final report to licence expiry/full surrender, for the period 23/9/2008 to 11/11/2018.
Reedy Lagoon Corp. (RLC) has continued to look for minerals other than diamond, operating as the manager of exploration work for base metals (mainly copper) and uranium that was undertaken by the Edward Creek Base Metal Joint Venture (“ECBMJV”) during...-
Document
-
Data release - as updated : Mount Toodla. Annual reports to licence expiry/full surrender, for the period 23/8/2005 to 18/11/2015.
Within a licence area centred ~65 km east of Oodnadatta and located about 320 km NNW of Olympic Dam, a major, high amplitude (10 mGal) regional gravity anomaly associated with magnetic anomalies and lying within the G2 transcontinental lineament...-
Document
-
Unlocking South Australia's Mineral and Energy Potential - A Plan for Accelerating Exploration. PACE Copper Discovery Drilling (drilling partnerships with DSD and industry) : Year 9 partnership no. DPY9-16 - Mount Denison. Drilling project final report.
A limited exploratory drill programme to test a deep target, that was partly subsidised by the SA Government under approved PACE Initiative Year 9 collaborative drilling project DPY9-16, was undertaken to investigate the potential for IOCG...-
Document
-
Peake Hill. Annual reports to licence expiry/full surrender, for the period 9/7/2013 to 8/7/2017.
A small area located on and adjacent to the eastern margin of the Denison Range, ~ 60 km south-east of Oodnadatta, has been explored for possible buried economic sediment-hosted uranium mineralisation. During licence Year 1 the licensee reviewed all...-
Document
-
Mount Kingston. Progress reports and final report to licence expiry/full surrender, for the period 10/10/1979 to 26/4/1984.
Diamond exploration undertaken over an area situated 70 km south-east of Oodnadatta included photogeological studies, the acquisition of a 2400 line km low level aerial magnetic and radiometric survey, and geochemical analyses of 452 reconnaissance...-
Document
-
West Lake Eyre. First progress report plus final report to licence full surrender, for the period 25/1/1980 to 13/6/1980.
Dampier Mining's main objective in taking out this licence was to test a large magnetic complex, situated east of the Peake and Denison Ranges and west of Lake Eyre, for possible economic buried base and precious metal deposits. Grid-based ground...-
Document
-
ComRev 008 Iron Ore in South Australia 2000
The iron-rich rocks of South Australia have been classified into six deposit types - residual, chemical sedimentary iron formations, Fe-skarn and, of lesser significance, hydrothermal, clastic and magmatic. Production has been overwhelmingly from...-
Document
-
Peake and Denison Project [Part]. Data release upon the surrender of licence. Annual report (15/4/1999) submitted until the commencement of the BHP Billiton - Rio Tinto JV combined reporting. Plus the JV final report on this licence, to 15/4/2003.
Exploration carried out over a south-eastern flanking portion of the Peake and Denison Inliers has targeted possible large-scale Proterozoic ironstone-hosted Cu-Au deposits within a highly magnetic, multiply deformed and metamorphosed buried basement...-
Document
-
Nilpinna (part of the Edward Creek Project). Third partial surrender report at licence expiry/renewal, for the period 28/10/1988 to 11/11/2014.
Exploration in a large area located ~120 km south-southeast of Oodnadatta, encompassing Adelaidean sediments and associated intrusive rocks of the Peake and Denison Inliers, has targeted copper and gold mineralisation, while potential for diamonds was...-
Document
-
Data release [made at SA Director of Mines' discretion] : Edward Creek (part of the Edward Creek Joint Venture Project). Progress reports and annual reports for the period 7/12/1987 to 22/9/2008. [ Index Part 1 of 2 ].
Diamond exploration undertaken within the southern of two adjoining licence areas taken up along part of the western flank of the Peake and Denison Ranges, that is centred ~100 km south-east of Oodnadatta, was aimed at discovering the source(s) of...-
Document
-
Warrina. Annual reports and final report to licence expiry/full surrender, for the period 22/3/2006 to 14/11/2013.
Exploration of an area centred 65 km north-east of Coober Pedy has continued from the licensee's previous work aimed at evaluating the IOCG mineralisation potential of Mesoproterozoic basement-hosted, large and regionally significant coincident...-
Document
-
Blyth Creek. Annual reports and final report to licence surrender, for the period 2/1/2007 to 30/9/2013.
Exploration for possible economic IOCG type base and precious metal deposits in buried basement rocks, and for possible roll front style sedimentary uranium mineralisation in overlying Jurassic-Cretaceous Eromanga Basin sediments, within an area...-
Document
-
PACE 2020 Discovery Drilling 2012 : Year 7 Drilling Partnership no. DPY7-26 - Energia Minerals Limited Gawler Craton Project, IOCG-prospective Blyth Creek BC4 gravity anomaly. Drilling project final report.
During July 2012, at a location approximately 90 km south-east of Oodnadatta, EL 3680 licensee Energia Minerals completed the drilling at the BC4 gravity anomaly target of a single vertical rotary mud/diamond tailed hole to a total depth of 144.3 m...-
Document
-
Mount Denison (part of the BHP Billiton - Rio Tinto - Phelps Dodge' Peake and Denison Joint Venture Project). First partial surrender report, for the period 12/7/1993 to 16/9/2003.
Exploration carried out over the northern Peake and Denison Ranges since 1993 has targeted possible large-scale Proterozoic iron oxide associated copper-gold (IOCG) deposits considered to have formed in stratigraphic/structural settings similar to...-
Document
-
RB 2020/00002 Gawler Craton Airborne Geophysical Survey Region 2B, Warrina – Enhanced geophysical imagery and magnetic source depth models.
This report presents the results of a study by the Geological Survey of South Australia and CSIRO Mineral Resources to enhance the expression of geological structure in geophysical images and derive depth to magnetic sources over Region 2B of the...-
Document
Published: 01 Feb 2020
- ZIP,
-
Lagoon Hill. Progress and final reports to licence surrender for the period 2/11/1972 to 1/11/1973.
Exploration for possible roll-front sedimentary uranium deposits developed in porous and arenaceous Upper Jurassic to Lower Cretaceous sediments of the Algebuckina Sandstone and Cadna-owie Formation, where these onlap likely uranium-providing...-
Document
Published: 08 Apr 1974
-
Mount Denison. Progress reports and final report to licence expiry/full surrender, for the period 19/11/1973 to 18/11/1974.
As part of a continuing search for possible Palaeoproterozoic unconformity and vein-related hydrothermal uranium deposits in the northern Peake and Denison Ranges basement outcrop region, prospective stratigraphic and structural features were mapped...-
Document
Published: 16 Jan 1975
-
Mount Carulina and Trapeze Hill (the Oodnadatta Project). Joint annual reports plus succeeding single licence annual reports to licence expiry/full surrender, for the period 6/3/1995 to 12/10/2009. [ Index Part 2 of 2 ].
[ Note - here is Part 2 of the abstract relating to 2 separately indexed parts ]. A new joint venture with Barrick Gold, pertaining to the renewed (as EL 3424) tenement, was signed on 8/2/2007, after which that company as operator undertook a 749...-
Document
Published: 09 Feb 2010