-
Roopena. Progress reports and final report to licence expiry/full surrender, for the period 30/6/1986 to 29/6/1988.
TARGET: Uranium in Proterozoic rocks in areas where these largely concealed by alluvial or weathered materials. EXPLORATION: RAB drilling during March-April 1987 (87 vertical open holes totalling 3583 m), investigation of radiometric anomalies...-
Document
Published: 01 Jan 1988
-
Dingo Hill. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
An area of the southern Stuart Shelf, with untested potential for hosting possible stratiform base metal deposits within a probable concealed Early Proterozoic sedimentary basin embayment, was explored by BP as part of their regional mineral...-
Document
-
Island Lagoon. Progress reports to licence expiry/renewal, for the period 23/3/1977 to 22/3/1979.
Basal Neoproterozoic Tapley Hill Formation - hosted stratiform copper was targeted primarily in this exploration programme, which consisted of reconnaissance deep percussion drilling (17 holes for a total advance of 4167 m) on the centres of...-
Document
-
ExpNotes WINTINNA: Explanatory Notes WINTINNA
A new generation, first edition WINTINNA 1:250 000 scale geological map and explanatory notes have been published. These documents represent the conclusion of the Geological Survey of South Australia's geological mapping program undertaken in the...-
Document
-
RB 2014/00005 WINTINNA, South Australia, [geological map] sheet SG53-14. South Australia. Geological Survey. 1:250 000 Series - Explanatory Notes.
The WINTINNA 1:250 000 mapsheet area lies between latitudes 27° to 28° South and longitudes 133°30’ to 135°00’ East. This ~16 400 square km area includes the Marla and Cadney Park settlements, and is crossed by the Stuart Highway and Adelaide to...-
Document
Published: 01 Mar 2015
-
Garford. Annual reports to licence full surrender, for the period 7/6/1994 to 14/6/2000.
Initial investigations undertaken in the Garford area, 170 km north-west of Tarcoola, comprised lag and soil geochemical sampling, ground magnetic surveying, and petrographic descriptions of outcrop samples. Follow-up aircore and RAB drilling (78...-
Document
-
Lake Labyrinth (part of the Gawler and the Labyrinth Joint Venture Projects). Data release at second partial relinquishment : project licences' combined annual reports for the period 27/8/1999 to 28/9/2008.
In a continuation of exploration for economic deposits of gold and base metal mineralisation in the Lake Labyrith area, joint venture operator MIM Exploration carried out a proprietary 'MIMDAS' geophysical survey (utilising combined dipole-dipole IP...-
Document
Published: 18 Mar 1909