-
Red Lake. Progress reports to licence expiry/renewal, for the period 23/2/1978 to 2/1/1983.
Exploration undertaken on ground situated east of Pernatty Lagoon has included the acquisition of extensive ground magnetic and gravity surveys plus a small aerial magnetic and radiometric survey, and performing many specific gravity and magnetic...-
Document
-
The MIM-Peko Stuart Shelf Joint Venture Project. Progress reports to licences' joint full surrender and their re-issue as a single replacement tenement, for the period 15/2/1983 to 20/10/1989.
Exploration for Olympic Dam-style Cu-Au-U mineralisation, undertaken over areas to the south-east of Arcoona Homestead and in the vicinity of Woomera township, has comprised numerous reconnaissance and then detailed gravity, ground magnetic and CSAMT...-
Document
-
Mount Gunson - Pernatty. Quarterly reports and annual reports to licence expiry/full surrender, for the period 14/2/1987 to 15/4/1994.
Ongoing copper exploration in the Mount Gunson area was directed primarily at locating economic stratiform mineralisation in the Tapley Hill Formation, which overlies Pandurra Formation and the associated Cattlegrid orebody. New work comprised...-
Document
-
Andamooka, Stuart Creek, Arcoona, Lake Torrens, Todds Dam, Lake Arthur, Woodforde Hill and Murdie Island (the Stuart Shelf Project). Joint first partial surrender report at licences' expiry/renewal, for the period 2/5/1975 to 16/6/1986.
WMC's Stuart Shelf exploration activities from 1975 to 1985 have sought mainly Olympic Dam style mineralisation (copper - uranium - precious metals in haematitic breccia host rocks), with lesser emphasis directed at: possible distal analogues of the...-
Document
-
Jenner Hill, Pearson Hill and Sandy Point (the Stuart Shelf JV Project). Joint progress reports, plus later annual reports and final report to full surrender of remnant licence EL 1808, for the overall period 4/10/1989 to 24/10/1996.
Exploration for Olympic Dam-style mineralisation, undertaken over an area centred ~15 km south-east of Arcoona Homestead on the Stuart Shelf, which includes WMC's formerly partly tested Emmie Bluff prospect, has comprised the acquisition of ground...-
Document
-
RB 56/00010 Whyalla Group: A pre-Adelaide System, post-Archaean group in Eyre Peninsula.
There is no abstract created for this record-
Document
Published: 01 Jan 1963
-
RB 84/00101 Compositions of some Adelaidean and Cambrian sedimentary rocks, South Australia.
56 whole rock major and trace element geochemical analyses of Adelaidean and Cambrian sedimentary rock drill core samples recovered from 6 diamond drillholes are presented. Many of the samples are carbonate - rich, and their lithologies include...-
Document
Published: 01 Dec 1984
-
RB 98/00008 Geochemical studies of the regolith at the Mount Gunson copper deposits, Stuart Shelf, South Australia.
The principal objective of the Cooperative Research Centre for Landscape Evolution and Mineral Exploration (CRC LEME) Shields Program and the Primary Industry and Resources of South Australia (PIRSA) Regolith Terranes Group in South Australia is to...-
Document
Published: 01 Feb 1998
-
An atlas of geochemical dispersion around the Cattlegrid orebody.
Geochemical indicators to buried stratabound copper mineralisation in the Cattlegrid orebody were studied in their primary and secondary dispersion patterns within the overburden, to try to elucidate the likely most effective elements and the possible...-
Document
-
PACE Theme 2 (drilling partnerships with PIRSA and industry): Year 3 partnership DPY3-04, Churchill Dam area iron oxide - associated copper-gold and uranium mineral prospect. Project interim and final reports.
EL 3511 licensee Debnal and its joint venture partner Venture Minerals are exploring an area of the eastern Gawler Craton having a predicted high potential for the discovery of Olympic Dam type iron oxide - associated copper-gold-uranium (IOCG-U)...-
Document
-
Mount Gunson. Extension of ore reserves proposal (as revised).
There is no abstract created for this record-
Document
-
Mount Gunson Mines' lease areas. Review of copper resources.
There is no abstract created for this record-
Document
-
Mount Gunson. Progress reports and technical reports to licence expiry/re-issue over a larger area, for the period 25/10/1979 to 20/12/1985.
As part of an ongoing search for extensions to the Cattlegrid orebody style of stratiform Cu-Fe-Mn mineralisation within its exploration licences on the Stuart Shelf, besides testing for any indications of Olympic Dam type Cu-U-Au deposits in the...-
Document
-
Port Augusta - Lake Torrens area. Progress reports and final report to licence full surrender, for the period 28/11/1979 to 29/10/1986.
There is no abstract created for this record-
Document
-
Data release - as updated [made at SA Director of Mines' discretion] : Carrapateena Arm, Hatch Hill, Beda Arm and Lake Torrens South (the OZ Minerals Carrapateena Project). Annual reports (separate and joint) for the period 8/1/2008 to 6/1/2016.
Exploration of the Lake Torrens JV Project area during 2008, managed by Teck Cominco Australia (Teck), consisted of diamond drilling some wedge holes off a parent to determine the lateral and vertical dimensions of bornite and chalcopyrite - dominated...-
Document
-
Woomera. Second partial surrender report, for the period 14/1/2013 to 13/1/2017.
An area located immediately south of Woomera township has been acquired to search for possible buried economic stratabound deposits of copper or other metals that may have formed in the Neoproterozoic and Mesoproterozoic cover sequence of the Stuart...-
Document
-
Hydrogeological data, lithologs and sample assays for water bores drilled during the period January 1974 to March 1976 in the Mount Gunson area.
During the period from January 1974 to March 1976, 35 vertical rotary percussion water wells were drilled and many were cased off, perforated and then fitted with submersible electric pumps and offtake piping, to supply mine process water to the Mount...-
Document
-
Lake Torrens - Port Augusta and Point Paterson areas. Progress reports to licence expiry/renewal, for the period 26/11/1977 to 30/11/1979.
SALT MINING STUDY: Field tests on the feasibility of Lake Torrens salt production to supply raw material for the planned Redcliff Petrochemical Project were continued, with project planning technical data demonstrations given to visiting officials of...-
Document
-
West Lake Torrens (part of the Murdie Project). Final report for geophysical, drilling and logistics program, Project ADI RD01-120 [part of Accelerated Discovery Initiative Round 1, 2021].
ADI funding was granted by DEM to Kelaray to conduct approved geophysical surveys and exploratory drilling and apply logistical support within its Murdie Project, for a combined expenditure of up to A$320,000. At the outset of the project, Kelaray...-
Document
-
Pandurra. Progress reports and final report to licence expiry/renewal, for the period 18/9/1979 to 17/9/1981.
Continued exploration for stratabound base metals across an area of the southern Stuart Shelf, extending west and north-west of Port Augusta, has included an evaluation of the results of previous stratigraphic drilling on the prior-held EL 332, plus...-
Document
Published: 16 Nov 1981